Skip to main content
Log in

A study of FMS part type selection approaches for short-term production planning

  • Published:
International Journal of Flexible Manufacturing Systems Aims and scope Submit manuscript

Abstract

This research compares seven approaches from the literature to the selection of part types for simultaneous production over the next time horizon. A flexible approach to the selection of part types and the simultaneous determination of their mix ratios so as to balance aggregate machine workloads is presented. Constraints on tool magazine capacity are considered. Simulation studies are conducted on realistic, detailed models of flexible flow systems (FFSs) configured as pooled machines of equal sizes. The simulated settings are constructed to evaluate the impact of such factors as blocking, transportation, buffer utilizations, and fixture requirements and limitations of various types.

One of the goals of this study is to encourage industry to relax, for those FMS types for which the procedure is appropriate, what is essentially an artificial constraint: that tool changing be isolated in time, to a period between batches. For other types of FMSs, batching may be appropriate.

The results indicate that using the flexible approach enables the system to be more highly utilized. It is also observed that the batching approaches tend to require more fixtures of each type than the flexible approach. The system utilizations for the batching approaches seem to be more sensitive to restrictions on the number of fixtures of each type. Further research needs are also discussed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Berrada, M. and Stecke, K. E., “A Branch-and-Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems,”Management Science 32, pp. 1316–1335 (October 1986).

    Google Scholar 

  • Campbell, H. G., Dudek, R. A. and Smith, M. L., “A Heuristic Algorithm for then Job,m Machine Sequencing Problem.”Management Science 16, pp. 630–637 (June 1970).

    Google Scholar 

  • Hwang, S., “Part Selection Problems in Flexible Manufacturing Systems Planning Stage,” inProceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems (Ann Arbor, MI), K. E. Stecke and R. Suri (eds.) Amsterdam: Elsevier, (1986), pp. 297–309.

    Google Scholar 

  • Kusiak, A., “The Part Families Problem in Flexible Manufacturing Systems,”Annals of Operations Research 3: pp. 279–300 (1985).

    Google Scholar 

  • Rajagopalan, S. “Formulation and Heuristic Solution for Parts Grouping and Tool Loading in Flexible Manufacturing Systems,” inProceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems (Ann Arbor, MI), K. E. Stecke and R. Suri (eds.) Amsterdam: Elsevier (1986), pp. 311–320.

    Google Scholar 

  • Schrage, L. E.,Linear Programming Models with LINDO, Scientific Press, Palo Alto, CA (1981).

    Google Scholar 

  • Schriber, T. J., “A GPSS/H Model for a Hypothetical Flexible Manufacturing System,”Annals of Operations Research 3, pp. 171–188 (1985).

    Google Scholar 

  • Schriber, T. J. and Stecke, K. E., “Machine Utilizations and Production Rates Achieved by Using Balanced Aggregate FMS Production Ratios in a Simulated Setting,” inProceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems (Ann Arbor, MI), K. E. Stecke and R. Suri (eds.) Amsterdam: Elsevier (1986) pp. 405–416.

    Google Scholar 

  • . “Using Mathematical Programming and Simulation to Study FMS Machine Utilizaions,” inProceedings of the 1987 Winter Simulation Conference, A. Thesen, H. Grant, and W. D. Kelton, (eds.) San Diego, CA: Society for Computer Simulation (1987).

    Google Scholar 

  • Shanthikumar, J. G. and K. E. Stecke. “Reducing Work-in-Process Inventory in Certain Classes of Flexible Manufacturing Systems.”European Journal of Operational Research 26, pp. 266–271 (August 1986).

    Google Scholar 

  • Stecke, K. E. “Procedures to Determine Both Appropriate Production Ratios and Minimum Inventory Requirements to Maintain These Ratios in Flexible Manufacturing Systems,” Working Paper 448. Graduate School of Business Administration, The University of Michigan, Ann Arbor, MI 48109 (1985).

    Google Scholar 

  • Stecke, K. E., and I. Kim. “A Flexible Approach to Implementing the Short-Term FMS Planning Function,” inProceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems (Ann, Arbor, MI), K. E. Stecke and R. Suri (eds.) Amsterdam: Elsevier, (1986a) pp. 283–295.

    Google Scholar 

  • . “Decision Aids for FMS Part Type Selection Using Aggregate Production Ratios to Study Pooled Machines of Unequal Sizes.” Working Paper 478. Graduate School of Business Administration, University of Michigan, Ann Arbor, MI 48109 (1986b).

    Google Scholar 

  • —. “A Study of Unbalancing and Balancing for Systems of Pooled Machines of Unequal Sizes,” inProceedings of the IEEE Robotics and Automation Conference (Raleigh, NC), (1987a).

  • Stecke, K. E.. “Comparison of Various Approaches to the Part Type Selection Problem in Flexible Manufacturing Systems,” inProceedings of the Ninth International Conference on Production Research (Cincinnati, OH), A. Mital, (ed.) (1987b).

  • Stecke, K. E. and T. L. Morin. “The Optimality of Balancing Workloads in Certain Types of Flexible Manufacturing Systems,”European Journal of Operational Research 20, pp. 68–82 (April 1985).

    Google Scholar 

  • Stecke, K. E. and J. J. Solberg, “The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues,”Operations Research 33, pp. 882–910 (July–August 1985).

    Google Scholar 

  • Stecke, K. E. and F. B. Talbot, “Heuristics for Loading Flexible Manufacturing Systems,” inFlexible Manufacturing: Recent Developments in FMS, Robotics, CAD/CAM, CIM, A. Raouf and S. I. Ahmad, (eds.) Amsterdam: Elsevier (1985) pp. 73–84.

    Google Scholar 

  • Whitney, C. K. and T. S. Gaul. “Sequential Decision Procedures for Batching and Balancing in FMSs,” inProceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems (Ann Arbor, MI), K. E. Stecke and R. Suri (eds.) Amsterdam: Elsevier (1984) pp. 243–248.

    Google Scholar 

  • Whitney, C. K. and R. Suri. “Algorithms for Part and Machine Selection in Flexible Manufacturing Systems,”Annals of Operations Research 3: pp. 239–261 (1985).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Stecke, K.E., Kim, I. A study of FMS part type selection approaches for short-term production planning. Int J Flex Manuf Syst 1, 7–29 (1988). https://doi.org/10.1007/BF00713157

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00713157

Keywords

Navigation