Abstract
Construction delay is the one of major factors globally which have a high impact in countries’ economy and development in UAE and any other countries. The present paper reports an exploratory research study of previous international research into delay factors affecting project delivery. The objective of this research was to provide a general overview of construction delays in order to recognize the main groups of delays and compare the UAE construction projects with international studies. In total, 14 groups were found to contribute to causing construction delays. Studies of the international and UAE construction industry are in agreement that the main group of factors that affect project completion are management factors; then, the second group comprises financial factors however the top 3 groups in UAE are contractor management group, client financial group and the client management group. In international the top 3 groups are contractor management group, client management group and the third is contractor financial group.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Alghbari W, Razali M, Salim A, Ernawati (2007). The significant factors causing delay of building construction projects in Malaysia. J Eng Constr Archit Manag 14(2):192–206
Almutairi NS (2016) Causes of delays on construction projects in Kuwait according to opinion of engineers working in Kuwait. Int J Eng Res Appl 84–96
Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Project Manage 24(4):349–357
Economy UAEMO (2017) Annual economic report, 2017. UAE Retrieved from http://www.economy.gov.ae/EconomicalReportsEn/MOEAnnualReport2017_English.pdf
Emam H, Farrell P, Abdelaal M (2015) Causes of delay on infrastructure projects in Qatar. Paper presented at the proceedings of the 31st annual ARCOM Conference, Lincoln, UK, Association of Researchers in Construction Management, Nottingham, UK
Hegazy S (2012) Delay analysis methodology in UAE construction project: delay claims, literature review. PM World J 1(2):1–21
Kazaz A, Ulubeyli S, Tuncbilekli NA (2012) Causes of delays in construction projects in Turkey. J Civil Eng Manag 18(3):426–435
Mohammed SR, Jasim AJ (2017) Study and analysis of the delay problems in Iraqi construction projects. Int J Sci Res. https://doi.org/10.21275/ART20173791
Motaleb O, Kishk M (2013) An investigation into the risk of construction projects delays in the UAE. Int J Inf Technol Project Manag(IJITPM) 4(3):50–65
Samarah A, Bekr GA (2016) Causes and effects of delay in public construction projects in Jordan. Am J Eng Res (AJER) 87–94
Sunjka BP, Jacob U (2013) Significant causes and effects of project delays in the Niger delta region, Nigeria. Paper presented at the SAIIE25 proceedings
Taha G, Badawy M, El-Nawawy O (2016) A model for evaluation of delays in construction projects. Int J Innov Res Sci Eng Technol 3021–3028
Thorat S, Khandare MA, Kanase AK (2017) Identifying the causes and effects of delay in residential projects
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this paper
Cite this paper
AlGheth, A., Ishak Sayuti, M. (2020). Review of Delay Causes in Construction Projects. In: Mohamed Nazri, F. (eds) Proceedings of AICCE'19. AICCE 2019. Lecture Notes in Civil Engineering, vol 53. Springer, Cham. https://doi.org/10.1007/978-3-030-32816-0_28
Download citation
DOI: https://doi.org/10.1007/978-3-030-32816-0_28
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-32815-3
Online ISBN: 978-3-030-32816-0
eBook Packages: EngineeringEngineering (R0)