Skip to main content
Log in

Incorporating lost productivity calculation into delay analysis for construction projects

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

Schedule delays commonly occur in construction projects and often result in delay claims. Several studies have proposed different schedule delay analysis methodologies. By using as-planned and as-built schedules, most previous studies have concentrated on calculating the impact of identified delay events on project duration but have neglected to connect impact calculation from detailed delay evidence in their analyses. Lost productivity, which is a primary cause of schedule delays, entails the completion of work at less than the planned rate of production; it is usually experienced by contractors. To solve analysis problem of schedule delays associated with lost productivity, this study proposes a delay analysis method (the LOPE method) that integrates a lost productivity calculation approach and a well-known schedule delay analysis method, the collapsed as-built method. As demonstrated through a simplified case study, the proposed method is beneficial for calculating the impacts of schedule delays caused by lost productivity.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • AACE (2004). Estimating lost labor productivity in construction claims, AACE International Recommended Practice No. 25R-03, Morgantown.

    Google Scholar 

  • Al-Humaidi, H. M. and Tan, F. H. (2010). “A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models.” Civil Engineering and Environmental Systems, Vol. 27, No. 4, pp. 329–351.

    Article  Google Scholar 

  • Arditi, D. and Pattanakitchamroon, T. (2008). “Analysis methods in time-based claims.” Journal of Construction Engineering and Management, ASCE, Vol. 134, No. 4, pp. 242–252.

    Article  Google Scholar 

  • Baki, M. (1999). “Delay claims management in construction-a step-bystep approach.” Cost Engineering, Vol. 41, No. 10, pp. 36–38.

    Google Scholar 

  • Bordoli, D. W. and Baldwin, A. N. (1998). “A methodology for assessing construction project delays.” Construction Management and Economics, Vol. 16, No. 3, pp. 327–337.

    Article  Google Scholar 

  • Braimah, N. and Ndekugri, I. (2008). “Factors influencing the selection of delay analysis methodologies.” International Journal of Project Management, Vol. 26, No. 8, pp. 789–799.

    Article  Google Scholar 

  • David, A. and Thanat, P. (2006). “Selecting a delay analysis method in resolving construction claims.” International Journal of Project Management, Vol. 24, No. 2, pp. 145–155.

    Article  Google Scholar 

  • De La Garza, J. M., Prateapusanond, A., and Ambani, A. (2007). “Preallocation of total float in the application of a critical path method based construction contract.” Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 11, pp. 836–845.

    Article  Google Scholar 

  • Dieterle, R. A. and Gaines, T. A. (2011). “Practical issues in loss of efficiency claims.” Cost Engineering, Vol. 53, No. 2, pp. 29–34.

    Google Scholar 

  • Enshassi, A., Arain, F., and AlRaee, S. (2010). “Causes of variation orders in construction projects in the Gaza Strip.” Journal of Civil Engineering and Management, Vol. 16, No. 4, pp. 540–551.

    Article  Google Scholar 

  • Farrow, T. (2007). “Developments in the analysis of extensions of time.” Journal of Professional Issues in Engineering Education and Practice, ASCE, Vol. 133, No. 3, pp. 218–228.

    Article  Google Scholar 

  • Gothand, K. D. (2003). “Schedule delay analysis: Modified windows approach.” Cost Engineering, Vol. 45, No. 9, pp. 18–23.

    Google Scholar 

  • Gunduz, M. and Hanna, A. S. (2005). “Benchmarking change order impacts on productivity for electrical and mechanical projects.” Building and Environment, Vol. 40, No. 8, pp. 1068–1075.

    Article  Google Scholar 

  • Hegazy, T., Said, M., and Kassab, M. (2011). “Incorporating rework into construction schedule analysis.” Automation in Construction, Vol. 20, No. 8, pp. 1051–1059.

    Article  Google Scholar 

  • Hegazy, T. and Zhang, K. H. (2005). “Daily windows delay analysis.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 5, pp. 505–512.

    Article  Google Scholar 

  • Herbsman, Z. and Ellis, R. (1990). “Research of factors influencing construction productivity.” Construction Management and Economics, Vol. 8, No. 1, pp. 49–61.

    Article  Google Scholar 

  • Ibbs, W., Nguyen, L. D., and Simonian, L. (2011). “Concurrent delays and apportionment of damages.” Journal of Construction Engineering and Management, ASCE, Vol. 137, No. 2, pp. 119–126.

    Article  Google Scholar 

  • James, G. Z., Jr. (2001). “But-for schedules-analysis and defense.” Cost Engineering, Vol. 43, No. 8, pp. 13–17.

    Google Scholar 

  • Kao, C. K. and Yang, J. B. (2009). “Comparison of windows-based delay analysis methods.” International Journal of Project Management, Vol. 27, No. 4, pp. 408–418.

    Article  MathSciNet  Google Scholar 

  • Kazaz, A. and Ulubeyli, S. (2007). “Drivers of productivity among construction workers: A study in a developing country.” Building and Environment, Vol. 42, No. 5, pp. 2132–2140.

    Article  Google Scholar 

  • Kim, Y., Kim, K., and Shin, D. (2005). “Delay analysis method using delay section.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 11, pp. 1155–1164.

    Article  Google Scholar 

  • Klanac, G. P. and Nelson, E. L. (2004). “Trends in construction lost productivity claims.” Journal of Professional Issues in Engineering Education and Practice, ASCE, Vol. 130, No. 3, pp. 226–236.

    Article  Google Scholar 

  • Lee, J. S. and Diekmann, J. E. (2011). “Delay analysis considering production rate.” Canadian Journal of Civil Engineering, Vol. 38, No. 4, pp. 361–372.

    Article  Google Scholar 

  • Lee, H. S., Ryu, H. G., Yu, J. H., and Kim, J. J. (2005). “Method for calculating schedule delay considering lost productivity.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 11, pp. 1147–1154.

    Article  Google Scholar 

  • Lowe, J. G. (1987). “The measurement of productivity in the construction industry.” Construction Management and Economics, Vol. 5, No. 2, pp. 101–113.

    Article  MathSciNet  Google Scholar 

  • Mbabazi, A., Hegazy, T., and Saccomanno, F. (2005). “Modified but-for method for delay analysis.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 10, pp. 1142–1144.

    Article  Google Scholar 

  • Mohan, S. B. and Al-Gahtani, K. S. (2006). “Current delay analysis techniques and improvements.” Cost Engineering, Vol. 48, No. 9, pp. 12–21.

    Google Scholar 

  • Nguyen, L. D. and Ibbs, W. (2008). “FLORA: New forensic schedule analysis technique.” Journal of Construction Engineering and Management, ASCE, Vol. 134, No. 7, pp. 483–491.

    Article  Google Scholar 

  • Proverbs, D. G., Holt, G. D. and Olomolaiye, P. O. (1998). “Factors impacting construction project duration: A comparison between France, Germany and the U.K.” Building and Environment, Vol. 34, No. 2, pp. 197–204.

    Article  Google Scholar 

  • Sakka, Z. I. and El-Sayegh, S. M. (2007). “Float consumption impact on cost and schedule in the construction industry.” Journal of Construction Engineering and Management, ASCE, Vol. 133, No. 2, pp. 124–130.

    Article  Google Scholar 

  • Song, L. and AbouRizk, S. M. (2008). “Measuring and modeling labor productivity using historical data.” Journal of Construction Engineering and Management, Vol. 134, No. 10, pp. 786–794.

    Article  Google Scholar 

  • Trauner, T. J. (2009). Construction delays understanding them clearly, analyzing them correctly, Amsterdam, Boston, Butterworth-Heinemann.

    Google Scholar 

  • Yang, J. B., Huang, K. M. and Lee, C. H. (2010). “Evaluation of delay analysis methodologies on lost productivity in construction projects.” International Symposium on Automation and Robotics in Construction 2010 (ISARC 2010), June 25–27, 2010, Bratislava, Slovakia.

    Google Scholar 

  • Yang, J. B. and Kao, C. K. (2011). “Critical path effect based delay analysis method for construction projects.” International Journal of Project Management, Vol. 30, No. 3, pp. 385–397.

    Article  Google Scholar 

  • Yang, J. B. and Yin, P. C. (2009). “Isolated collapsed but-for delay analysis methodology.” Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 7, pp. 570–578.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jyh-Bin Yang.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yang, JB., Huang, KM., Lee, CH. et al. Incorporating lost productivity calculation into delay analysis for construction projects. KSCE J Civ Eng 18, 380–388 (2014). https://doi.org/10.1007/s12205-014-0128-8

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-014-0128-8

Keywords

Navigation