Skip to main content

Advertisement

Log in

Experience with Operation of the Hydroelectric Power Equipment at the Votkinsk HPP

  • Published:
Power Technology and Engineering Aims and scope

This article deals with the experience of operating the Votkinsk HPP, one of the largest hydroelectric power plants in the Volga-Kama cascade. The engineering decisions and ideas used to solve the problems confronted by hydroelectric power engineers are examined.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. A. Nikonov.

Additional information

A. I. Chekunov is deceased.

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 11, November 2016, pp. 44 – 47.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Chekunov, A.I., Nikonov, A.A. Experience with Operation of the Hydroelectric Power Equipment at the Votkinsk HPP. Power Technol Eng 51, 29–32 (2017). https://doi.org/10.1007/s10749-017-0778-z

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-017-0778-z

Keywords

Navigation