Problems of interaction between a single long pile (more than 20 m) or a group of long piles as component parts of a pile foundation and soil are discussed on the basis of a new geomechanical model. The settlement of a pile or group of piles is caused primarily by shear deformations of a soil mass of limited area and depth, and also as a result of deformations of the mass beneath the lower ends of the piles.
Similar content being viewed by others
References
A. A. Bartolomei, I. M. Omel’chak, and B. S. Yushkov, Prediction of Pile-Foundation Settlement [in Russian], Stroiizdat, Moscow (1994).
Nguen Zang Nam, Determination of the settlement of a circular plate with consideration of its embedment depth, Collection of Papers Presented at the Fourth International Scientific-Practical Conference of Young Scientists, Aspirants, and Doctoral Candidates [in Russian], Moscow (2006).
Building Code 50-102-2003. Design and Installation of Pile Foundations [in Russian].
Z. G. Ter-Martirosyan, Soil Mechanics [in Russian], Moscow (2005).
S. B. Ukhov, V. V. Semenov, V. V. Znamenskii, Z. G. Ter-Martirosyan, and S. N. Chernyshev, Mechanics of Soils, Beds, and Foundations [in Russian], Izdatel’stvo ASV, Moscow (2004).
Author information
Authors and Affiliations
Additional information
__________
Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 2, pp. 2–7, March–April, 2007.
Rights and permissions
About this article
Cite this article
Ter-Martirosyan, Z.G., Nam, D.K. & Nam, N.Z. Interaction between pile foundation and soil. Soil Mech Found Eng 44, 39–47 (2007). https://doi.org/10.1007/s11204-007-0007-0
Issue Date:
DOI: https://doi.org/10.1007/s11204-007-0007-0