Abstract
This paper presents a practical method for calculating a power user’s customer interruption costs (CIC) under specific conditions. This novel method has been developed, based on the CIC results predicted by Lawrence Berkeley National Laboratory (LBNL), so that the key factors, such as customer type, customer size, interruption occurrence time and interruption duration can be considered. As compared to the LBNL method, the method proposed here is easy to understand and easy to execute with an acceptable error. It lays a solid foundation for further investigation of distributed generators and demand response in assessing reliability value of smart distribution grid (SDG). The effectiveness of the proposed method is confirmed through the assessment of RBTS-Bus2.
Similar content being viewed by others
References
Yu Y X, Qin C. Explanation on the basic ideas of smart grid (in Chinese). Sci China Inf Sci, 2014, 44: 694–701
Pullins S W. The NETL modern grid initiative: What will the US modern grid cost? In: Power Engineering Society General Meeting. Tampa, FL: IEEE PES, 2007
Sullivan M J, Keane D. Outage Cost Estimation Guidebook. EPRI Report, 1995
Kariuki K K, Allan R N. Evaluation of reliability worth and value of lost load. IEE Proc Gener Transm Distrib, 1996, 143: 171–180.
GUO Y J. Power System Rreliability Analysis (in Chinese). 1st ed. Beijing: Tsinghua University Press, 2003. 244–255
Zhou J H. Power System Planning With Large-scale Wind Power Based on Value Evaluation (in Chinese). Tianjin: Tianjin University, 2011. 102–103
Yu Y X, Wang J R, Lv X Y. Security value based expansion planning of power system with integration of large-scale wind power (in Chinese). Sci China Tech Sci, 2012, 55: 1908–1922
EPRI. Cost-benefit analysis of power system reliability: Determination of interruption costs-Vol. I: Measurement methods and potential applications in reliability cost-benefit analysis. EPRI Report EL-6791, 1990
Goel L, Billinton R. Determination of reliability worth for distribution system planning. IEEE Trans Power Delivery, 1994, 9: 1577–1583
Billinton R, Ali S, Wacker G. Rural distribution system reliability worth evaluation using individual customer outage cost characteristics. Int J Elec Power, 2004, 26: 235–240
Wang P, Billinton R. Time sequential distribution system reliability worth analysis considering time varying load and cost models. IEEE Trans Power Delivery, 1999, 14: 1046–1051
Jonnavithula A, Billinton R. Features that influence composite power system reliability worth assessment. IEEE Trans Power Syst, 1997, 12: 1536–1541
Neudorf E G, Bhavaraju M P, Billinton R, et al. Cost-benefit analysis of power system reliability: Two utility case studies. IEEE Trans Power Syst, 1995, 10: 1667–1675
Sullivan M J. Estimated value of service reliability for electric utility customers in the united states. Ernest Orlando LBNL Report 2132E, 2009
Sullivan M J, Mercurio M G, Schellenberg J A, et al. How to estimate the value of service reliability improvements. In: Power and Energy Society General Meeting. Minneapolis, MN: IEEE PES, 2010
Yu Y X, Zeng Y, Liu H, et al. Challenges and R&D opportunities of smart distribution grid in China. Sci China Tech Sci, 2014, 57: 1588–1593
Mei S W, Chen L J. Recent advances on smart grid technology and renewable energy integration. Sci China Tech Sci, 2013, 56: 3040–3048
Yu Y X, Luan W P. Smart grid and its implementations (in Chinese). Proc CSEE, 2009, 29: 1–8
Yu Y X, Ma S Q. 1-Neighbour knapsack problem and prospective greedy algorithm of intentional islanding in active distribution network. Sci China Tech Sci, 2014, 57: 568–577
Billinton R, Oteng A J, Ghajar R. Comparison of two alternate methods to establish an interruption assessment rate. IEEE Trans Power Syst, 1987, 2: 751–757
Allan R N, Billinton R, Sjarief I, et al. A reliability test system for educational purposes-basic distribution system data and results. IEEE Trans Power Syst, 1991, 6: 813–820
Duan D L, Wu X Y, Deng H Z. Reliability evaluation of distribution systems based on time-varying failure rate and service restoration time model (in Chinese). Proc CSEE, 2011, 31: 57–64
Srinivas N, Nishioka T, Sanford K, et al. Non-destructive condition assessment of energized cable systems. In: Power Engineering Society General Meeting, Montreal. Que: IEEE PES, 2006
Reliability Test System Task Force. IEEE reliability test system. IEEE T Power Apparatus Syst, 1979, 1: 2047–2054
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Sun, B., Yu, Y. A calculation method for a power user’s CIC under specific conditions in smart distribution grid. Sci. China Technol. Sci. 58, 1162–1172 (2015). https://doi.org/10.1007/s11431-015-5839-7
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11431-015-5839-7