Abstract
Previous studies regarding construction project risk management mainly hypothesized that risk factors are independent and they do not interact with each other. The applicability of those studies, however, is limited because they cannot effectively reflect the risks happening in real construction projects. Based on the principles of system dynamics approach, this paper thus proposes to analyze the interrelations between major risks influencing construction project cost. To this end, this paper establishes a risk assessment model to analyze the interactions between risk factors involved. The model developed is validated and simulated based on data collected from the Xinzheng airport rehabilitation and expansion project. The findings demonstrate that the existence of interactions between risk factors can significantly influence the entire project cost. That the results of sensitivity analysis tell that the most sensitive factors in affecting project cost include “contractors’ poor management capacity”, “engineering change”, and “rise in material and equipment price”. This study contributes to the body of knowledge of construction project risk management by furthering the understanding of risks affecting project cost.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Nasirzadeh F, Afshar A, Khanzadi M (2008) Dynamic risk analysis in construction projects [J]. Can J Civ Eng 35(8):820–831
Eybpoosh M, Dikmen I, Talat Birgonul M (2011) Identification of risk paths in international construction projects using structural equation modeling [J]. J Constr Eng Manag 137(12):1164–1175
APM (Association for Project Management) (2004) Project risk analysis and management guide. APM Publishing limited, High Wycombe
International Organization of Standard (ISO) (2009) ISO 31000: risk management principles and guidelines. AS/NZS ISO 31000
Yuan JF, Deng XP, Li QM (2008) The relationship of critical risk factors in Chinese PPP projects: modeling perspective. In: International conference on information management, innovation management and industrial engineering [C], Nanjing, pp 151–154
Wang SQ, Dulaimi MF, Aguria MG (2009) Quantifying schedule risk in construction projects using Bayesian belief networks [J]. Int J Proj Manage 27(1):39–50
Luu VT, Kim SY, Tuan NV, Ogunlana SQ (2009) Quantifying schedule risk in construction projects using Bayesian belief networks [J]. Int J Proj Manage 27:39–50
Wang JY, Zou XW, Zhang GM (2010) Risk identification during the whole project life circle [J]. Sci Technol Prog Policy 27(19):56–59
Wang ZH (2012) Research on engineering change along the railroad [J]. Transp World 1:194–195
Ming ZX (1996) Analysis about construction funds and project quality control [J]. Build Tech Dev 2:41–42
Liu J, Wang JY (2006) Forecast delay risk factors based on Bayesian method [J]. Techno Econ Manage Res 5:56–57
Acknowledgments
This study was supported by the NSFC (71272088).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Li, P., Wang, J., Yuan, H. (2014). Analysis of the Interactions Between Risks Affecting Construction Project Cost. In: Yang, D., Qian, Y. (eds) Proceedings of the 18th International Symposium on Advancement of Construction Management and Real Estate. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-44916-1_42
Download citation
DOI: https://doi.org/10.1007/978-3-642-44916-1_42
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-44915-4
Online ISBN: 978-3-642-44916-1
eBook Packages: Business and EconomicsBusiness and Management (R0)