Integrated design management system for mega infrastructure projects: A case study in Korea

  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

In the case of fast track construction, where the design and construction phases are carried out in parallel to shorten the project delivery duration, establishing a Design Management System (DMS) to reduce the interference between design and construction activities has received more attention both from researchers and industry professionals. Especially, in investment projects like mega infrastructure projects, where the total duration of the project is directly related to the profitability of the project, effectiveness of the communication channels and strength of collaboration relations between the design and construction teams can be achieved through effective integration of the DMS with Project Management System (PMS). Within the context of this paper, a framework for DMS used in a mega infrastructure project in Korea will be introduced and its integration with the PMS using the case study will be discussed. This paper briefly demonstrates the responsibility distribution and management of design processes at different design levels. The system also argues how the information exchange is performed between design and construction teams via the integration of design and construction schedule.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ahuja, H.N. and Walsh, M.A. (1983). Successful Methods in Cost Engineering, John Wiley & Son, New York, NY.

    Google Scholar 

  • Barrie, D.S. and Paulson, B.C. (1992). Professional Construction Management, 3rd edition, McGraw-Hill International, Singapore.

    Google Scholar 

  • Construction Management Association of America (CMAA) (2002). Construction Management Standards of Practice, 2002 edition, CMAA.

  • Kerzner, H. (1995). Project Management, 5th edition, Van Nostrand Reinhold, New York.

    Google Scholar 

  • Kim, Y.S. and Lee, Y.H. (2003). “Concept and Key Points of Design Management.” Korean Journal of Construction Engineering and Management, Vol. 4, pp. 3–9.

    Google Scholar 

  • Kim, J.H., Koo, K.J., and Hyun, C.T. (2003). “A Study on the Sucess Model for Design-Build Delivery Method Process.” Korean Journal of Construction Engineering and Management, Vol. 4, pp. 119–127.

    Google Scholar 

  • Ministry of Construction and Transportation (MOCT) (1999). Master Plan for Enhancing Efficiency in Public Construction Projects, Korea.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hyung-Keun Park.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Park, HK., Ryoo, B. Integrated design management system for mega infrastructure projects: A case study in Korea. KSCE J Civ Eng 12, 85–90 (2008). https://doi.org/10.1007/s12205-008-0085-1

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-008-0085-1

Keywords

Navigation