Conclusions
Under conditions of the economic crisis extensive overhaul with complete dismantling of the units makes it possible to prolong the life of crucial components and parts of the unit and to maintain the operating capability of the turbine equipment before its replacement. The effectiveness of the works being carried out is indicated by the high performance characteristics and reliable operation of the components of the unit.