Abstract
With the deepening urbanization, urban renewal, and reconstruction movement in China, a large amount of construction waste has been generated. In order to ease the financial pressure on the government to deal with construction waste, introducing the PPP model in the construction waste recycling industry has become popular. Based on the theory of system dynamics, this paper studies the risks of using the PPP model in construction waste recycling industry. First, a causal loop diagram was depicted according to the interaction of the main risk factors. Then, using the system dynamics software Vensim, a dynamic model of the risks of the PPP project was constructed. The results show the following: (1) the PPP project in the construction waste recycling industry is profitable; (2) For the PPP project in the construction waste recycling industry, the tendering risk will break out in 6~7 years, the greatest impact on tendering risk is the cooperation environment risk, where cooperation environment risk entropy is increased by 50% and tendering risk entropy is increased by 53.66%; (3) Construction risks will break out in 7~8 years. The construction cost, construction delay, and design defects have the greatest impact on construction risks, where entropy is increased by 50% and construction risk entropy is increased by 19.30%, 19.25%, and 19.08%, respectively; (4) The operational risk has not broken out in 10 years and is expected to break out in 10 to 20 years. Raw material power supply, production technology level, and operations management efficiency have the greatest impact on operational risk, where entropy is increased by 50% and operational risk entropy is increased by 21.52%, 20.84%, and 20.76%, respectively. These results can provide suggestions and references for the risk management of PPP projects in China’s construction waste recycling industry.
Similar content being viewed by others
Data availability
Not applicable.
References
Ameyaw EE, Chan AC (2015) Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach. Expert Syst Appl 42(12):5102–5116. https://doi.org/10.1016/j.eswa.2015.02.041
Ameyaw EE, Chan APC (2016) A fuzzy approach for the allocation of risks in public-private partnership water-infrastructure projects in developing countries. J Infrastruct Syst 22(3):04016016. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000297
Chan APC, Yeung JFY, Yu CCP, Wang SQ, Ke YJ (2011) Empirical study of risk assessment and allocation of public-private partnership project in China. J Manag Eng 27(3):136–148. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000049
Chang M, Memon MA, Imura H (2003) International experience of public-private partnerships for urban environmental infrastructure, and its application to China. Int Rev Environ Strateg 4(2):223–248
Charles YJC, Michael JG (2009) Application of real options in PPP infrastructure projects: Opportunities and challenges. In book: Policy, Finance & Management for Public-Private Partnerships pp 229–249. https://doi.org/10.1002/9781444301427.ch13
Cheung E, Chan APC (2011) Risk factors of public-private partnership projects in China: comparison between the water, power, and transportation sectors. J Urban Plan Dev 137(4):409–415. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000086
Cui CY, Liu Y, Hope A, Wang JP (2018) Review of studies on the public–private partnerships (PPP) for infrastructure projects. Int J Proj Manag 36(5):773–794. https://doi.org/10.1016/j.ijproman.2018.03.004
Darrin G, Mervyn KL (2002) Evaluating the risks of public private partnerships for infrastructure projects. Int J Proj Manag 20(2):107–118. https://doi.org/10.1016/S0263-7863(00)00040-5
Demirag I, Khadaroo I, Stapleton P, Stevenson C (2011) Risks and the financing of PPP: perspectives from the financiers. Br Account Rev 43:294–310. https://doi.org/10.1016/j.bar.2011.08.006
Estache A,Juan E,Trujillo L(2007) Public–private partnerships in transport. Policy Research Working Paper 4436. The World Bank, Washington, D.C.
Grimsey D, Lewis MK (2002) Evaluating the risks of public private partnerships for infrastructure projects. Int J Proj Manag 20(2):107–118. https://doi.org/10.1016/S0263-7863(00)00040-5
Guangzhou city bureau of statistics (GBS), 2017. Guangzhou Statistical Information Network. Retrieved from: http://www.gzstats.gov.cn/
Guangzhou City Planning Bureau(GPB), 2009. Preliminary study report of Guangzhou City Master Plan (2010-2020). Retrieved from: http://www.gzpi.com.cn/p_planning_133.html
Guo Y (2005) Artificial neural network model for project risk analysis. J Elec Power 20(3):307–309. https://doi.org/10.13357/j.cnki.jep.000883
Hoang NH, Ishigaki T, Kubota R, Tong TK, Nguyen TT, Nguyen HG, Yamada M, Kawamoto K (2021) Financial and economic evaluation of construction and demolition waste recycling in Hanoi, Vietnam. Waste Manag 131:294–304. https://doi.org/10.1016/j.wasman.2021.06.014
Hua ZW(2019)Risk Sharing for PPP project in construction waste recycling industry. Master thesis of Guangzhou University, Guangzhou, China
Iyer KC, Sagheer M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. J Constr Eng Manag 136(2):151–159. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000127
Jin XH, Zhang GM (2011) Modelling optimal risk allocation in PPP projects using artificial neural networks. Int J Proj Manag 29:591–603. https://doi.org/10.1016/j.ijproman.2010.07.011
Ke YJ, Wang SQ, Chan APC, Lam PTI (2010) Preferred risk allocation in China’s public-private partnership (PPP) projects. Int J Proj Manag 28(5):482–492. https://doi.org/10.1016/j.ijproman.2009.08.007
Klijn EH, Teisman GR (2003) Institutional and strategic barriers to public—private partnership: an analysis of Dutch cases. Public Money Manag 23(3):137–146. https://doi.org/10.1111/1467-9302.00361
Kumaraswamy MM, Zhang XQ (2001) Governmental role in BOT-led infrastructure development. Int J Proj Manag 19(4):195–205. https://doi.org/10.1016/S0263-7863(99)00069-1
Li B, Akintoye A, Edwards PJ, Hardcastle C (2005) The allocation of risk in PPP/PFI construction projects in UK. Int J Proj Manag 23(1):25–35. https://doi.org/10.1016/j.ijproman.2004.04.006
Li JR, Ding ZK, Mi XM, Wang JY, Zhu JL (2010) Investigation on the on-site construction waste reduction measures. J Eng Manag 24(3):332–335. https://doi.org/10.1177/0734242X07083344
Li JF, Zhang YL, He YB (2018) Risk evaluation of PPP project financing based on relative entropy. Math Practice Theory 5(48):164–170
Liu JK, Liu YD,Zhao SM, Li SM (2019) Estimation of construction wastes based on the bill of quantity in South China. Appl Ecol Environ Res 17(1):123–146. https://doi.org/10.15666/aeer/1701_123146
Liu JK, Wang YS, Zhang WJ, Zheng ZT (2014) Cost-benefit analysis of construction and demolition waste management based on system dynamics: a case study of Guangzhou. Syst Eng Theory Pract 34(6):1480–1490
Liu JK, Pang YS, Wang D, Zhou JW (2017a) An empirical investigation of construction and demolition waste management in China’s Pearl River Delta. In: Proceedings of the 21th International Symposium on Advancement of Construction Management and Real Estate. Springer, 197–212. https://doi.org/10.1007/978-981-10-6190-5_19
Liu HY, Yuan MT, Wu ZL, Duan YY (2017b) Researches on risk-sharing model of construction waste disposal project in PPP mode. Sci Technol Progress Policy 9(34):92–96. https://doi.org/10.6049/kjjbydc.2017gc0011
Liu J, Yi YQ, Wang XT (2020) Exploring factors influencing construction waste reduction: a structural equation modeling approach. J Clean Prod 276:123185. https://doi.org/10.1016/j.jclepro.2020.123185
Lohri CR, Camenzind EJ, Zurbrügg C (2014) Financial sustainability in municipal solid waste management – costs and revenues in Bahir Dar, Ethiopia. Waste Manag 34:542–552. https://doi.org/10.1016/j.wasman.2013.10.014
Loosemore M, Cheung E (2015) Implementing systems thinking to manage risk in public private partnership projects. Int J Proj Manag 33(6):1325–1334. https://doi.org/10.1016/j.ijproman.2015.02.005
Lu WS, Tam VWY (2013) Construction waste management policies and their effectiveness in Hong Kong: a longitudinal review. Renew Sust Energ Rev 23:214–223. https://doi.org/10.1016/j.rser.2013.03.007
Lu WS, Yuan HP (2010) Exploring critical success factors for waste management in construction projects of China. Resour Conserv Recycl l55(2):201–208. https://doi.org/10.1016/j.resconrec.2010.09.010
Lu WS, Yuan HP, Li JR, Hao JJL, Mi XM, Ding ZK(2011) An empirical investigation of construction and demolition waste generation rates in Shenzhen City, South China. Waste Manag 31(4):680–687. 10.1016/j.wasman.2010.12.004
Lu WS, Webster C, Peng Y, Chen X, Zhang XL (2017) Estimating and calibrating the amount of building-related construction and demolition waste in urban China. Int J Constr Manag 17:13–24. https://doi.org/10.1080/15623599.2016.1166548
Ng A, Loosemore M (2007) Risk allocation in the private provision of public in frastructure. Int J Proj Manag 25(1):66–76. https://doi.org/10.1016/j.ijproman.2006.06.005
Osei-Kyei R, Chan APC (2015) Review of studies on the critical success factors for public private partnership (PPP) projects from 1990 to 2013. Int J Proj Manag 33(6):1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008
Shrestha A, Chan TK, Aibinu AA, Chen C (2017) Efficient risk transfer in PPP wastewater treatment projects. Util Policy 48:132–140. https://doi.org/10.1016/j.jup.2017.03.003
Song JB, Song DR, Zhang XQ, Sun Y (2013) Risk identification for PPP waste-to-energy incineration projects in China. Energy Policy 61:953–962. https://doi.org/10.1016/j.enpol.2013.06.041
Sterman JD (2000) Business dynamics system thinking and modeling for a complex world. McGraw-Hill, M. London
Wang SQ, Tiong RLK, Ting SK, Ashley D (2000a) Evaluation and management of political risks in China’s BOT projects. J Constr Eng Manag 126(3):242–250. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(242)
Wang SQ, Tiong RLK, Ting SK, Ashley D (2000b) Evaluation and management of foreign exchange and revenue risks in China’ BOT projects. Constr Manag Econ 18:197–207. https://doi.org/10.1080/014461900370825
Wang ZS,Xie WC,Liu JK (2021) Regional differences and driving factors of construction and demolition waste generation in China, Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-10-2020-0887, ahead-of-print
Wu ZZ, Yu ATW, Shen LY (2017) Investigating the determinants of contractor’s construction and demolition waste management behavior in Mainland China. Waste Manag 60:290–300. https://doi.org/10.1016/j.wasman.2016.09.001
Wu YN, Xu CB, Li LWY, Wang Y, Chen KF, Xu RH (2018) A risk assessment framework of PPP waste-to-energy incineration projects in China under 2-dimension linguistic environment. J Clean Prod 183:602–617. https://doi.org/10.1016/j.jclepro.2018.02.077
Wu ZZ, Yu ATW, Poon CS (2019a) An off-site snapshot methodology for estimating building construction waste composition - a case study of Hong Kong. Environ Impact Assess Rev 77:128–135. https://doi.org/10.1016/j.eiar.2019.03.006
Wu ZZ, Yu ATW, Wang H, Wei YG, Huo XS (2019b) Driving factors for construction waste minimization: empirical studies in Hong Kong and Shenzhen. J Green Build 14(4):155–167. https://doi.org/10.3992/1943-4618.14.4.155
Wu ZZ, Yu ATW, Poon CS (2020) Promoting effective construction and demolition waste management towards sustainable development: a case study of Hong Kong. Sustain Dev 28(6):1713–1724. https://doi.org/10.1002/sd.2119
Wu ZZ, Zhang Y, Chen QH, Wang H (2021) Attitude of Chinese public towards municipal solid waste sorting policy: a text mining study. Sci Total Environ 756:142674. https://doi.org/10.1016/j.scitotenv.2020.142674
Xiang PC, Song XP (2016) Urban infrastructure financing risk evaluation under PPP mode. J Eng Manag 30(1):60–65. https://doi.org/10.13991/j.cnki.jem.2016.01.011
Xu, C., 2015. Research on urban construction rubbish problem based on system dynamics. Master thesis of Beijing Forestry University, Beijing, China
Xu YL, Yeung JFY, Chan APC, Chan DWM, Wang SQ, Ke YJ (2010) Developing a risk assessment model for PPP projects in China — a fuzzy synthetic evaluation approach. Autom Constr 7(19):929–943. https://doi.org/10.1016/j.autcon.2010.06.006
Xu YL, Chan APC, Xia B, Qian QK, Liu Y, Peng Y (2015) Critical risk factors affecting the implementation of PPP waste-to-energy projects in China. Appl Energy 158:403–411. https://doi.org/10.1016/j.apenergy.2015.08.043
Yuan HP, Chini AR, Lu YJ, Shen LY (2012) A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste. Waste Manag 32(3):520–530. https://doi.org/10.1016/j.wasman.2011.11.006
Zhao W, Leeftink RB, Rotter VS (2010) Evaluation of economic feasibility for the recycling of construction and demolition waste in China – the case of Chongqing. Resour Conserv Recycl 54(6):377–389. https://doi.org/10.1016/j.resconrec.2009.09.003
Funding
The research was supported by the Guangdong Planning Office of Philosophy and Social Science (No. GD19CGL23), the Humanities and Social Sciences Projects of Ministry of Education (Nos. 20YJCZH097 and 18YJA630113), the Guangzhou Planning Office of Philosophy and Social Science (No. 2020GZGJ185). The author would like to acknowledge the valuable suggestions of the editor and three anonymous reviewers.
Author information
Authors and Affiliations
Contributions
Jingkuang Liu: contributed to the conception of the study and contributed significantly to analysis and manuscript preparation. Zhaowen Hua: performed the data analyses and wrote the manuscript. Yongshi Pang: contributed to the conception of the study. Xuetong Wang: contributed to the conception of the study and helped perform the analysis with constructive discussions.
Corresponding author
Ethics declarations
Research involving human participants and/or animals
Not applicable.
Ethical approval and consent to participate
Not applicable.
Consent to publish
The authors consent to publish.
Conflict of interest
The authors declare no competing interests.
Additional information
Responsible Editor: Philippe Garrigues
Publisher’s note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Liu, ., Hua, Z., Pang, Y. et al. Risk sharing for PPP project in construction waste recycling industry in China. Environ Sci Pollut Res 29, 12614–12628 (2022). https://doi.org/10.1007/s11356-021-15816-z
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11356-021-15816-z