The V. I. Lenin Plyavin'sk hydroelectric plant — Winner of the prize from the Council of Ministers of The USSR

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

The commission of experts of the Government Committee for Construction of the USSR gave a general evaluation of the design and construction of the Plyavin'sk hydroelectric plant, in which it is stated that the construction of this plant is an example of creative purposeful work of a collective of designers, scientific workers, constructors, and operators. At the same time, it is recommended that the Ministry of Power and Electrification of the USSR put into effect the following measures:

  • a) in order to provide a wide dissemination of the experience with the design, construction, and operation of the Plyavin'sk hydroelectric plant, to speed up the publication of the technical reports from the Gidroproekt Institute on the design, construction, and experience with its operation;

  • b) to make wider use in the reinforced-concrete structures of the projected hydraulic developments of the precast reinforced concrete elements used at the Plyavin'sk plant;

  • c) to apply at other construction projects of the Ministry the experience with the operating control of the quality of the construction-erection work;

  • d) with a view to increasing the power effectiveness of the Plyavin'sk hydroelectric plant and of all the plants being constructed on the Lower Daugav, to ensure the required financing contemplated under the Five-Year Plan for the period 1971–1975, and to expand the Kegumsk hydroelectric plant, in order to speed up the introduction of highly effective additional capacity;

  • e) to work out measures for eliminating the design and technical deficiencies discovered in the design and construction of the Plyavin'sk plant, and to control the introduction of these measures.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. G. V. Rubinshtein and G. B. Sandomirskii, “Plyavin'sk hydroelectric station on the Daugav River,” Gidrotekh. Stroitel'., No. 3 (1968).

  2. K. K. Ketner and Yu. Ya. Mazur, “Operating conditions of hydroelectric plants in the Daugav system,” Gidrotekh. Stroitel'., No. 3 (1968).

  3. N. N. Pestovskii, “Engineering-geologic construction conditions of the Plyavin'sk hydraulic development,” Gidrotekh. Stroitel'., No. 2 (1970).

  4. A. D. Taukach, “V. I. Lenin Plyavin'sk hydroelectric station in the Latvian SSR and its operation,” Gidrotekh. Stroitel'., No. 2 (1970).

  5. Kh. É. Yaunzems and V. M. Filippov, “Hydromechanical equipment of the V. I. Lenin Plyavin'sk hydroelectric station,” Gidrotekh. Stroitel'., No. 2 (1970).

  6. Ya. F. Knok, M. F. Rogal', and V. I. Belov, “Control of the state of the structures at the V. I. Lenin Plyavin'sk hydroelectric plant (Latvian SSR),” Gidrotekh. Stroitel'., No. 12 (1972).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 1–5, September, 1973.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Grech, V.I., Yumatov, A.B. The V. I. Lenin Plyavin'sk hydroelectric plant — Winner of the prize from the Council of Ministers of The USSR. Hydrotechnical Construction 7, 813–820 (1973). https://doi.org/10.1007/BF02377158

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02377158

Keywords

Navigation