Introduction

The heat recovery steam generator (HRSG) is a piece of equipment used in combined cycle power plant systems. Its function is to utilize the heat from the combustion gases that exit a gas turbine to produce the steam needed by the turbine. The SGPP system can operate independently with the GPP system and without the SPP system by closing the diverter damper flap to the HRSG. The HRSG system consists of a high-pressure (HP) superheater, an HP evaporator, an HP2 economizer, a low-pressure (LP) evaporator, an HP1 economizer, and an LP economizer. If the HRSG equipment is used continuously, its reliability value will decrease due to usage over time and various factors that may cause equipment failure [1, 2]. During the start-up process, the most critical factor is the rapid increase of all operating parameters, including temperature, pressure, and mass flow. During this period, the HRSG components, especially the steam drum, are subject to high thermal stress caused by uneven metal temperature distribution [3]. HRSG tube failure is one of the most frequent causes of forced power plant outages [4]. In a local power plant, one of the boilers has experienced several defects and failures after running for approximately 85,000 h [5]. HRSG failures often affect the performance of power generations system [2,3,4,5,6]. It has been reported that HRSG pipe failures are generally caused by creep damage [7,8,9], fatigue [10,11,12], excessive thermal stresses, water/steam corrosion [13], and short-term overheating [14].

The SGPP which is being studied in this paper has six HRSGs with a capacity of 200 ton/h each, and all face the same issue: failures in the LP evaporator, particularly in the west-side pipe (outlet pipe). This study focuses on one HRSG, examining its temperature and pressure distribution, as shown in Fig. 1. The failure analysis of the HRSG system is centered on the LP evaporator, and a detailed schematic of the inlet and outlet section is depicted in Fig. 2 with a red circle. The LP evaporator’s working pressure is three bar-G, with flue gas inlet and outlet temperatures of approximately 241.4 and 167.1 °C, respectively. The low-pressure system’s resulting steam flow rate is 65.4 ton/h. A rupture in the low-pressure evaporator pipe can cause the entire system to cease functioning, so investigating the causes of the pipe’s failure was imperative.

Fig. 1
figure 1

The HRSG schematic with temperature and pressure distributions

Fig. 2
figure 2

Schematic of the LP evaporator

In Fig. 3, it is apparent that there was a leak in the LP evaporator pipe that had been in operation for over four years. The leak was located on the side of the pipe, while the connection with the header was leaking on the inner side of the pipe. This investigation aimed to determine the mechanism and cause of the low-pressure evaporator failure in HRSG pipes with a capacity of 200 ton/h at SGPP to prevent it from happening again in the future. Additionally, this study aimed to provide useful maintenance information and minimize unplanned downtime incidents.

Fig. 3
figure 3

Failure location: (a) leak on pipe and header joint and (b) leaks on the pipe bend

Methodology

Leakage failure at the LP Evaporator HRSG was a recurrent issue in all HRSG units operated at the SGPP studied in this paper. Therefore, various experimental and measurement methods were necessary to determine the cause of failure. Some of these methods included visual investigation, ultrasonic thickness (UT) thickness, microstructural analysis, verification of material composition, hardness and tensile tests, and thermal analysis.

A visual examination was conducted on both the west-side and east-side pipes of the LP evaporator near the failure zone, and images were taken to document the nature of the failure. The visual inspection was performed using both the naked eye and a portable magnifying lens. Additionally, the exterior diameter of the failed tube was measured both at the point of failure and in an unbroken zone.

Moreover, non-destructive testing (NDT) was conducted to support the visual inspection, using section V of the American Society of Mechanical Engineering (ASME) Boiler and Pressure Vessel Code, and American Standard of Testing Materials (ASTM) E165 standards. The spray penetrant MagnaFlux SKL-SP1, emulsifier MagnaFlux SKC-S, and developer MagnaFlux SKD-S2 were used with a dwell time of 12 min per sample to determine any indications of leaks in the LP evaporator pipe.

The GE Sensing and Inspection Tech Series DMSE Probe (DA501) with Check-Line TI-CMXDL Series 8672 Probe Ø 0.250” 5 MHZ was utilized to carry out the ultrasonic thickness (UT) measurement. This measurement aimed to determine the minimum thickness in the measured area. Each measurement location was tested four times with different measurement orientations, as illustrated in Fig. 4. The sample taken was from the failed west-side of the LP evaporator pipe, while another sample was obtained from the non-failed east side of the LP evaporator pipe for comparison. However, both LP evaporator pipes were found to be in good condition, as per the standards set by ASME B31.1.

Fig. 4
figure 4

Thickness measurement orientation

Metallographic and scanning electron microscopy (SEM) tests were conducted to determine if there were any changes in the microstructure of the metal that could potentially cause issues. Additionally, energy-dispersive spectroscopy (EDS) was utilized to identify the elemental composition and any other phases present in the material. The SEM-EDS analysis involved four samples, including one test sample from the east side LP Evaporator pipe and another from the west-side pipe. Samples 1 and 2 correspond to the east- and west-side pipe samples, respectively.

Figure 5 displays the two specimens from the west-side of the LP evaporator pipe, with two measurements taken (Fig. 5a), and the specimen from the east side of the LP evaporator pipe, with three measurements taken (Fig. 5b). By examining the microstructure, it was possible to identify initial cracks, inclusions, creep, or other failure mechanisms. The metallographic examination was conducted through in situ metallography, which involved performing polishing and etching on the site and capturing images of the microstructure with a replica. To obtain images of the microstructure at bends and pipe sections close to the pipe connection to the header, an optical microscope with a magnification of up to 500× was used to photograph through the replica. Additionally, small specimens were taken from favorable areas of the tube and securely mounted to retain their edges for microstructure analysis. The images obtained through these methods were crucial for the examination.

Fig. 5
figure 5

Specimen test sample: (a) east side pipe and (b) west-side pipe

Tensile testing was performed to verify the strength of the LP Evaporator pipe material according to the design standards. If the obtained pipe strength differs from the design conditions, further investigation into the cause of the difference is necessary. Additionally, hardness testing was conducted on samples taken from the failed pipes using the Brinell hardness (HB) measurement. In both the tensile and hardness tests, three samples were utilized from both the east and west sides of the LP evaporator pipes.

A simplified method was used to determine the flexibility of the LP evaporator pipe and whether it was at risk of thermal failure. This method assumed that the ambient temperature had been reached during the LP evaporator installation process. During operation, the LP evaporator pipe is filled with high-temperature steam, causing it to expand. This expansion leads to an increase in the length of the pipe while the distance between supports remains constant. Consequently, the pipe will bend and place a bending load on both the pipe and its supports. If the bending moment is significant enough, the stress placed on the material will exceed its strength, resulting in the failure of the LP evaporator.

In general, the formula for steel pipes is represented by Eq 1 as follows [15]:

$$\frac{\left(D.Y\right)}{{\left(L-U\right)}^{2}}<0.03$$
(1)

where D denotes the pipe outer diameter (m), L denotes the total length of the LP evaporator pipe (m), and Y denotes the resultant of thermal growth to be absorbed (m), while U is the modulus constant of elasticity of material. The inequality suggests that the relative change in length due to thermal expansion should be less than 0.03, which might be a specified limit for a particular application to ensure that the expansion does not exceed a certain threshold.

The thermal diffusivity of the steel pipe is expressed in Eq 2 [15]:

$$\alpha =\left(11.56+0.0055 T\right)\times {10}^{6}$$
(2)

The subsequent procedure involves computing the resulting expansion of the pipe (yr) in both horizontal (yh) and vertical (yv) directions, as illustrated by Eqs (3)–(5) [15].

$$y_{{\text{v}}} = (\alpha _{1} T_{1} l_{{\text{v}}} ) - ~(\alpha _{2} T_{{\text{a}}} l_{{\text{v}}} )$$
(3)
$$y_{{\text{h}}} = (\alpha _{1} T_{1} l_{{\text{h}}} ) - ~(\alpha _{2} T_{{\text{a}}} l_{{\text{h}}} )$$
(4)
$${y}_{\mathrm{R}}=\sqrt{{y}_{\mathrm{v}}^{2}+{y}_{\mathrm{h}}^{2}}$$
(5)

where T1 denotes the inlet temperature, Ta denotes the ambient temperature of the pipe, and \({l}_{\mathrm{v}}\) and \({l}_{\mathrm{h}}\) denote the length of the pipe sections (m) in the vertical and horizontal directions, respectively. Table 1 presents the parameters of the LP evaporator pipes employed in the equations.

Table 1 The parameters of the LP evaporator pipes

Temperature monitoring of the HRSG during the operation was conducted using a thermography device that displays the surface temperature of the object being observed. By color-coding the image captured, accurate surface temperature distribution can be determined. To monitor the temperature of the HRSG, recordings are specifically taken on the LP evaporator on both the east and west sides, precisely at the header pipe connections leading to the steam drum.

Analysis and Discussion

Visual Inspection and NDT

The investigation found cracks and leaks in the bends and joints between the evaporator pipe and the evaporator header of the steam outlet side (see Fig. 3a). The LP evaporator pipe material is ST37.8 CL1, with a diameter of 44.5 mm and a thickness of 2.9 mm. The evaporator header material is ST35.8, with a diameter of 508 mm and a thickness of 25 mm. The LP evaporator system uses 80 pipes with three passes. The repeated weld repair of the header and pipe joints in the east, as depicted in Fig. 3b, indicated that these failures have occurred frequently. The welding is necessary due to the pipe connection to the header, which frequently leaks, and as a result, the weld can increase the brittleness and induce cracks in the header.

Non-destructive testing (NDT) was conducted to enhance the visual inspection and identify the reason behind the LP evaporator pipe’s failure. As shown in Fig. 6, NDT revealed a red area in the tube joint and the LP evaporator pipe’s outlet, suggesting a potential leak in that region. Additional findings presented in Fig. 7, indicated the same occurrence in the inlet side of the welded connection area between the header and pipes, with a red hue around the zone, indicating some sort of failure.

Fig. 6
figure 6

NDT of the LP evaporator outlet: (a) header and (b) pipes

Fig. 7
figure 7

NDT of the LP evaporator inlet: (a) header and (b) pipes

Ultrasonic Thickness Measurements

The ultrasonic thickness measurements focus on pipe bends since the outermost part of the bend is typically the thinnest and most critical. Thinning is often due to corrosion, as well as erosion caused by fluid colliding with the pipe wall. Thickness measurements were taken on the inlet and outlet sides of the LP evaporator pipe in both the west and east, with the results shown in Table 2. As seen in Table 2, the C3 section of the pipe had the smallest thickness at 2.15 mm compared to nominal design thickness of 2.9 mm. So there was 0.75 mm of wall thickness lost (approximately 26%) due to erosion. This measurement strongly suggested that erosion in the LP evaporator pipe is one of the major concern. As such, the minimum thickness on the LP evaporator pipes remains permissible according to ASME B31.1 for power piping [16].

Table 2 UT thickness measurement results

Metallographic Test

The base material’s microstructure is that of an LP evaporator pipe made of ST37.8 CL1, as shown in Fig. 8. The inspection results (Fig. 8b) align with an ASTM A178 [17] standard (Fig. 8a), as both indicate the presence of ferrite phase (indicated by a red arrow) and pearlite (indicated by a black arrow). No significant changes in the macro or microstructures were detected, and the grain shape appeared coarse.

Fig. 8
figure 8

Metallography result: (a) ASTM A178 and (b) inspection result with 500x

SEM-EDS

The results of the SEM are displayed in Figs. 9 and 10 for both the inner and outer cross-sections of the LP evaporator pipes. In addition, a description of the entire sample is provided below.

Fig. 9
figure 9

SEM images: Cross-section of the pipe’s outer surface (Sample 1)

Fig. 10
figure 10

SEM image of Sample 1: (a) cross-section of the pipe’s inner surface and (b) outer pipe surface

Sample 1 was a segment of the LP evaporator pipe’s eastern section, displaying general corrosion and pitting corrosion on the outer surface caused by sulfur (refer to area 3 in Fig. 9 section of the cross-section of the outer surface of the pipe). An oxide corrosion layer is also observed on the pipe’s outer surface. The sulfur content in the outer material originates from the flue gases generated during fuel combustion. The base metal’s grains reveal a composition of ferrite and pearlite with large grain sizes, a characteristic that allows the eastern pipe to endure high temperatures for maximum grain development. However, the presence of large grains implies a reduction in the pipe material’s strength. The tensile testing conducted in this area resulted in a range of 25 kg/mm2. The SEM outcomes did not identify grain boundary cracks, creep, precipitates, or inclusions in the material grains.

Sample 2 represents the west-side pipe and exhibited generally acceptable grain conditions, indicating a reasonably high strength. Its tensile strength, was measured to be around 35 kg/mm2. Upon examining the pipe’s outer and inner surfaces, there was evidence of pitting corrosion on the outer surface in area 4. In addition, there is a possibility of stress corrosion cracking (SCC) on both the outer surface (area 4) and inner surface (area 1). Cracks that propagated in the longitudinal direction were observed on the pipe’s inner surface. Furthermore, there was evidence of pitting corrosion and erosion in area 3 of the inner surface, which allowed for the occurrence of flow-accelerated corrosion (FAC).

EDS was to determine the chemical composition of the fracture surface. Table 3 shows that the EDS results for Sample 1 of the pipe’s outer surface contained 0.23 and 0.03% Cl for areas 4 and 5, respectively (Table 4). Table 5 indicates that Cl levels of 0.11% were also found in area 4 of Sample 2 of the outer surface, which could have caused the failure of the LP evaporator pipe. However, the Cl element was not present on the pipe’s inner surface in either samples 1 or 2 (Tables 4 and 6). Typically, the abundance of Cl elements in the pipe leads to corrosion and ultimately, leaks [18].

Table 3 EDS experiment result of Sample 1
Table 4 EDS experiment result of Sample 1
Table 5 EDS experiment result of Sample 2
Table 6 EDS experiment result of Sample 2

Tensile and Hardness Measurement

The tests conducted on the west-side pipe reveal a maximum tensile strength of approximately 35 kg/mm2. In contrast, the eastern section of the LP Evaporator pipe demonstrates a maximum tensile strength within the range of 22 kg/mm2. The material’s tensile strength for the LP Evaporator pipe design conditions is 37.8 kg/mm2. The variation in tensile strength between the design conditions and the current material installation is likely due to fatigue from the cyclic loads experienced during the HRSG system’s on-and-off operation. This results in the pipe stretching and shrinking several times, leading to a reduction in strength in the area near the bend. In addition, the eastern pipeline is exposed to higher temperatures as more flue gas flows through that side, leading to faster fatigue compared to the western pipeline. The pipe exposed to higher temperatures experiences more significant expansion, resulting in the eastern pipeline experiencing cyclic loads with larger amplitude, leading to more significant strength reduction compared to the west-side pipe.

Furthermore, the hardness test conducted on the failure zone of both the east and west sides of the LP evaporator pipes revealed an average value of around 131.3 HB and 133.5 HB, respectively. This indicates a change in hardness near the lip rupture (samples 1 and 2 in Fig. 5) compared to the area away from the lip rupture (Sample 3 in Fig. 5). Therefore, according to ASTM A178 [16] grade A for carbon-steel welded boiler tube material hardness, which has a value of 139, the significant drop in hardness around the lip rupture indicated that creep damage and material softening occurred during operation.

Thermal Analysis and Thermography

In the preceding section, various measurements were conducted to identify the reason behind the failure on the western side of the LP evaporator pipe. However, none of the measurements yielded significant results, suggesting that other factors, including thermal effects, may have contributed to the issue. Thus, this subsection will delve into the analysis of thermal failure and will utilize thermographic measurements to verify the findings of thermal fatigue calculations (Figs. 11 and 12).

Fig. 11
figure 11

SEM images of Sample 2: Cross-section of the pipe’s outer surface

Fig. 12
figure 12

SEM image of Sample 2: Cross-section of the pipe’s inner surface

Table 7 presents calculation results based on the equations presented in the preceding subsection to determine the flexibility of both sides of the LP evaporator due to excessive thermal stress. From the results, the flexibility criterion \(\left( {\frac{{\left( {D.Y} \right)}}{{\left( {L - U} \right)^{2} }} < 0.0{3}} \right)\) of the eastern LP evaporator pipe is slightly higher than that specified \(\left( {\frac{{\left( {D.Y} \right)}}{{\left( {L - U} \right)^{2} }} = 0.0{4}} \right)\), with a difference of 0.01, suggesting that the risk of thermal-induced failure was significant. To demonstrate this, we conducted thermographic measurements on the east and west sides of the LP evaporator pipe to determine the difference between the actual and design inlet temperatures. Figure 13 shows the results of these measurements. In the recorded image (Fig. 13a), the east side appears significantly warmer than the west-side. By translating the thermographic images into temperature values, we determined that the maximum temperature on the east side wall is about 280.3 °C (Region 3), while the maximum temperature on the west-side wall is about 90 °C (Region 2), as seen in Fig. 13b. This indicates that the outlet section is exposed to higher heat levels than the inlet section. The uneven gas flow pattern is responsible for this difference, which often leads to damage at the outlet. Region 3 on the east side of the outlet is the hottest area, with an average temperature of approximately 240 °C. This is because the weld in this region has a larger mass than the welds in other regions, such as Region 2 and Region 1, which have average temperatures of around 218.1 and 208.6 °C, respectively. Additionally, the average temperatures of the LP evaporator on the west and east sides showed a significant difference from the design temperature, as shown in Fig. 1. The largest difference was found on the west-side, with a 100 °C variance between the actual and design temperatures. This temperature difference caused non-uniform expansion of the evaporator pipes, resulting in the east side pipe being longer than the west-side pipe and causing thermal stress in the LP evaporator pipe system (Table 8).

Table 7 Flexibility criterion result
Fig. 13
figure 13

Thermography result of the LP evaporator: (a) west-side and (b) east side

Table 8 The result of thermography measurement

Conclusion

Based on the investigation into the failure of the LP evaporator pipes, several conclusions can be drawn as outlined below:

  • Damage to the LP Evaporator pipe often occurs, particularly at the connection of the header pipe, the pipe bend, and the pipe connection. On average, LP Evaporator pipes failed 1.1 times per year, resulting in an annual failure rate.

  • A partial replacement of the east side of the LP Evaporator header was necessary due to cracks in the header. The header required several welding processes during the repair.

  • The thickness measurements indicate that the LP Evaporator pipe bend on the east side is thinner than the western part of the pipe. This is likely due to the higher flow rate of flue gas on the east side, causing the eastern pipe to be exposed to higher temperatures. Materials subjected to high temperatures experience a decrease in strength and hardness, making them more susceptible to erosion from the flow.

  • The metallographic examination revealed that the microstructure of the west-side pipe of the LP Evaporator did not change significantly, but there was evidence of pitting corrosion in certain areas. It is typical for the microstructure on the east side to experience grain reduction or flattening. Typically, the change in microstructure occurs at the pipe’s bend.

  • Based on the results of the SEM and EDS analyses, it was observed that the western grains are refined, whereas the eastern parts are coarse. In terms of tensile strength, the western pipe had a strength of approximately 35 kg/mm2, while the eastern pipe had a strength of about 25 kg/mm2. While, both sides exhibited pitting corrosion, and only the eastern side showed signs of SCC.

  • The LP Evaporator is subject to failure mechanisms resulting from thermal expansion and pitting corrosion.

Recommendation

Therefore, there are some recommendations for further action:

  • Monitoring of flue gas flow in HRSG. It is advisable to install temperature gauges on the wall of the evaporator pipe at multiple locations to monitor flue gas flow in the HRSG. If the temperature readings are inconsistent, it indicates significant pipe fin deposition, resulting in blockage of gas flow in certain areas. In this case, operations must be immediately halted, and the pipe wall cleaned. The use of a thermocouple is a reliable and cost-effective alternative to a flue gas flow sensor.

  • Replace the header pipe support with a support system that enables freedom of movement for the header pipe end both transversely and parallel to the pipe axis.

  • Check the silencer before the HRSG for any damage that may be causing non-uniform gas flow. If repairs are needed, they should be promptly carried out.