Abstract
Forging companies are nearly exclusively embedded into supply chains as suppliers and consequently have to accomplish strict requirements concerning their logistic performance. For providing products flexible and responsive to the market proactive supply chain management systems need to be introduced for a quick and reliable delivery to costumers in-time with low risks of failures. Therefore, this paper describes a comprehensive approach for the implementation of operative logistic risk management in the PPC within flexible supply chains. The method developed applies proven statistical fundamentals (e.g. trend analysis) to logistic risk management with the purpose of identifying potential logistic risks, estimating their impact and ranking them according to their importance. Hence, counter measures can be deduced and tested based on material flow simulation to counter balance the identified potential logistic risks.
Similar content being viewed by others
References
Reinsch S, Von Gleich C–F, Ouali K (2003) Logistic oriented supply chain monitoring. In: Progress in manufacturing systems. Proceedings 36th CIRP international seminar on manufacturing systems, Germany
Von Gleich CF, Franzke S, Jacobsen A (2002) Messung undVisualisierung von Primärbedarfsschwankungen, 4th edn. Industrie Management, Germany
Ouali K, Reinsch S (2004) Logistic performance controlling—assessment and continuous improvement of processes. In: COMA (2004)—conference on competitive manufacturing, South Africa
SFB489-C4 Arbeits- und Ergebnisbericht 2000–2002
Rohde J, Meyr H, Wagner M (2000) Die supply chain matrix, 1st edn. PPS Management, Germany
Wannenwetsch H (2007) Integrierte Materialwirtschaft und Logistik, 3rd edn. Springer, Germany
Luczak H, Eversheim W, Schotten M (1998) Produktionsplanung und Steuerung, Springer, Germany
Reinsch S (2003) Kennzahlenbasierte Positionierung der Logistik von Lieferketten. Dissertation, Leibniz University of Hanover, Germany
Kerner A (2002) Modellbasierte Beurteilung der Logistikkosten von Prozessketten. Dissertation, Leibniz University of Hanover, Germany
Nyhuis P, Wiendahl H-P (2002) Logistische Kennlinien: Grundlagen, Werkzeuge und Anwendungen, 2nd edn. Springer, Germany
Giesbrecht F, Marcia F, Gumbertz L (2004) Planning, construction and statistical analysis of designed experiments. Wiley, New York
Fang K-T, Li R, Sudjianto A (2006) Design and modelling for computer experiments, computer science and data analysis serie. Chapman & Hall/CRC, USA
Goldberg D-E (2002) The design of innovation,lessons from and for competent genetic algorithms. Addison-Wesley, USA
Kanitz F (2002) Kennzahlenbasierte Fehleridentifizierung in der Beschaffungslogistik. Dissertation, Leibniz University of Hanover, Germany
Yu K-W (2001) Terminkennlinie—Eine Beschreibungsmethodik für Terminabweichung m Produktionsbereich, Dissertation, Leibniz University of Hanover, Germany
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Wiendahl, HP., Selaouti, A. & Nickel, R. Proactive supply chain management in the forging industry. Prod. Eng. Res. Devel. 2, 425–430 (2008). https://doi.org/10.1007/s11740-008-0121-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11740-008-0121-5