Skip to main content
Log in

From Foot to Shoes: Kindergartners’, Families’ and Teachers’ Perceptions of the Project Approach

  • Published:
Early Childhood Education Journal Aims and scope Submit manuscript

Abstract

Working within the context of a school improvement project, a kindergarten moved from its use of a theme approach in the classroom to a project-based learning approach in which the children were asked to seek relevant information and materials based on their daily interests and exploration. The children were encouraged to integrate drawing and writing daily newsletters to communicate to their parents what they need and how their parents could help them. This paper is presented in two parts. The first part is a description of how a project on shoes undertaken by a kindergarten class might unfold. The second part discusses the parents’ and teachers’ reflections on the project.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bereiter, C., & Scardamalia, M. (1993). Surpassing ourselves: An inquiry into the nature and implications of expertise. Chicago: Open Court.

    Google Scholar 

  • Blumenfeld, P., Soloway, E., Marx, R., & Krajcik, J. (1991). Motivating project-based learning: Sustaining the doing, supporting the learning. Educational Psychologist, 26(3&4), 369–398.

    Article  Google Scholar 

  • Buck Institute for Education. (2002). Project based learning handbook. Novato: Author. July 30, 2007, from http://www.bie.org/pbl/pblhandbook/intro.php.

  • Harada, V. H., Kirio, A. H., et al. (2008). Collaborating for project-based learning in grade 9–12. Linworth: USA.

    Google Scholar 

  • Katz, L. G. (1995). Talks with teachers of young children: A collection. Stamford, CT: Ablex.

    Google Scholar 

  • Katz, L. G., & Chard, S. C. (2000). Engaging children’s minds: The project approach. Stamford, CT: Ablex.

    Google Scholar 

  • Moursund, D. (1999). Project-based learning using information technology. Eugene, OR: International Society for Technology in Education.

    Google Scholar 

  • Pappas, M. L., & Tepe, A. E. (2002). Pathways to knowledge and inquiry learning. Englewood: Libraries Unlimited.

    Google Scholar 

  • Railsback, J. (2002). Project-based instruction: Creating excitement for learning. Portland, OR: Northwest Regional Educational Laboratory.

    Google Scholar 

  • Stites, R. (1998). Evaluation of project-based learning: What does research say about outcomes from project-based learning? Project-based learning with multimedia. San Mateo: San Mateo County Office of Education. July 30, 2007, from http://pblmm.k12.ca.us/PBLGuide/pblresch.htm.

  • Tomlinson, C. A., & McTighe, J. (2006). Integrating differentiated instruction and understanding by design: Connecting content and kids. Alexandria, VA: Association for Supervision and Curriculum Development.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Lai Ha Freda Yuen.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yuen, L.H.F. From Foot to Shoes: Kindergartners’, Families’ and Teachers’ Perceptions of the Project Approach. Early Childhood Educ J 37, 23–33 (2009). https://doi.org/10.1007/s10643-009-0322-3

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10643-009-0322-3

Keywords

Navigation