Monitoring of the concrete dam of the Boguchany hydroelectric station in the construction period

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    Since the start of construction of the Boguchany hydrostation, 1184 remote transducers, which are used for monitoring the state of sections of the concrete dam and foundation during the construction period, have been installed in the concrete dam as of October 1992. An automated system for processing and analyzing the data of observations has been created and is being introduced, which will make possible prompt monitoring of the state of sections of the concrete dam and foundations in the construction period.

  2. 2.

    The stress state of the columns during construction is determined mainly by the temperature regime of the concrete of the columns. The values of normal stresses in the columns of the monitored section on vertical areas are within ±1 MPa. An increase of compressive stresses is observed on horizontal areas, which is related to an increase of the load as the columns are built up. According to the monitoring data, the column joints have a width within 0.5–2.0 mm, which is sufficient for grouting. Under all columns of the dam section the deformations of the rock foundation are due to the load from the mass of concrete, and in the spillway section, in addition, from the mass of water. An increase of compressive strains diminishing with time is observed under the effect of a constant load on the foundation (interruption in concreting).

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. I. R. Gal'perin, I. F. Blinov, B. A. Lavrov, and E. M. Mirzak, “Results of monitoring the stress-strain state of the concrete dam of the Boguchany hydroelectric station in the construction period,” Tr. Gidroproekta, No. 135 (1990).

  2. P. Ya. Slul'skii, The Boguchany Dam on the Angara River. No. 12: Geology and Dams [in Russian], Énergoatomizdat, Moscow (1992).

    Google Scholar 

  3. I. F. Blinov, E. M. Mirzak, and I. R. Gal'perin, “Use of analogous values of rheological properties of concrete,” Gidrotekh. Stroit., No. 7 (1988).

  4. I. E. Pukhov, “Method of investigating the elastoplastic characteristics of concrete in the body of a hydraulic structure,” Gidrotekh. Stroit., No. 1 (1977).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 3–8, September, 1993.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Blinov, I.F., Mirzak, E.M., Lavrov, B.A. et al. Monitoring of the concrete dam of the Boguchany hydroelectric station in the construction period. Hydrotechnical Construction 27, 501–507 (1993). https://doi.org/10.1007/BF01545368

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01545368

Keywords

Navigation