Skip to main content
Log in

A Fast Estimation Method of Soil Discharged by an Earth Pressure Balanced Shield Machine

  • Tunnel Engineering
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

The soil discharged by an earth pressure balanced (EPB) shield machine reflects ground loss and controls surface settlement. In engineering, the discharge was mainly estimated by weighing the tunnelling spoil, however, human disturbance and information lag bring serious hidden security risks to tunnel construction. Through the analysis of conveying flow and force of screw conveyor, an energy model of interaction between screw conveyor and soil discharged was proposed and verified experimentally. Then, the energy model was combined with the discharge equation and the force balance equation, and a semi-analytical method to fast estimate the soil discharged of the EPB shield machine was proposed. Taking an EPB shield construction project as an example, according to the data of earth pressure, the torque and the rotation of the screw conveyor recorded by EPB shield machine, the real-time soil discharged of EPB shield machine can be accurately estimated. The mean absolute error (MAE) of this method is 3.177 × 103 kg compared with the measured weight of tunnelling spoil, which verifies the rationality of the method and provides a method for further effective evaluation and control of ground loss.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

Download references

Acknowledgments

This work was financial supported by the National Natural Science Foundation of China (51809137), the Natural Science Foundation of Jiangsu Province (BK20180480) and Open Research Fund of State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences (Z017015).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ziming Xiong.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Wen, Z., Rong, X., Wang, Z. et al. A Fast Estimation Method of Soil Discharged by an Earth Pressure Balanced Shield Machine. KSCE J Civ Eng 25, 2239–2249 (2021). https://doi.org/10.1007/s12205-021-1107-5

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-021-1107-5

Keywords

Navigation