Conclusions
Experience with use of the “Karat” automatic control system during construction of the dam for the Nurek hydroelectric plant demonstrated its high cost effectiveness and the expediency of using similar systems in similar projects, and, in particular, in the construction of the dam for the Rogun hydroelectric plant.
Similar content being viewed by others
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 11, pp. 6–9, November, 1980.
Rights and permissions
About this article
Cite this article
Lashchenov, S.Y., Rymarevich, V.I., Vil'vovskii, V.V. et al. Experience with and the effectiveness of automatic systems for control of loading-hauling operations during construction of the dam for Nurek hydroelectric plant. Hydrotechnical Construction 14, 1109–1114 (1980). https://doi.org/10.1007/BF02307986