Conclusions
Quite brief operation of the suction dredge and its pipeline on clear water permits determining the minimum value of the head being developed by a given dredge, and all subsequent heads during its operation with mixtures permit, with consideration of other factors (as indicated), determining the amount of solids being transported by water through the pipeline at a given time and during any time period in tons or cubic meters.
Similar content being viewed by others
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 45–47, October, 1992.
Rights and permissions
About this article
Cite this article
Ivanov, A.E. Output of suction dredges with respect to solids. Hydrotechnical Construction 26, 677–680 (1992). https://doi.org/10.1007/BF01544772