Experience with and the effectiveness of automatic systems for control of loading-hauling operations during construction of the dam for Nurek hydroelectric plant

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

Experience with use of the “Karat” automatic control system during construction of the dam for the Nurek hydroelectric plant demonstrated its high cost effectiveness and the expediency of using similar systems in similar projects, and, in particular, in the construction of the dam for the Rogun hydroelectric plant.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 11, pp. 6–9, November, 1980.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lashchenov, S.Y., Rymarevich, V.I., Vil'vovskii, V.V. et al. Experience with and the effectiveness of automatic systems for control of loading-hauling operations during construction of the dam for Nurek hydroelectric plant. Hydrotechnical Construction 14, 1109–1114 (1980). https://doi.org/10.1007/BF02307986

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02307986

Keywords

Navigation