Skip to main content
Log in

Special Operations to Stabilize the Powerhouse of the Zagorsk PSPP-2

  • HYDROTECHNICAL CONSTRUCTION
  • Published:
Power Technology and Engineering Aims and scope

A work package for filling the voids under the pumped-storage powerhouse and pressure grouting to strengthen the foundation soil is described. The compositions of the injectable grouts and specially designed composite material are presented. The results are analyzed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Reference

  1. A. V. Aleksandrov, E. N. Bellendir, S. Ya. Lashchenov, and R. Sh. Al’zhanov, “Remediation of the consequences of the subsidence of the Zagorsk PSPP-2 powerhouse,” Gidrotekhn. Stroit., No. 7, 2 – 10 (2016).

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to V. M. Korolev.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’svo, No. 3, March 2018, pp. 2 – 10.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Korolev, V.M., Smirnov, O.E., Argal, É.S. et al. Special Operations to Stabilize the Powerhouse of the Zagorsk PSPP-2. Power Technol Eng 52, 249–255 (2018). https://doi.org/10.1007/s10749-018-0940-2

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-018-0940-2

Keywords

Navigation