The article considers the specifics of innovative nuclear power facilities from the perspective of cost estimation. Approaches to cost estimation, which aim to ensure the greatest reliability and provide for composing detailed calculations and using analogs, were identified taking into account the initial data available at the pre-design stage. An attention is focused on the importance of competitiveness analysis that takes into account the life cycle of the facility. The scientific novelty of the study lies in the presented approaches for assessing the cost of constructing innovative facilities in conjunction with the various stages of pre-design works, including conceptual design and feasibility study, which are implemented in the practical activities of the Proryv project stream.
Similar content being viewed by others
References
N. I. Voropai and V. A. Stennikov, Hierarchical Modeling of Energy Systems, Izd. Geo, Novosibirsk (2016).
INPRO Methodology for Sustainability Assessment of Nuclear Energy Systems: Economics, IAEA, Vienna (2014).
G. Maronati, B. Petrovic, J. Wyk, et al., “EVAL: a methodological approach to identify NPP total capital investment cost drivers and sensitivities,” Progr. Nucl. Energy, 104, 190–202 (2018).
Basis for the Safety Approach for Design & Assessment of Generation in Nuclear Systems, Gen IV Int. Forum (2021).
V. Teterin, “Cost estimation in the early stages of a large project. An example of Gazprom Neft’,” Vest. PMSOFT, No. 13, 13–16 (2017).
Russian Federation Government Resolution No. 87, On the Composition of Design Documentation Sections and Requirements to Their Content, Feb. 16, 2008 (amend. July 15, 2021).
G. Maronati, B. Petrovic, and P. Ferroni, “Assesing I2S-LWR economic competitiveness using systematic differential capital cost evaluation methodology,” Ann. Nucl. Energy, 145, 106202 (2020).
Methodology for Determining the Costs of Constructing Temporary Buildings and Structures, Included in the Consolidated Cost Estimate for the Construction of Capital Construction Facilities, appr. by the Order of the Ministry of Construction of Russia, No. 332/pr, June 19, 2020.
Methodology for Determining Costs of Winter Works, appr. by the Order of the Ministry of Construction of Russia, No. 332/pr, June 19, 2020.
Regulations on the Construction Control during the Construction, Reconstruction, and Overhaul of Capital Construction Facilities, appr. by the Decree of the Government of the Russian Federation, No. 468, Jne 21, 2010.
Methodology for Determining the Estimated Cost of Construction, Reconstruction, Overhaul, Demolition of Capital Construction Facilities, Works for Preserving Cultural Heritage (history and culture) of the Peoples of the Russian Federation, appr. by the order of the Ministry of Construction of Russia, No. 421/pr, Aug. 4, 2020.
Cost Estimating Guidelines for Generation IV Nuclear Energy Systems, The Economic Modeling Working Group of the Generation IV International Forum (2007).
Author information
Authors and Affiliations
Corresponding author
Additional information
Translated from Atomnaya Énergiya, Vol. 133, No. 5–6, pp. 316–323, November–December, 2022.
Rights and permissions
Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
About this article
Cite this article
Atnyukova, P.V., Presnyakov, I.V. & Tolstoukhov, D.A. Approaches to the Assessment of the Cost for the Construction of Innovative Nuclear Power Facilities at the Early Stages of Design. At Energy 133, 339–345 (2023). https://doi.org/10.1007/s10512-023-01018-y
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10512-023-01018-y