Experience in extensive overhaul of the units at the Volga-Lenin hydroelectric station

  • Reconstruction of Turbine Equipment at Hydroelectric Stations
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

Under conditions of the economic crisis extensive overhaul with complete dismantling of the units makes it possible to prolong the life of crucial components and parts of the unit and to maintain the operating capability of the turbine equipment before its replacement. The effectiveness of the works being carried out is indicated by the high performance characteristics and reliable operation of the components of the unit.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 26–28, August, 1995.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Khurtin, V.A., Ignatushin, A.V. Experience in extensive overhaul of the units at the Volga-Lenin hydroelectric station. Hydrotechnical Construction 29, 443–445 (1995). https://doi.org/10.1007/BF02446369

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02446369

Keywords

Navigation