1000 MW ultra-supercritical turbine steam parameter optimization

  • Research Article
  • Published:
Frontiers of Energy and Power Engineering in China Aims and scope Submit manuscript

Abstract

The 2×1000 MW ultra-supercritical steam turbine of Shanghai Waigaoqiao Phase III project, which uses grid frequency regulation and overload control through an overload valve, is manufactured by Shanghai Turbine Company using Siemens technology. Through optimization, the steam pressure is regarded as the criterion between constant pressure and sliding pressure operation. At high circulating water temperature, the turbine overload valve is kept closed when the unit load is lower than 1000 MW while at other circulating water temperatures the turbine can run in sliding pressure operation when the unit load is higher than 1000 MW and the pressure is lower than 27 MPa This increases the unit operation efficiency. The 3D bending technology in the critical piping helps to reduce the project investment and minimize the reheat system pressure drop which improves the unit operation efficiency and safety. By choosing lower circulating water design temperature and by setting the individual Boiler Feedwater Turbine condenser to reduce the exhaust steam flow and the heat load to the main condenser, the unit average back pressure and the terminal temperature difference are minimized. Therefore, the unit heat efficiency is increased.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Feng Weizhong. Technical features of 900MWsteam turbines in Waigaoqiao phase 2 power plant. Thermal Power Generation, 2003, 32 (6): 2–5, 10 (in Chinese)

    Google Scholar 

  2. Feng Weizhong. The performance traits and the analysis of 900 MW super-critical turbine. Thermal Turbine, 2005, 34 (4): 197–202 (in Chinese)

    Google Scholar 

  3. Shen Shiyi, et al. Steam Turbine Theory. Beijing: Water Resource and Electric Power Press, 1992 (in Chinese)

    Google Scholar 

  4. Feng Weizhong. Technical features of GW SIEMENS steam turbines. East China Electric Power, 2003, (Suppl.): 12–16 (in Chinese)

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Weizhong Feng.

Additional information

__________

Translated from Journal of Power Engineering, 2007, 27(3): 305–309, 331 [译自 : 动力工程]

Rights and permissions

Reprints and permissions

About this article

Cite this article

Feng, W. 1000 MW ultra-supercritical turbine steam parameter optimization. Front. Energy Power Eng. China 2, 187–193 (2008). https://doi.org/10.1007/s11708-008-0030-5

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11708-008-0030-5

Keywords

Navigation