Experience with construction of the first units of the Hoabinh hydroelectric plant

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The equipment of the Hoabinh hydroelectric plant operates in conformity with the specified parameters and ensures utilization of the installed capacity in the power system of North Vietnam. Further increase in the effectiveness of utilization of the plant capacity and of its specific share in the base portion of the load graph are determined by development of the transmission line system for supply to the consumers and the interconnection with the power system of central Vietnam.

  2. 2.

    As a result of the investigations and the introduced measures for realization of the multistage personnel training system, safe and accident-free operation has been ensured for operation of the first units under conditions of combination with construction-erection work in the underground complex of the hydroelectric plant.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, pp. 45–48, June, 1991.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Tul'chinskii, G.A., Khet, B.T. Experience with construction of the first units of the Hoabinh hydroelectric plant. Hydrotechnical Construction 25, 364–367 (1991). https://doi.org/10.1007/BF01423761

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01423761

Keywords

Navigation