Physical and numerical modeling of the hypothetical tailings dam breach runout and mitigation with a slurry-resisting barrier

  • Original Paper
  • Published:
Bulletin of Engineering Geology and the Environment Aims and scope Submit manuscript

Abstract

The potential breach of the tailings dams has caused the loss of many lives, considerable property damage, and irreversible pollution in downstream areas. Therefore, understanding the after-breach processes is a crucial step when performing a hazard analysis and response planning. In this investigation, the Yangtianqing tailings pond with possible fatality as a result of this dam failure might be classified as extreme failure consequence classification and was selected as a case study. Model tests and the corresponding numerical simulations were conducted to investigate the potential consequence of the runout of the tailings with respect to the hypothetical tailings dam breach. The results demonstrate the high risks of this typical “overhead tailings pond.” Downstream communities and other important facilities can be submerged in an extremely short period of time, thus, leaving very limited time to evacuate the residents and conduct a further emergency response. The potentially destructive power of the tailings slurry was emphasized by the high flow depth, impact force, and velocity of the tailings slurry that was 800 m downstream where the communities were located. A slurry-resisting barrier dam is proposed as a form of mitigation to protect the communities. The barrier dam can effectively reduce the mobility of the runout slurry. The results can serve as evidence for disaster mitigation and emergency management plan optimization.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17
Fig. 18
Fig. 19
Fig. 20
Fig. 21
Fig. 22
Fig. 23
Fig. 24
Fig. 25
Fig. 26
Fig. 27
Fig. 28
Fig. 29
Fig. 30
Fig. 31
Fig. 32
Fig. 33
Fig. 34

Similar content being viewed by others

Data availability

The datasets used and analyzed during the current study are available from the corresponding author on reasonable request.

References

Download references

Acknowledgements

This work is supported by the National Natural Science Foundation of China (52009131, 51974051).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yulong Chen.

Ethics declarations

Competing interests

The authors declare no competing interests.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Chen, Y., Jing, X., Wei, Z. et al. Physical and numerical modeling of the hypothetical tailings dam breach runout and mitigation with a slurry-resisting barrier. Bull Eng Geol Environ 82, 265 (2023). https://doi.org/10.1007/s10064-023-03312-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s10064-023-03312-2

Keywords

Navigation