Abstract
Draglines are among the largest earthmoving machines in surface mining, where they are used to remove the waste material (overburden) sitting above a target mineral or coal deposit. The effectiveness of their operation is highly dependent on decisions made by their operators, including the sequence of positions at which they operate and the bulk material movement (what to dig and where to dump) during excavation at each position. In this paper, we formulate a mixed-integer linear program that captures the operational constraints imposed in dragline excavation to determine the optimal material movement for a prescribed sequence of dragline positions. Through a simulation study, we show that the dragline productivity can be improved by more effective assignment of material movement tasks to individual dragline positions. We find that the improvement made compared to using a ‘greedy’digging and dumping strategy depends on the dragline positioning sequence and the terrain profile in the specific environment. The solutions in terms of what to dig and where to dump provide insights into the optimal digging and dumping patterns for different types of dragline positioning sequences, and contribute towards solving the overall dragline operation planning problem that includes the planning of the dragline positioning sequence.
Similar content being viewed by others
References
Beasley P (2013) Mission planning for mining excavators. Ph.D. thesis, The University of Queensland
Corke PI, Winstanley GJ, Roberts JM (1997) Dragline modelling and control. In: Robotics and automation, 1997. Proceedings., 1997 IEEE international conference on robotics and automation, IEEE, vol 2, pp 1657–1662
Corke P, Winstanley G, Dunbabin M, Roberts J (2006) Dragline automation: experimental evaluation through productivity trial. In: Thrun S (ed) Field and service robotics. Springer, pp 459–468
Curragh Queensland Mining Limited (2012) Curragh dragline. https://en.wikipedia.org/wiki/File:Curragh_Dragline_3.JPG. Accessed 13 Apr 2015
Dyer G, Hill K (2011) Strip mining. In: Darling P (ed) SME mining engineering handbook, vol 1, SME, chap 10.8, pp 989–1012
Erdem B, Dogan T (2009) Spoil room utilization in dragline stripping. J Sci Ind Res 68(3):217
Erdem B, Dzgn HeB (2005) Dragline cycle time analysis. J Sci Ind Res 64(1):545
Goodwin GC, Seron MM, Middleton RH, Zhang M, Hennessy BF, Stone PM, Menabde M (2006) Receding horizon control applied to optimal mine planning. Automatica 42(8):1337–1342
Gurobi Optimization I (2015) Gurobi optimizer reference manual. URLhttp://www.gurobi.com
Humphrey J, Wagner J (2011) Mechanical excavation, loading, and hauling. In: Darling P (ed) SME mining engineering handbook, vol 1, SME, chap 10.3, pp 903–929
Knights P, Jessett A, Liang X (2013) Enhanced reporting of advanced dragline analytics. Technical report CRC mining
Lawler EL, Wood DE (1966) Branch-and-bound methods: a survey. Operat Res 14(4):699–719
Li Z, Zhu Q, Gold C (2005) Digital terrain modeling principles and methodology, chap 4. CRC Press Inc, New York, pp 65–83
Mehta A, Barker G (1994) The dynamics of sand. Rep Prog Phys 57(4):383
Mignone D (2001) The really big collection of logic propositions and linear inequalities. Relatório Técnico AUT01 11
Mirabediny H (1998) A dragline simulation model for strip mine design and development. Ph.D. thesis, Department of Civil and Mining Engineering-Faculty of Engineering, University of Wollongong
Nelson MG (2011) Site environmental considerations. In: Darling P (ed) SME mining engineering handbook, vol 1, SME, chap 16.1, pp 1643–1664
Rai P, Trivedi R, Nath R (2000) Cycle time and idle time analysis of draglines for increased productivity—a case study. Indian J Eng Mater Sci 7(2):77–81
Seo J, Lee S, Kim J, Kim SK (2011) Task planner design for an automated excavation system. Autom Constr 20(7):954–966
Sier D (1993) Optimised dragline planning model. Technical report
Singh S (1995) Synthesis of tactical plans for robotic excavation. Ph.D. thesis, Carnegie Mellon University
Singh S, Simmons RG (1992) Task planning for robotic excavation. IROS 92:1284–1291
Thornton D, Whiten B (2003) Optimization of dragline excavation. Technical report, Julius Kruttschnitt Mineral Research Centre
Winstanley G, Usher K, Corke P, Dunbabin M, Roberts J (2007) Field and service applications-dragline automation-a dedade of development-shared autonomy for improving mining equipment productivity. Robot Autom Mag IEEE 14(3):52–64
Acknowledgements
This work is supported by an Australian Government Research Training Program Scholarship. The authors would like to thank Dr. Michael Forbes for his helpful comments.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Liu, H., Kearney, M.P. & Austin, K.J. Dragline operation modelling and task assignment based on mixed-integer linear programming. Optim Eng 19, 1005–1036 (2018). https://doi.org/10.1007/s11081-018-9386-5
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11081-018-9386-5