A work package for filling the voids under the pumped-storage powerhouse and pressure grouting to strengthen the foundation soil is described. The compositions of the injectable grouts and specially designed composite material are presented. The results are analyzed.
Similar content being viewed by others
Reference
A. V. Aleksandrov, E. N. Bellendir, S. Ya. Lashchenov, and R. Sh. Al’zhanov, “Remediation of the consequences of the subsidence of the Zagorsk PSPP-2 powerhouse,” Gidrotekhn. Stroit., No. 7, 2 – 10 (2016).
Author information
Authors and Affiliations
Corresponding author
Additional information
Translated from Gidrotekhnicheskoe Stroitel’svo, No. 3, March 2018, pp. 2 – 10.
Rights and permissions
About this article
Cite this article
Korolev, V.M., Smirnov, O.E., Argal, É.S. et al. Special Operations to Stabilize the Powerhouse of the Zagorsk PSPP-2. Power Technol Eng 52, 249–255 (2018). https://doi.org/10.1007/s10749-018-0940-2