One of the most crucial production wastes of zinc factories is the cold purification cake, which can be used as feed for nickel production factories. The cake contains metals such as Zn, Cd, and Ni with a high percentage. In separating nickel from the cold purification cake, the high concentration of cadmium in the cake causes a reduction in the efficiency of nickel extraction. Therefore, removing or reducing the cadmium concentration from the leach solution is necessary before extracting the nickel from the solution resulting from the leaching cake. One of the conventional methods in the cadmium removal process is the cementation method. Among the disadvantages of the cementation method, we can mention the removal of other cations in the solution, such as Ni2+. Therefore, the main goal of this research is to optimize the cadmium cementation process so that the lowest amount of Ni2+ is cemented. This research investigated the parameters influencing nickel and cadmium cementation, including temperature, reaction time, pHi, stirring rate, the amount of zinc powder consumed, and the granulation of zinc powder. The results indicated that the optimal temperature value, reaction time, pHi, and stirring rate are 45 °C, 2 and 5 min, and rpm 250, respectively. Another significant result in this research was the effect of granulation and the amount of zinc powder on the removal percentage. The results indicated that the highest removal percentage for cadmium and the lowest one for nickel occurred in particle size 250 µ. In addition, if the amount of zinc powder used is 1.5 times the stoichiometric value, then the optimal removal of cadmium and nickel will be achieved.

Graphical Abstract

Making an investigation into the effect of parameters influential on the cadmium cementation process and provision of optimal conditions. Determining the appropriate conditions to remove the maximum amount of cadmium against the lowest amount of nickel from the leach solution. Trying for the cementation process of zinc powder to be schematic and performing detailed analyses of cemented materials on the powder to describe the cementation process.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10

Similar content being viewed by others

References

  1. S. Kumar Sahu, M. Kargar Razi, M. Beuscher, A. Chagnes, Recovery of metal values from Ni–Cd cake waste residue of an Iranian zinc plant by hydrometallurgical route. Metals 10(5), 655 (2020)

    Article  Google Scholar 

  2. M. Mohammadzadeh, H. Bagheri, S. Ghader, Study on extraction and separation of Ni and Zn using [bmim][PF6] IL as selective extractant from nitric acid solution obtained from zinc plant residue leaching. Arab. J. Chem. 13(6), 5821–5831 (2020)

    Article  Google Scholar 

  3. B.K. Reck, D.B. Müller, K. Rostkowski, T. Graedel, Anthropogenic nickel cycle: Insights into use, trade, and recycling. Environ. Sci. Technol. 42(9), 3394–3400 (2008)

    Article  Google Scholar 

  4. A. Christie, R. Brathwaite, Mineral commodity report 10-nickel. New Zealand mining, 39–45 (1995)

  5. M.S. Safarzadeh, D. Moradkhani, P. Ashtari, Recovery of zinc from Cd–Ni zinc plant residues. Hydrometallurgy 97(1–2), 67–72 (2009)

    Article  Google Scholar 

  6. M.S. Safarzadeh, D. Moradkhani, M.O. Ilkhchi, N.H. Golshan, Determination of the optimum conditions for the leaching of Cd–Ni residues from electrolytic zinc plant using statistical design of experiments. Sep. Purif. Technol. 58(3), 367–376 (2008)

    Article  Google Scholar 

  7. B. Gupta, A. Deep, P. Malik, Extraction and recovery of cadmium using Cyanex 923. Hydrometallurgy 61(1), 65–71 (2001)

    Article  Google Scholar 

  8. V. Kumar, M. Kumar, M.K. Jha, J. Jeong, J.-C. Lee, Solvent extraction of cadmium from sulfate solution with di-(2-ethylhexyl) phosphoric acid diluted in kerosene. Hydrometallurgy 96(3), 230–234 (2009)

    Article  Google Scholar 

  9. Y. Qiu, L. Yang, S. Huang, Z. Ji, Y. Li, The separation and recovery of copper (II), nickel (II), cobalt (II), zinc (II), and cadmium (II) in a sulfate-based solution using a mixture of Versatic 10 acid and Mextral 984H. Chin. J. Chem. Eng. 25(6), 760–767 (2017)

    Article  Google Scholar 

  10. R. Singh, H. Mahandra, B. Gupta, Recovery of zinc and cadmium from spent batteries using Cyphos IL 102 via solvent extraction route and synthesis of Zn and Cd oxide nanoparticles. Waste Manage. 67, 240–252 (2017)

    Article  Google Scholar 

  11. D. Moradkhani, M. Rasouli, D. Behnian, H. Arjmandfar, P. Ashtari, Selective zinc alkaline leaching optimization and cadmium sponge recovery by electrowinning from cold filter cake (CFC) residue. Hydrometallurgy 115, 84–92 (2012)

    Article  Google Scholar 

  12. M. Gharabaghi, M. Irannajad, A.R. Azadmehr, Acidic leaching of cadmium from zinc plant residue. Physicochem. Prob. Min. Process. 47, 91–104 (2011)

    Google Scholar 

  13. K. Shayesteh, P. Abbasi, V. Vahid Fard, M. Hosseini, Providing a practical solution to solve environmental problems caused by the waste (cake) resulting from the cold refining process in the zinc production process. Environ. Sci. Technol. 23(1), 53–63 (2021)

    Google Scholar 

  14. B.S. Boyanov, V.V. Konareva, N.K. Kolev, Purification of zinc sulfate solutions from cobalt and nickel through activated cementation. Hydrometallurgy 73(1–2), 163–168 (2004)

    Article  Google Scholar 

  15. K. BØrve, T. Østvold, Norzink removal of cobalt from zinc sulphate electrolytes, in Hydrometallurgy. (Springer, Netherlands, 1994), pp.563–577

    Chapter  Google Scholar 

  16. B.J. Krause, in Optimisation of the purification process of a zinc sulfate leach solution for zinc electrowinning, University of Pretoria, 2014

  17. S. Song, W. Sun, L. Wang, R. Liu, H. Han, Y. Hu, Y. Yang, Recovery of cobalt and zinc from the leaching solution of zinc smelting slag. J. Environ. Chem. Eng. 7(1), 102777 (2019)

    Article  Google Scholar 

  18. W.X. Tan, N. Mohamed, Electrogenerative removal of cobalt from sulfate solutions using a batch reactor. Clean: Soil, Air, Water 39(5), 460–466 (2011)

    Google Scholar 

  19. R. Raghavan, P. Mohanan, S. Verma, Modified zinc sulphate solution purification technique to obtain low levels of cobalt for the zinc electrowinning process. Hydrometallurgy 51(2), 187–206 (1999)

    Article  Google Scholar 

  20. V. Van der Pas, D. Dreisinger, A fundamental study of cobalt cementation by zinc dust in the presence of copper and antimony additives. Hydrometallurgy 43(1–3), 187–205 (1996)

    Google Scholar 

  21. M.S. Safarzadeh, M. Sheikh Shab Bafghi, D Moradkhani, M.O. Ilkhchi, 2015, Optimization of cadmium cementation from the solution obtained from the leaching filter cake of zinc electrolyte purification, in the 10th annual congress of the Iranian Association of Metallurgical Engineers, Shiraz, https:// civilica.com/doc/104731

  22. K. Shayesteh, P. Abbasi, V. Vahid Fard, M. Shahedi Asl, Simultaneous removal of nickel and cadmium during the cold purification of zinc sulfate solution. Arab. J. Sci. Eng. 45(2), 587–598 (2020)

    Article  Google Scholar 

  23. M.D. Rao, A. Meshram, H.R. Verma, K.K. Singh, T.R. Mankhand, Study to enhance cementation of impurities from zinc leach liquor by modifying the shape and size of zinc dust. Hydrometallurgy 195, 105352 (2020)

    Article  Google Scholar 

  24. N. Amin, E.Z. El-Ashtoukhy, O. Abdelwahab, Rate of cadmium ions removal from dilute solutions by cementation on zinc using a rotating fixed bed reactor. Hydrometallurgy 89(3–4), 224–232 (2007)

    Article  Google Scholar 

  25. A. Nelson, W. Wang, G. Demopoulos, G. Houlachi, The removal of cobalt from zinc electrolyte by cementation: a critical review. Miner. Proces. Extr. Metall. Rev. 20(1), 325–356 (2000)

    Article  Google Scholar 

Download references

Funding

All authors certify that they have no affiliations with or involvement in any organization or entity with any financial interest or non-financial interest in the subject matter or materials discussed in this manuscript. The authors did not receive support from any organization for the submitted work.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Keivan Shayesteh.

Ethics declarations

Conflict of interest

On behalf of all authors, the corresponding author states that there is no conflict of interest.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zahmati, F., Shayesteh, K. & Vahidfard, V. Removal of Cadmium in Process of Nickel Production Out of Cold Purification Waste of Zinc Factories. J. Inst. Eng. India Ser. D (2024). https://doi.org/10.1007/s40033-023-00617-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s40033-023-00617-0

Keywords

Navigation