Unforeseen Situations During the Commissioning of HPP Equipment

  • Published:
Power Technology and Engineering Aims and scope

The article presents information on technical situations during the commissioning of the technological equipment for a hydropower plant (HPP).

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. G. Mikhailov.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’svo, No. 9, September 2022, pp. 25 – 32. DOI: https://doi.org/10.34831/EP.2022.25.84.004

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Mikhailov, M.G. Unforeseen Situations During the Commissioning of HPP Equipment. Power Technol Eng 56, 815–822 (2023). https://doi.org/10.1007/s10749-023-01592-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-023-01592-y

Keywords

Navigation