Introduction

During a mass casualty incident (MCI) the medical need exceeds the response capabilities in the affected area [25]. To treat the overwhelming number of casualties this calls for a different approach from “do the most for one” to “do the best for most” [5].

Field triage is the most important parameter to classify patients who need immediate help and to establish to which hospital patients should be transported. The principles of triage have been described previously [4, 68]. In short, four triage classes are discerned: the T1 patients are those in mortal danger, T2 patients are severely injured but can wait for a limited time, whereas T3 patients are those least injured and T4 patients are those with a low probability of survival and those who have died. After triage and primary treatment, patients are transported to hospitals with different levels of trauma care based upon triage classification and nature of injuries. In the Netherlands, the joint emergency dispatch center and the medical assistance during accidents and disasters (GHOR) have predetermined the maximum (surge) capacity per hospital during a MCI.

This report analyzes the characteristics of a MCI that occurred after a fire spread rapidly through a nursing home on the morning of June 27th 2011. Due to the unusual spread of the fire the evacuation took longer than expected, which resulted in prolonged exposure to smoke and soot by the entrapped victims. The majority of patients were primarily treated in the Major Incident Hospital (MIH) in Utrecht which is part of the University Medical Centre of Utrecht (UMCU) in the Netherlands. The role and the goals of the MIH in the Netherlands have been described previously [9, 10]. In short, the MIH is a reserved hospital that can become operational within 30 min after activation. It is part of the hospital, the regional and if needed the national disaster plan in the Netherlands and is a collaboration of the Central Military Hospital and the University Medical Centre of Utrecht. The MIH has 200 available beds, of which 12 intensive care unit (ICU) beds, a medium care ward with 25 beds and a large low care ward. The MIH has its own radiology department, three fully equipped operating rooms and sixteen mechanical ventilators.

After arrival in the MIH, patients always follow a predefined route. An experienced surgeon performs a quick re-triage when patients are unloaded from the ambulances in the ambulance bay. Patients are then registered by the previous described Patient Barcode Registration System [11, 12] which allows patient tracking trough the MIH. From there, T1 and T2 patients will be transported to two corresponding triage bays (T1 and T2 bay) which are staffed by physicians and nurses from the surgery, emergency medicine and anesthesiology department. After 15 min of primary survey, the patients will be transported to the operation room, the CAT scan or directly to the ICU, medium care, low care, where secondary survey and further treatment are performed. All T3 victims will be directly transported to the low care unit of the MIH.

The MIH is staffed by personnel from the UMCU and the Central Military Hospital. The MIH has a small group of key staff members (nurses, physicians and supporting staff) who follow monthly trainings and know the MIH and its procedures in detail. During an activation of the MIH these staff members perform coordinating roles. Training sessions are monthly offered to personnel of the UMCU and the Central Military Hospital to become familiar with the MIH materials and procedures. During an activation of the MIH, key staff members will be warned by the primary automated calling system. The surgeon on call can decided to activate the secondary automated calling system, triggering more staffs from different medical specialties.

All previous deployments of the MIH have been described previously [9, 10]. The MIH has been used most frequently to give medical care to repatriated wounded Dutch soldiers and Dutch citizens who have suffered a MCI or disaster in the Netherlands or abroad.

The current report analyzes the fire incident using the protocol for reports from major accidents and disaster (PRMD) [1] to standardize reporting on MCIs.

Materials and methods

All available patient and logistic data from the incident were retrieved from the MIH hospital information systems (written and electronic charts), the Patient Barcode Registration System, the evaluation report from the MIH and the report from the Institute for Safety and Crisis Management which is an independent research agency (Title: Brand in zorgcentrum De Geinsche Hof: Evaluatie van de gebeurtenissen en de aanpak van de brand op 27 juni 2011). Additionally, the data collected by the Regional Ambulance Service Utrecht were analyzed.

The following demographic and patient data were collected: age, gender, types of injuries and treatment. A (possible) respiratory tract injury was classified if one of the following criteria was present: carbonaceous sputum, facial burns/singed hairs, signs of distress or hypoxemia, hoarseness, distinctive breath sounds, oropharynx or nasopharynx swelling or inability to swallow [13].

The statistical software SPSS 20.0 was used for recordkeeping and statistical analyses. The incident was analyzed using the PRMD [1]. We used the standardized tables from the PRMD with liberal variation.

Results

Summary of the scenario/hazard, description of accident

On Monday 27th of June 2011 at 07:55 a.m., a fire started during renovation of the roof of a nursing home and spread through the building. Due to the materials used, a large amount of smoke and soot developed which entered through the nursing home to the air-conditioning system. The inflow of smoke and soot alerted nearly all fire detectors simultaneously. The location manager ordered a complete evacuation, however, at that time the assigned evacuation routes had already been blocked through the exceptional spread of the fire. Thus all departments were eventually cleared by construction workers, nursing staff and bystanders, some patients via the roof of a side building. On the day of the fire, the nursing home had 138 inhabitants, which all had special physical and/or psychiatric needs. Almost all inhabitants were dependent on wheelchairs or other walking aids and sixteen inhabitants were bedridden. There were 49 staff members of the nursing home working at that time of the day.

Pre-hospital availability and alert (Table 1)

The fire department was alerted by an automatic warning system at 07:57 a.m. The first fire engine arrived after 7 min (08:04 a.m.) and concluded that more emergency services were needed. Through the joint emergency dispatch center the first ambulance was called to the scene and arrived 21 min later (08:18 a.m.). The first ambulance on the scene called in at least 10 other ambulances. At the end of the day 23 ambulances were used for the transportation of victims.

Table 1 Pre-hospital available and alerted

Hospital resources availability and alert

The joint emergency center requested the MIH to activate the hospital disaster plan. The MIH, a reserved hospital had 200 beds available, 12 intensive care beds, 16 ventilators and three operation rooms. The hospital closest to the disaster had activated their hospital disaster plan. All other hospitals in the regional trauma system were not called upon.

Utilization of transport resources (Table 2)

A total of 49 patients were treated in a hospital. Twenty-three ambulances transported 47 patients to two different hospitals. The MIH treated 46 patients of which 44 were transported by ambulances and two had other means of transportation. Three patients were transported by ambulance from the incident site to the hospital closest to the incident.

Table 2 Utilization of transport resources

The first patient was transported within 45 min to the nearest hospital in Nieuwegein. The second MCI patient was transported to the MIH after 48 min. All patients were evacuated within 5 h (279 min) after the initial alarm. Two patients reported themselves later that day to the emergency department of the UMCU and were transferred to the adjoining MIH. Additional ambulances were used to transport unharmed clients and staff of the nursing home to nearby sheltering homes. Eight ambulances from three neighboring safety regions assisted the regional ambulance service. The total number of ambulances was sufficient to quickly extract the T1 and T2 patients. The medical assistance during accidents and disasters (GHOR) had arranged additional support staff and materials. The joint emergency dispatch center had requested a free highway lane between the incident and the MIH at the executive body of the Dutch Ministry of Infrastructure and the Environment. This unfortunately resulted in a barrier for some hospital staff to reach the MIH in the simultaneously evolving rush hour.

Hospital alert plan and response (Table 3)

The primary calling system was activated at 08:45 a.m. to alert all key staff members. The alert did not reach all of them on their mobile phones because part of the personnel was already at work and others were commuting to or from work. Switchboard operators of the UMCU additionally phoned all key staff members, wards and heads of department of the UMCU which took a considerable amount of time. The secondary calling system was not activated because the primary calling system combined with the efforts of the switchboard operators had alerted enough key staff members except for IC personnel. Three minutes before the first patient arrived (08:50 a.m.) all primary triage personnel were present. However, IC personnel were still on their way to the MIH when the first T1 patient was intubated. As mentioned before, some incoming staff had been hindered to reach the MIH due to the blocked highway lane.

Table 3 Hospital alert plan and response

Some of the staff members of the UMCU appeared to be unfamiliar with the MIH and its procedures. However, the key MIH staff members made it possible for all other personnel to perform their work in the MIH.

The hospital closest to the incident anticipated an increased patient flow and activated its own disaster plan. This plan was quickly revoked when it became apparent that all patients were transported to the MIH.

Coordination and command (Table 4)

After 13 min (08:12 a.m.) the joint emergency dispatch center had upgraded the incident to a Coordinated Regional Procedure for Incidents Control 1 (GRIP-1) by which a centralized level of disaster management became operational. The local incident commander team (COPI) was formed by the commanders of the firefighters, police and ambulance service, an information manager, a plotter and spokespersons of the nursing home. This multidisciplinary meeting addressed potential bottlenecks (status of the fire, evacuation routes, location of the forwarded medical post, location of sheltering the unharmed, registration and identification of transported clients, initiating psycho-social aftercare). The COPI agreed that unharmed clients were to be transferred only once to a primary shelter location. Busses were used to transport unharmed clients to the primary shelter location of the nursing home. However, by unknown cause and unknown to the COPI, one bus transported unharmed clients to the primary sheltering home of the city council.

Table 4 Coordination and command

At 08:40 a.m., the incident was upgraded to a GRIP II situation. A Regional Operational Team was formed, that consisted of the supreme commanders of all response units, members of the regional organization for medical assistance during accidents and disasters (GHOR) and supporting staff. The COPI advised the Regional Operational Team to improve external communication about the incident and to arrange psycho-social aftercare.

At 09:00 a.m., the incident was upgraded to a GRIP III situation by involvement of the mayor of Nieuwegein who—with a small municipal policy team—started the community disaster plan. The mayor and his team activated the cities sheltering location, started to communicate with the community and activated the Central Registration and Information Bureau for registration and identification of victims. However, the COPI and the nursing home had already taken care of many of these issues. Therefore, work was performed twice which initially confused some of the chain partners.

The MIH was activated through the correct hierarchical steps as described in the MIH protocol. The joint dispatch center requested the emergency department of the University Medical Center of Utrecht to activate the MIH. After consultation with the board of directors, the surgeon on call activated the MIH at 0834 hours (Fig. 1). Subsequently, all ambulances were (re)directed to the MIH. The operational command of the MIH consisted of the surgeon on call, the manager of the MIH and the manager of the emergency department. No major problems occurred in the coordination and command structure. Communication was unhampered between the operational command and the board of directors.

Fig. 1
figure 1

Flowchart of activation of the MIH. JED Joint Emergency Dispatch Center, MM Medical Manager Trauma surgeon on call UMCU, MIH Major Incident Hospital, SN Senior Nurse Emergency Department, UMCU University Medical Center Utrecht

Hospital damage

No damage occurred to the MIH or to the hospital closest to the incident.

Communication system (Table 5)

No major communication or telephone issues arose during the initial phase of fire extinguishing and evacuation. The COPI was quickly operational and functioned properly. Because the COPI were tackling the first phase of the incident, communication between the COPI and the Major Incident Coordinator (located in the joint emergency dispatch center) was suboptimal. Therefore, the Major Incident Coordinator was unable to obtain a complete impression of the situation. After 09:25 a.m., according to the report from the Institute for Safety and Crisis Management, the communication between COPI and the Regional Operational Team was constructive.

Table 5 Communication systems

The National Crisis Management System, which is a relative new digital system, became active during this MCI. This online system receives input from any level of disaster management and can be used by any level (local emergency services, COPI, Regional Operational Team and municipal team). This system was used by the COPI and Regional Operational Team and not by the municipal policy team because it had not been fully implemented. In general, the system functioned in the way intended: producing an overview of the incident. However, although only relevant and verified information should be added, during this incident also partially verified facts, questions and uncertainties had been entered.

The local website of the Nieuwegein community displayed the first information about the incident at 1004 hours and the twitter-account of the community Nieuwegein was activated at 1015 hours. A special phone number was activated to answer questions from the community. Press spokesmen of the city council were sent to all shelter locations and a press conference was held by the municipal policy team at 1145 hours and by the MIH at 1600 hours. In the aftermath of the incident the municipal policy team informed the public through letters, press releases and group gatherings.

The use of the Patient Barcode and Register System in the MIH functioned well. In-ear walkie-talkies were used by all key staff members and one-way pagers and internal and external phones were used without major problems.

The location of each individual evacuee remained unclear for a prolonged time. Even though the majority of injured patients were transported to the MIH, the registration and tracking of all (un)harmed nursing home clients and staff did not function properly. The GHOR requested personal information about patients admitted in the MIH; however, not all victims were able to identify themselves at that time. Furthermore, the MIH managers were uncertain about the legal status of sharing (semi) medical information. A group of the nursing home staff members (22–25 persons) were allowed into the MIH for patient identification. Communication between the MIH and GHOR improved during the incident after a slow start.

Computer technology and back-up systems (Table 6)

No computer system failures occurred during the deployment of the MIH. The Patient Barcode and Register System of the MIH are easy to use and do not need extensive training. However, when the data were analyzed, it was discovered that the internal clock of the computer used for patient registration had not been set correctly. This led to a discrepancy in the registration time of the MIH and the unloading time documented by the ambulances.

Table 6 Completeness of medical files during a MCI

Written patient charts were used to record patient data and all medical files were evaluated afterwards. Due to the high patient flow information had been poorly documented in the primary patient charts, especially of the T1 classed patients. For all transferred patients a discharge letter was prepared. Table 7 shows how data had been recorded in the primary patient chart.

Table 7 Patient characteristics, seen in the MIH

Total number, type and severity of injuries (Fig. 2; Tables 7, 8)

A total of 49 patients were treated in a hospital and medical data of all 46 patients admitted in the MIH were available for this study (Fig. 2).

Table 8 Severity of injuries according to treatment
Fig. 2
figure 2

Patient flowchart

In the MIH, the field triage was reassessed by an experienced surgeon. Thereafter, patients were transported to the corresponding triage- and treatment bay. The majority of patients had been exposed to soot and smoke. Only one patient had suffered from additional traumatic injury due to a difficult rescue procedure. Patients with imminent respiratory insufficiency caused by (possible) inhalation injury or soot in the larynx were intubated preemptively. In total, 6 T1, 11 T2 and 27 T3 patients were presented in the first 2 h after the incident. Two other T3 patients presented themselves later that day at the emergency department of the University Medical Centre of Utrecht. The median age of all 46 patients was 54 (17–96) years. Twenty-eight patients (60.9 %) were 50 years or older.

The first MCI patient was transported to the hospital closest to the incident with possible inhalation injury. Two others were transported later that day from the same incident address to this hospital, one in pulmonary distress, the other with a vascular occlusion, and it remains unknown if these patients were MCI patients.

Initial treatment

Six T1 patients arrived at the MIH within a range of 58–107 min after the initial alarm, their median age was 83 (51–96) years. After primary survey and stabilization, these six patients were directly intubated and transferred to the ICU of the MIH for further treatment.

Eleven T2 patients arrived at the MIH within a range of 53–156 min after the initial alarm, their median age was 80 (17–92) years. Two T2 patients needed mechanical ventilation directly after primary survey. Seven T2 patients were admitted to the medium care and two to the low care ward. Later that day, two T2 patients initially admitted on the medium care deteriorated due to inhalation trauma; both were admitted on the ICU, one needed mechanical ventilation.

Twenty-seven T3 patients arrived at the MIH by ambulance 80–203 min after the initial alarm, median age 54 (20–93) years. Two patients reported themselves later at the emergency department of the UMCU and were linked to the MIH database 356 min after the initial alarm. The T3 patients were observed in the low care ward and were given oxygen.

Transferal from the MIH

Overall, nine patients had needed intubation and mechanical ventilation. After a mean length of stay of 3.10 h, median 2.13 (0.53–7.02) h, four had been admitted to the ICU of the UMCU hospital and five had been transported to ICU’s elsewhere in the Netherlands. After a median length of stay of 4.22 (2.42–6.16) h, nine patients were transferred to a ward in the UMCU for one night observation to exclude delayed onset of pulmonary symptoms. Twenty-six patients could be discharged directly from the MIH after median length of stay of 5.45 (4.26–6.19) h. One of the self-referred patients was transferred to a nearby hospital for further observation; the other patient did not need further observation.

Hospital load

Congestion or lack of material or resources did not occur since the MIH is in essence a stand-alone hospital with a separate stock of supplies. If needed, the MIH can resupply through the UMCU and the Central Military Hospital. The maximum surge capacity of the MIH is 60 patients per hour (with a maximum of 16 T1 patients, 24 T2 patients per hour). These limits were never approached with the 46 admissions, (6 T1, 11 T2 and 29 T3 patients) that were presented in 4 h.

Approximately 175 staff members had been deployed from the University Medical Center Utrecht and the adjoining Central Military Hospital of which ~110 nurses and physicians and 65 supporting staff members. For security reasons, all personnel had passed the registration counter. However, the information on the (handwritten) registration forms was often incomplete or unreadable.

Psychological reactions

Following the MIH activation protocol staffs from the psychology and psychiatric departments were alerted. They have a key role in the direct psychological aftercare for victims, family and if needed medical staff members.

After the incident, group- and individual counseling sessions were organized for all personnel and clients primarily through the Dutch Victim Support group. Moreover, the nursing home itself enabled group- and individual counseling sessions with psychologists specialized in crises related trauma.

Outcome

No pre- or in-hospital deaths occurred. After 3 months, no deaths or persistent disabilities could be linked to the incident. Some nursing home staff members had psychologically suffered from the fire, resulting in frightened reactions after every new fire alarm.

Estimated number of people affected but not injured

Of the 138 inhabitants and 49 staff members of the nursing home, 49 had needed primary medical attention after the incident. Another 31 patients could be discharged after primary observation and treatment in the MIH. The 139 unharmed clients and staff members were temporarily sheltered elsewhere.

Post-accident evaluation (Table 9)

Post-accident evaluation of preparedness

In general the MIH functioned according to the disaster plan. Directly after the incident, all staff members could vent their opinion on every aspect of the MIH activation. This was captured in the first impression report. In the following days a questionnaire was sent to all participating staff members. An evaluation report was drawn up based upon the first impression report, questionnaire and personal experiences. Some areas that need improvement will be addressed in the discussion.

Table 9 Post accident evaluation of the quality of preparedness and of training

Post-accident evaluation of training

During the deployment it appeared that the majority of (key) staff members had been trained properly. Key staff members had been assigned coordinating roles and helped others who were less familiar with the MIH procedures. However, despite monthly offering of training, a minority of non-key staff members were not familiar with the MIH procedures.

Discussion

This report describes the medical response to a MCI caused by a fire in a nursing home. In total, 49 persons needed medical treatment in a hospital. No deaths occurred during the incident or in the 3 months afterwards.

The protocol for reports from major accidents and disasters [1] was used to uniform data reporting. A systematic review compared different available protocols of standardized reporting [14] and we chose this protocol because it was developed to report real incidents, has a practical approach, is freely available, has been published [1, 15, 16] and has been used previously [10, 17, 18]. Other protocols are more extensive but less practical, such as the Utstein template [19], the DISAST-CIR, a protocol used by the Israeli Defense Force Home Front and Ministry of Health [2028] and two unused protocols [29, 30]. None of these protocols have been tested on Internal and external validity [14].

In the pre-hospital phase of the current incident, the different levels of incident managers performed a tight coordination and all emergency services had arrived quickly at the scene. Transport resources were sufficient and were made possible through the support of neighboring safety regions. The decision to activate the MIH was based on the regional disaster plan and had the immediate advantage of being an easy accessible hospital with sufficient capacity to treat all injured patients. In hindsight, the activation of the disaster plan by the nearest hospital might have been unnecessary since nearly all patients were transported to the MIH. However, initially it was unclear if the MIH would open and previous studies have shown that hospitals closest to the incident were overrun by self-referrers [8, 31] and emergency medical services [32, 33].

In the pre-hospital phase two major areas of improvement could be recognized. First due to miscommunication between the different chain partners (local incident commanders, joint emergency dispatch center, the Regional Operational Team and municipal policy team), they were not aware what other chain partners had already accomplished. The communication could be ameliorated if all partners use the National Crisis Management System. If used correctly, this system produces an accurate and immediate overview of all aspects of the MCI and will facilitate interdisciplinary communication between the incident site and chain partners. For instance, if the municipal policy team had been informed that sheltering homes, registration of (unharmed) victims and the aftercare were already arranged by the local incident commanders, they could have focused on other matters.

Second, the registration and tracking of victims proved to be troublesome. Both the local incident commanders and the municipal policy team had arranged sheltering locations. Unknown to the incident commanders, unharmed and unregistered clients were sent to the city councils primary sheltering location. Thereby, it became unclear who was transported to which sheltering home or hospital. Tracking victims during a MCI is a recurrent problem in the Netherlands which is depicted in ministerial reports after the Volendam Café Fire (2001), Queensday incident (2009), Airplane crash (2009) and Shooting incident (2011). The problem often arises due to the lack of reliable and fast technical regional or national systems to register patients before transportation. In 2005 a Victim Tracking System was developed by the UMCU, Regional Ambulance Service Utrecht and GHOR Utrecht which proved its value in registration of victims and enables patient tracking and tracing [34]. However, this system was not implemented in the Netherlands. A (national) tracking system will improve quick registration and triage. Receiving hospitals can anticipate on the number and type of patients en route. And it generates an overview of total patients and type of patients for any level of incident managers.

During the current incident, the MIH had been activated through the correct hierarchical steps and functioned properly. The high number of (pre-emptive) intubations might be considered as overtreatment. However, all of the intubated patients displayed one or more physical findings suggesting respiratory tract injury. Except for the Volendam fire [35], in nearly all previous described indoor fires, most deaths were caused by inhalation injury or high concentration of toxics and less due to severe burns [3643]. Additionally, the intubated patients were of older age, which is an independent major risk factor for mortality [4448].

Some major areas for improvement could be discerned in the hospital phase. First, only the primary automated calling system was used, calling key staff members only. Also, this system could not reach all key staff on their mobile phones at that particular hour of day. Switchboard operators reached them eventually; however, this took a considerable amount of time. Because the UMCU was already in full service, all other personnel were recruited from wards and the out-patient departments. Initially, the ICU of the MIH was understaffed. Staffing of the ICU and the amount of mechanical ventilators are always potential bottlenecks during a MCI [4951]. Using the secondary calling system would have alarmed more ICU staff members as well as volunteers of the Dutch Red Cross, resulting in more helping hands. In future activations of the MIH, staff shortages can be prevented by invariably initiating the secondary calling system. To facilitate the entire warning process new ideas are currently implemented, using a new automated warning system that can place automated internal calls and send mobile text messages. In case of activation of the MIH, every UMCU and Central Military Hospital computer should receive an informative pop-up.

Second, even though the MIH offers a monthly training for all staff, it became clear that not all UMCU personnel were familiar with the procedures of the MIH. However, the outcome was not influenced since proper trained key staff members had coordinating roles. Nevertheless, efforts to increase knowledge of MIH organizational procedures for non-key staff members will be intensified.

Third, the handwritten forms to register incoming personnel proved incomplete or unreadable. This led to the prompt development of an automated system through which personnel can register themselves by swiping their employee card in front of a radio frequency identification reader. A hospital security member will ensure that every staff member is registered by the scanner.

Fourth, the written medical charts proved to be too elaborate for an acute deployment. The initial registration of patient data during the primary survey was very poor. Therefore, a new concise medical file has been developed which already proved its value in a recent major exercise and during other activations of the MIH.

Fifth, sharing (semi) medical information between hospitals and the medical assistance during accidents and disasters and governmental officials is a recurrent problem in the Netherlands as also concluded by the ministerial reports after the Volendam Café Fire (2001), Queensday incident (2009), Airplane crash (2009) and Shooting incident (2011) and independent research [52]. During the current incident, the MIH did not release this information directly to the responsible body due to the pressure of increased patient flow, the impossibility to identify patients directly and partly due to the unfamiliarity with the legal status. New covenants between the medical assistance during accidents and disasters and hospitals have recently been signed to avoid these uncertainties in the future.

Conclusion

The pre-hospital (medical) services, coordinating bodies, and medical assistance during accidents and disasters performed fast and good work. Despite the fact that the majority of patients were elderly and/or disabled, no pre- or in-hospital deaths occurred. Furthermore in the 3 months after the MCI, no deaths or persistent disabilities could be linked to the incident. The MIH demonstrated its strength to provide emergency care for 46 patients and was able to quickly accommodate nine intubated patients. In the pre-hospital phase, communication between chain partners and victim tracking should be improved. In the MIH, improvements will be implemented in the calling system, registration of incoming staff, training of non-key staff members, the development of a concise medical chart and improve communication between the chain patterns.