Surface facility optimization for combined shale oil and gas development strategies

  • Research Article
  • Published:
Optimization and Engineering Aims and scope Submit manuscript

Abstract

In the context of a global energy transition, oil and gas will remain an important part of the energy mix, especially in developing countries. The challenge of energy companies is to adapt to a changing policy and investment landscape, and still remain competitive. In this work we present a generalized optimization framework for the design of oil and gas gathering networks accounting for combined shale oil and gas development strategies. We develop mixed-integer linear (MILP) and quadratically constrained models (MIQCP) to optimally determine the network of pipelines, separation, processing and delivery facilities for both oil and gas. In contrast to previous approaches, the networks are built with no predetermined number of echelons. We assume that there is a set of generic nodes to be connected among themselves to reach the final destinations. By including pressures as decisions variables, flowrates and flow directions can be optimally determined along the time horizon to make a better use of the transportation capacity. Stochastic programming extensions of the models permit to determine the network of surface facilities that maximizes the expected net present value of the project under uncertain scenarios. Oil and gas prices may significantly change in the future, leaving open the question as to whether the focus will be on developing wells producing more oil than gas, or vice-versa. Shale oil and shale gas wells usually coexist in nearby regions of the same formation. Therefore, there is a nontrivial decision on where and when to build and expand the gathering networks. We assess the potential of the formulations by solving four case studies from the unconventionals industry.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15

Similar content being viewed by others

Availability of data and materials

Not Applicable.

Code availability

Not Applicable.

Abbreviations

D :

Alternative pipeline diameters

E :

Alternative sizes for capacity expansions

K :

Components in the production flow (oil, gas, water)

R :

Rows of wellpads

S :

Alternative sizes for processing and delivery facilities

T :

Time periods

TI \(\subseteq \) T :

Subset of time periods when investments can be made

W :

Wellpads

\({J}_{r}\subseteq R\) :

Subset of rows that can be directly connected with row r through a pipeline segment

\({W}_{r}\subseteq W\) :

Wellpads comprising row r

\(\omega \) :

Index accounting for scenarios in the stochastic formulations

\({dc}_{k,e}\) :

Delivery capacity added by an expansion of size e for component k

\({diam}_{d}\) :

Value of diameter d, usually in inches

\(i\) :

Discount rate for evaluating cashflows over time

\({idp}_{k,e}\) :

Installation cost of an expansion of size e for the delivery of component k

\({ipf}_{k,s}\) :

Installation cost of a processing facility of size s for component k

\({ipl}_{k,d,r,{r}^{^{\prime}}}^{P}\) :

Installation cost of a pipeline of diameter d for processed component k, connecting rows r and r’

\({ipl}_{k,d,r,{r}^{^{\prime}}}^{U}\) :

Installation cost of a pipeline of diameter d for unprocessed component k, connecting rows r and r’

\({isf}_{s}\) :

Installation cost of a separation facility of size s

\({odp}_{k,r}\) :

Unit operating cost of a delivery point for component k installed in row r

\({opf}_{k,r}\) :

Unit operating cost of a processing facility for component k installed in row r

\({opl}_{k,d,r,{r}^{^{\prime}}}^{P}\) :

Unit operating cost of a pipeline of diameter d for processed component k moving from row r to r’

\({opl}_{k,d,r,{r}^{^{\prime}}}^{U}\) :

Unit operating cost of a pipeline of diameter d for unprocessed component k moving from row r to r’

\({osf}_{k,r}\) :

Operating cost per unit of k being separated in row r

\({p}_{k,w,r,t}\) :

Production rate of component k from wellpad w in row r during period t

\({pc}_{k,s}\) :

Processing capacity of a facility of size s for component k

\({price}_{k,t}\) :

Net income per unit of component k, from the price forecasted for period t

\({sc}_{k,s}\) :

Separation capacity for component k in a facility of size s

\({tc}_{k,d}\) :

Transportation capacity of a pipeline of diameter d for component k

\({\alpha }_{k}\) :

Conversion factor from unprocessed to processed flows of component k

\({\Delta spp\boldsymbol{ }}_{r,{r}^{^{\prime}}}^{ Max}\) :

Maximum difference of processed gas square pressures between rows r and r’

\({\Delta spu\boldsymbol{ }}_{r,{r}^{^{\prime}}}^{ Max}\) :

Maximum difference of unprocessed gas square pressures between rows r and r’

\(\varphi \) :

Constant from Weymouth correlation for gas fluid-dynamic calculations

\({D}_{k,r,t}\) :

Flow of component k delivered from a facility of row r during period t

ENPV :

Expected net present value of the development project under uncertain scenarios

\({f}_{w,r,t}\) :

Fraction of the production coming from wellpad w in row r that is curtailed during period t

\({MaxFlowP}_{d,r,{r}^{^{\prime}},t}\) :

Maximum admissible flow for processed gas moving from r to r’ through a pipeline of diameter d during period t

\({MaxFlowU}_{d,r,{r}^{^{\prime}},t}\) :

Maximum admissible flow for unprocessed gas moving from r to r’ through a pipeline of diameter d during period t

\({NPC}_{oil/gas}\) :

Total net present cost of the oil/gas gathering network

NPV :

Net present value of the combined shale oil and gas development project

\({Q}_{k,r,{r}^{^{\prime}},t}\) :

Flowrate of unprocessed component k moving from r to r’ during period t

\({P}_{k,r,t}\) :

Flowrate of component k processed in a facility of row r during period t

\({PP}_{r,t }^{sq}\) :

Square pressure of processed gas flowing through row connection r during period t

\({PU}_{r,t }^{sq}\) :

Square pressure of unprocessed gas flowing through row connection r during period t

\({R}_{k,r,{r}^{^{\prime}},t}\) :

Flowrate of processed component k moving from r to r’ during period t

\({\tau }_{\omega }\) :

Probability of scenario \(\omega \)

\({u}_{k,d,r,{r}^{^{\prime}},t}\) :

 = 1 If a pipeline of diameter d for unprocessed component k is installed between rows r and r’ at period t

\({u}_{di{r}_{r,{r}^{^{\prime}},t}}\) :

 = 1 If unprocessed gas flows from r to r’ during period t

\({v}_{k,d,r,{r}^{^{\prime}},t}\) :

 = 1 If a pipeline of diameter d for processed component k is installed between rows r and r’ at period t

\({v}_{di{r}_{r,{r}^{^{\prime}},t}}\) :

 = 1 If processed gas flows from r to r’ during period t

\({x}_{k,s,r,t}\) :

 = 1 If a processing facility of size s for component k is installed in row r at period t

\({y}_{k,e,r,t}\) :

 = 1 If an expansion of size e for the delivery of component k is installed in row r at period t

\({z}_{s,r,t}\) :

 = 1 If a separation facility of size s is installed in r at period t

References

  • Allen RC, Allaire D, El-Halwagi MM (2019) Capacity planning for modular and transportable infrastructure for shale gas production and processing. Ind Eng Chem Res 58:5887–5897

    Article  Google Scholar 

  • Balasubramanian J, Grossmann IE (2004) Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Ind Eng Chem Res 43:3695–3713

    Article  Google Scholar 

  • Cafaro DC, Grossmann IE (2014) Strategic planning, design, and development of the shale gas supply chain network. AIChE J 60:2122–2142

    Article  Google Scholar 

  • Cafaro DC, Grossmann IE (2020) Optimal design of water pipeline networks for the development of shale gas resources. AIChE J 67(1):e17058. https://doi.org/10.1002/aic.17058

    Article  Google Scholar 

  • Drouven M, Grossmann IE (2016) Multi-period planning, design, and strategic models for long-term, quality-sensitive shale gas development. AIChE J 62:2296–2323

    Article  Google Scholar 

  • Gao J, You F (2017) Design and optimization of shale gas energy systems: overview, research challenges, and future directions. Comput Chem Eng 106:699–718

    Article  Google Scholar 

  • Gao J, Ning C, You F (2019) Data-driven distributionally robust optimization of shale gas supply chains under uncertainty. AIChE J 65:947–963

    Article  Google Scholar 

  • Guerra OJ, Calderón AJ, Papageorgiou LG, Siirola JJ, Reklaitis GV (2016) An optimization framework for the integ. of water management and shale gas supply chain design. Comput Chem Eng 92:230–255

    Article  Google Scholar 

  • Hong B, Li X, Song S, Chen S, Zhao C, Gong J (2020a) Optimal planning and modular infrastructure dynamic allocation for shale gas production. Appl Energy. https://doi.org/10.1016/j.apenergy.2019.114439

    Article  Google Scholar 

  • Hong B, Li X, Di G, Song S, Yu W, Chen S, Li Y, Gong J (2020b) An integrated MILP model for optimal planning of multi-period onshore gas field gathering pipeline system. Comput Ind Eng. https://doi.org/10.1016/j.cie.2020.106479

    Article  Google Scholar 

  • International Energy Agency (IEA) (2021) World energy outlook 2021. OECD Publishing

  • Johnston RJ, Blakemore R, Bell R (2020) The role of oil and gas companies in the energy transition. Atlantic Council, Washington

    Google Scholar 

  • Kroetz K, Shih J-S, Siikamäki JV, Marianov V, Krupnick A, Chu Z (2019) Systematically incorporating environmental objectives into shale gas pipeline development: a binary integer, multiobjective spatial optimization model. Environ Sci Technol 53:7155–7162

    Article  Google Scholar 

  • Li C, Grossmann IE (2021) A review of stochastic programming methods for optimization of process systems under uncertainty. Front Chem Eng. https://doi.org/10.3389/fceng.2020.622241

    Book  Google Scholar 

  • Montagna AF, Cafaro DC, Grossmann IE, Burch D, Shao Y, Wu X-H, Furman K (2021) Pipeline network design for gathering unconventional oil and gas production using mathematical optimization. Opt Eng. https://doi.org/10.1007/s11081-021-09695-z

    Article  MATH  Google Scholar 

  • Ondeck A, Drouven M, Blandino N, Grossmann IE (2019) Multi-operational planning of shale gas pad development. Comput Chem Eng 126:83–101

    Article  Google Scholar 

  • Society of Petroleum Engineers (2006) Petroleum engineering handbook

  • Tan SH, Barton PI (2016) Optimal dynamic allocation of mobile plants to monetize associated or stranded natural gas, part II: dealing with uncertainty. Energy 96:461–467

    Article  Google Scholar 

  • Tan SH, Barton PI (2017) Optimal shale oil and gas investments in the US. Energy 141:398–422

    Article  Google Scholar 

  • U.S. Energy Information Administration (EIA) (2021) U.S. 2021 Annual energy outlook with projects to 2050. US Department of Energy, Washington

    Google Scholar 

  • Weymouth TR (1912) Problems in natural gas engineering. Trans ASME 34:185–234

    Google Scholar 

Download references

Acknowledgements

Financial support from National University of Litoral under Grant CAI+D 2020 50620190100163LI, and CONICET under Grant PIP 11220200103053CO is gratefully acknowledged. Financial support from ExxonMobil Upstream Research Company through the Center of Advanced Process Decision-making at Carnegie Mellon University is also gratefully acknowledged.

Funding

Financial support from University of Litoral and CONICET. Financial support from ExxonMobil Upstream Research Company through the Center of Advanced Process Decision-making at Carnegie Mellon University.

Author information

Authors and Affiliations

Authors

Contributions

AFM: Conceptualization, Methodology, Data Curation, Investigation, Visualization, Software, Formal analysis, Writing—review and editing. DCC: Conceptualization, Methodology, Investigation, Formal analysis, Visualization, Writing—original manuscript, Writing—review and editing, Funding Acquisition. IEG: Conceptualization, Supervision, Validation, Writing—review and editing, Project Administration, Funding Acquisition. OO: Conceptualization, Data Curation, Visualization, Validation, Resources. YS: Conceptualization, Methodology, Validation, Supervision, Resources. TZ: Conceptualization, Methodology, Supervision, Validation. YG: Conceptualization, Methodology, Validation. X-HW: Conceptualization, Methodology, Validation, Resources. KF: Conceptualization, Methodology.

Corresponding author

Correspondence to Diego C. Cafaro.

Ethics declarations

Conflict of interest

The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Ti Zhang: Previously affiliated to ExxonMobil Upstream Research Co, 22777 Springwoods Village Parkway, Spring, TX, 77389, USA.

Supplementary Information

Below is the link to the electronic supplementary material.

Supplementary file1 (DOCX 393 KB)

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Montagna, A.F., Cafaro, D.C., Grossmann, I.E. et al. Surface facility optimization for combined shale oil and gas development strategies. Optim Eng 24, 2321–2355 (2023). https://doi.org/10.1007/s11081-022-09775-8