Skip to main content

Advertisement

Log in

Risk sharing for PPP project in construction waste recycling industry in China

  • Environmental Resilience in the Pandemic Year 2020
  • Published:
Environmental Science and Pollution Research Aims and scope Submit manuscript

Abstract

With the deepening urbanization, urban renewal, and reconstruction movement in China, a large amount of construction waste has been generated. In order to ease the financial pressure on the government to deal with construction waste, introducing the PPP model in the construction waste recycling industry has become popular. Based on the theory of system dynamics, this paper studies the risks of using the PPP model in construction waste recycling industry. First, a causal loop diagram was depicted according to the interaction of the main risk factors. Then, using the system dynamics software Vensim, a dynamic model of the risks of the PPP project was constructed. The results show the following: (1) the PPP project in the construction waste recycling industry is profitable; (2) For the PPP project in the construction waste recycling industry, the tendering risk will break out in 6~7 years, the greatest impact on tendering risk is the cooperation environment risk, where cooperation environment risk entropy is increased by 50% and tendering risk entropy is increased by 53.66%; (3) Construction risks will break out in 7~8 years. The construction cost, construction delay, and design defects have the greatest impact on construction risks, where entropy is increased by 50% and construction risk entropy is increased by 19.30%, 19.25%, and 19.08%, respectively; (4) The operational risk has not broken out in 10 years and is expected to break out in 10 to 20 years. Raw material power supply, production technology level, and operations management efficiency have the greatest impact on operational risk, where entropy is increased by 50% and operational risk entropy is increased by 21.52%, 20.84%, and 20.76%, respectively. These results can provide suggestions and references for the risk management of PPP projects in China’s construction waste recycling industry.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11

Similar content being viewed by others

Data availability

Not applicable.

References

Download references

Funding

The research was supported by the Guangdong Planning Office of Philosophy and Social Science (No. GD19CGL23), the Humanities and Social Sciences Projects of Ministry of Education (Nos. 20YJCZH097 and 18YJA630113), the Guangzhou Planning Office of Philosophy and Social Science (No. 2020GZGJ185). The author would like to acknowledge the valuable suggestions of the editor and three anonymous reviewers.

Author information

Authors and Affiliations

Authors

Contributions

Jingkuang Liu: contributed to the conception of the study and contributed significantly to analysis and manuscript preparation. Zhaowen Hua: performed the data analyses and wrote the manuscript. Yongshi Pang: contributed to the conception of the study. Xuetong Wang: contributed to the conception of the study and helped perform the analysis with constructive discussions.

Corresponding author

Correspondence to Xuetong Wang.

Ethics declarations

Research involving human participants and/or animals

Not applicable.

Ethical approval and consent to participate

Not applicable.

Consent to publish

The authors consent to publish.

Conflict of interest

The authors declare no competing interests.

Additional information

Responsible Editor: Philippe Garrigues

Publisher’s note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Liu, ., Hua, Z., Pang, Y. et al. Risk sharing for PPP project in construction waste recycling industry in China. Environ Sci Pollut Res 29, 12614–12628 (2022). https://doi.org/10.1007/s11356-021-15816-z

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11356-021-15816-z

Keywords

Navigation