Experimental Substantiation of Leveling the Zagorsk PSP-2 Powerhouse

  • Published:
Power Technology and Engineering Aims and scope

This paper gives basic information on conducting experimental works to substantiate the design solutions for leveling the Zagorsk PSP-2 powerhouse. The compensation grouting technology for leveling the Zagorsk PSP-2 powerhouse is substantiated.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. SP 58.13330.2012. Hydraulic structure. Basic Provisions. Actualized edition SNiP 33-01–2003 [in Russian].

  2. EN 12715. Execution of special geotechnical work—Grouting.

  3. API RP 13. American Petroleum Institute—Standard procedure for field testing drilling fluids. Recommended Practice.

  4. A. Bezuijen, Compensation grouting in sand. Experiments. Field experiences and Mechanisms (2010).

  5. I. Ya. Kharchenko, V. E. Merkin, A. N. Simutin, and M. G. Zertsalov, “Use of compensating grouting technology for protecting buildings and structures during tunnel construction,” Transp. Stroit., No. 8, 7 – 16 (2018).

  6. M. G. Bellende, A. N. Simutin, and A. V. Aleksandrov, “Compensation grouting technology for protecting buildings and structures,” Vest. MGSU, No. 6, 32 – 40 (2015).

  7. E. N. Bellendir, A. V. Aleksandrov, M. G. Zertsalov, and A. N. Simutin, “Protection and leveling buildings by means of compensation grouting technology,” Gidrotekh. Stroit., No. 2, 15 – 20, (2016).

  8. A. V. Aleksandrov, E. N. Bellendir, S. Ya. Lashchenov, and R. Sh. Al’zhanov, “Elimination of the aftereffects of settlement of the powerhouse complex of the Zagorsk PSP-2 and restoration works,” Gidrotekh. Stroit., No. 6, 81 – 89 (2016).

  9. L. V. Makovskii and V. V. Kravchenko, “Determination of the parameters of compensation grouting during tunneling under complex urban development conditions,” in: Road Planning: Collection of Scientific Works [in Russian], MADI (GTU), Moscow (2009), pp. 119 – 124.

  10. J. Warner and M. Hyle, Limited Mobility Grouting — Past, Present and Future (2012).

  11. Cliff Kettle, Compensation Grouting — Evolution, Field and Application and Current State of the Art in UK practice.

  12. H. Knitsch, “Visualization of relevant data for compensation grouting,” Tunnel, No. 3, 38 – 45 (2008).

  13. H. F. Schweiger, “Reduction of settlements by compensation grouting — Numerical studies and experience from Lisbon underground,” in: H. F. Schweiger and E. Falk, Tunnels and Metropolises, Balkema, Rotterdam (1998), pp. 1047 – 1052.

  14. T. Telford, Sprayed concrete linings (NATM) for tunnels in soft ground, London (2004), pp. 10 – 12.

  15. J. B. Burland, “Building response to tunneling,” in: Case studies from construction of the Jubilee line extension, J. B. Burland, J. R. Standing, and F. M. Jardine, London (2001), pp. 134 – 145.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. V. Aleksandrov.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 8, August 2018, pp. 7 – 16

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Aleksandrov, A.V., Bellendir, E.N., Vaver, P.A. et al. Experimental Substantiation of Leveling the Zagorsk PSP-2 Powerhouse. Power Technol Eng 52, 517–524 (2019). https://doi.org/10.1007/s10749-019-00984-3

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-019-00984-3

Keywords

Navigation