1 Introduction

The forthcoming generation of cosmic microwave background observatories will target an ambitious set of science goals requiring unprecedented sensitivities. To support this, the detector count will increase by approximately an order of magnitude and focal planes will operate at temperatures \(\sim 100\,\mathrm{mK}\). The scaling up of fabrication of high-performance low-temperature detector wafers requires timely feedback on the yield and initial performance. This justifies the need to rely on test bench with prompt feedback testing capabilities operating at 100 mK [1]. For this purpose, a test cryostat based on a novel miniature dilution refrigerator (MDR) has been developed [2].

Several MDR designs have been reported [3,4,5,6,7,8,9,10]. In condensation pumped MDRs, a small amount of \({^3}\mathrm{He}\) circulates within the cold stage, offering several advantages over conventional systems. Crucially, since they do not need room temperature gas circulation, the smaller-scale pumping lines considerably reduce size and complexity of the overall system. The system operates in a closed cycle, thereby avoiding cold o-rings and external gas handling systems, which require high power consumption and may be prohibitively expensive, mostly due to the required amount of \({^3}\mathrm{He}\). No moving parts are required, with the system operated entirely by heaters. It is possible to fully automate the cycling of each stage in order to provide “push-button” cooldown to below 100 mK.

A design has been developed for such a system that can be easily mounted on existing \({^4}\mathrm{He}-{^3}\mathrm{He}-{^3}\mathrm{He}\) sorption coolers. This is capable of meeting the cooling power requirements for preliminary testing at 100 mK of detector wafers fabricated for the Simons Observatory [11]. The design modifies the existing APEX-SZ [12] cryostat at UC Berkeley which is currently being used for POLARBEAR-2 [13] detector testing. Moreover, the architecture of the system that has been developed is convenient since it could easily be implemented for other low-temperature detector applications requiring comparable cooling powers at \(\sim 100\,\mathrm{mK}\).

2 Detector Test Cryostat Development

The APEX-SZ cryostat is shown in Fig. 1. Coaxial 40 K and 4 K stages are cooled by a pulse tube cryocooler. A three-stage, \({^4}\mathrm{He}-{^3}\mathrm{He}-{^3}\mathrm{He}\) (“He-10”) sorption refrigerator provided by Chase Research Cryogenics (CRC)Footnote 1 cools the focal plane to \(\sim 250\,\mathrm{mK}\), at which stage the detector wafer under test is placed. The CRC10 cooler uses the \(^{4}\mathrm{He}\) stage to precool the first \({^3}\mathrm{He}\) coldhead to 1 K, with a 2 K stage provided by a film breaker. The film breaker prevents the development of \({{^4}}\mathrm{He}\) film due to the thermomechanical effect and is positioned at the top of the evaporator to minimize the heat leak from the 4 K stage. A film breaker of similar operation is described in detail in Ref. [15]. Once the \(^{4}\mathrm{He}\) charge has expired, the first \({^3}\mathrm{He}\) pump is cooled, pumping the condensed \({^3}\mathrm{He}\) in the \({^3}\mathrm{He}\) coldhead down to 350 mK. This stage also provides further precooling and thermal intercept for the second \({^3}\mathrm{He}\) stage which is then pumped down to 250 mK, cooling the detector wafer. In order to provide a 100 mK base temperature, the second \({^3}\mathrm{He}\) stage, or ultracold (UC) stage, is replaced with a MDR, which is then cooled by the first \({^3}\mathrm{He}\) stage, or inter-cooler (IC) stage. This simple design is compatible with the architecture of the CRC10 and is described in the next paragraph.

Fig. 1
figure 1

Cutout schematics of the existing APEX test cryostat at UC Berkeley (adapted from [14]) (Color figure online)

3 Test bed Cryostat Architecture

A dry (cryogen-free) cryostat architecture is used. The test bed cryostat is precooled by a standard two-stage Gifford–McMahon cryocooler (GM). Each stage has an associated radiation shield and a copper plate, providing isothermal surfaces at \(\sim 40\,\mathrm{K}\) and \(\sim 4\,\mathrm{K}\). The type of GM used, Sumitomo RDK-415D,Footnote 2 has a nominal cooling power of 1.5 W at 4 K.

Fig. 2
figure 2

Left: Schematic figure of the \({^4}\mathrm{He}-{^3}\mathrm{He}-{^3}\mathrm{He}\) (CRC10) fridge. Right: Schematic figure of the \({^4}\mathrm{He}-{^3}\mathrm{He}\) (CRC7) fridge and MDR. The ultracooler stage has been replaced with a MDR to reduce the base temperature to 100 mK (Color figure online)

The double-stage \(^{3}\mathrm{He}-^{4}\mathrm{He}\) sorption cooler (CRC7) precools the MDR and is mounted underneath the GM 4 K plate vertically with the coldhead downwards, using five OFHC struts. In order to minimize the turnaround time for detector wafer testing, the precooling stages are cycled automatically by an XML script which controls the various heaters in the system. As such, a wafer may be mounted in the test cryostat, the system is closed and evacuated, and the cryocooler and scripts run overnight to reach 100 mK for testing the following morning.

4 Precooling Stage to 350 mK

In a CRC10 cooler with the UC stage removed, the \({^3}\mathrm{He}\) and \({^4}\mathrm{He}\) charcoal-loaded cryopumps are operated by heaters and gas-gap heat switches. The switches are mounted on top of the unit main plate and are thermally connected to the top of each cryopump by means of a heat strap. A pumping line runs from the cryopumps down to a condenser block, which is connected by thin-walled stainless steel tubes to an evaporator. A system schematic is shown in Fig. 2. The cryopumps are used to pump on the \({^3}\mathrm{He}\) and \({^4}\mathrm{He}\) coaxial pots located in the coldhead. While the heat switches are closed, the pumps reach thermal equilibrium with the 4 K stage. At 4 K, the charcoal adsorbs the helium gas, acting as a very effective pump. Subsequently opening the heat switches and heating the pumps to 40 K cause the charcoal to desorb the helium gas [16] which condenses and collects as liquid in the coldhead. Keeping the \({^3}\mathrm{He}\) pump warm, the \({^4}\mathrm{He}\) pump heater is switched off and the corresponding switch is closed. As a result, the cryopump cools down and pumps on the liquid in the \({^4}\mathrm{He}\) pot, reducing the temperature of the coldhead. Once the \({^4}\mathrm{He}\) is exhausted, the \({^3}\mathrm{He}\) pump heater is switched off and the switch closed, pumping the \({^3}\mathrm{He}\) down to its base temperature \(\sim 310\,\mathrm{mK}\).

Fig. 3
figure 3

Left: Cycle procedure of the cooler. The figure shows the temperature of each component over time. Right: Load curve measured for the IC stage (Color figure online)

An example of a cooling cycle is shown in Fig. 3. The cycle has been repeated several times and showed that the refrigerator maintains a temperature \(\sim 380\,\mathrm{mK}\) for over 12 h, under an artificial load of \(\sim 330\,\upmu \hbox {W}\) provided by a heater mounted to the coldhead. Once \({^3}\mathrm{He}\) is completely exhausted, the evaporator will begin to warm and the system needs to be recycled. It took \(\sim\)3 h to recycle the system and bring it back to its base temperature. One-third of the recycle time was used to allow the GM to recover from the heating of the cryopumps, which ensured an efficient condensation of \({^4}\mathrm{He}\). A more powerful cryocooler may be used to reduce the recycle time.

5 Miniature Dilution Refrigerator

Fig. 4
figure 4

Left: Manufactured parts before assembly. Right: Cutaway 3D CAD rendering and assembled preliminary MDR prototype (Color figure online)

The test of the detector requires an operating temperature of 100 mK for more than 8 h, keeping an heat load higher than 5 µW at 100 mK. A prototype cooler, which is expected to meet the cooling power and hold time requirements, has been manufactured, as shown in Fig. 4 with an illustrative schematic in Fig. 2.

5.1 Design

A condensation pump chamber at the top is mounted to the IC coldhead via a thermal link. A return line connects the bottom of this chamber with the mixing chamber. A second tube runs from the bottom of the mixing chamber up to the still through a heat exchanger assembly. Another tube then runs from the top of the still back to the condensation pump to allow pumping of the \({^3}\mathrm{He}\) gas.

While \(^{3}\mathrm{He}\) flows from the still, cooling at 100 mK is supplied to the detector wafer under test. The cooling power of the dilution process is given by the difference in enthalpy between the helium leaving and entering the chamber. In this temperature regime, the molar enthalpy of the dilute solution and that of the incoming pure \(^{3}\mathrm{He}\) approximate to \(94{T}^{2}\,\mathrm{J}/\mathrm{mol}\) and \(12{T}^{2}\), respectively [17]; hence, the cooling power of the MDR is

$$\begin{aligned} \dot{Q}_\mathrm{MDR} = \dot{n} \left( 94 T^{2}_\mathrm{m} - 12 T^{2}_\mathrm{i} \right) \end{aligned}$$
(1)

where \(\dot{ n }\) is the molar flow rate of \(^{3}\mathrm{He}\), \(T_\mathrm{m}\) is the temperature of the mixing chamber and \(T_\mathrm{i}\) is the temperature of the returning \(^{3}\mathrm{He}\). The maximum cooling power is achieved if a perfect heat exchanger is assumed, such that \(T_\mathrm{i} = T_\mathrm{m}\). Given the heat lift and temperature requirements, Eq. 1 corresponds to a flow rate \(\dot{ n } \sim 6 \upmu \,\mathrm{mol}/\mathrm{s}\). The minimum temperature reached at the mixing chamber is therefore limited by the heat load on the 350 mK stage, the helium circulation rate within the MDR, the heat exchanger efficiency and the Kapitza resistance. The \(^{3}\mathrm{He}\) circulation rate is determined by the pumping rate from the still to the condensation pump. That is, keeping the temperature of the still well above that of the condensation pump improves its efficiency. Applying power to the still raises the still temperature up to a limit set by the capacity of the condensation pump. The heat load on the condensation pump is \(\dot{n}\varDelta H\), where \(\varDelta H\) is the change in enthalpy leaving and entering the pump. After being removed from the still, \(^{3}\mathrm{He}\) cools down from the still temperature to the temperature of the condensation pump, where it is pulled down by gravity as liquid. Therefore, \(\varDelta H\) is given by the difference in enthalpy entering and leaving the still in addition to the latent heat of evaporation, L, which is the dominating term. Hence, the flow rate is

$$\begin{aligned} \dot{ n }\sim \frac{\dot{Q}_\mathrm{S}}{L} \end{aligned}$$
(2)

At a still temperature 700 mK, \(L \sim\) 24 J/mol [17]. Hence, a flow rate of 6  \(\upmu \mathrm{mol}/\mathrm{s}\) corresponds to a still power \(\dot{Q}_\mathrm{S} =144\,\upmu \,\mathrm{W}\) (assuming an ideal heat exchanger). The measured load curve in Fig. 3 shows that this results in a temperature of the condensation pump of \(\sim 360\,\mathrm{mK}\).

However, ideal heat exchanger performance will clearly not be attained in reality due to the contribution of several heat leaks. CuNi tube-in-tube continuous counterflow heat exchangers have been shown to be well suited to DRs with flow rates on the order of a few \(\upmu\)mol/s with 100 mK base temperatures [9]. Several models [9, 18,19,20] estimated the efficiency of the heat exchanger as

$$\begin{aligned} \frac{\dot{Q}}{\dot{n}} = \frac{(\gamma _D - \gamma _C) \left[ \gamma _D (f - 1) - \gamma _C\right] }{\gamma _D (f - 1) - \gamma _C (f + 1)} \end{aligned}$$
(3)

where the enthalpy coefficients of the diluted and the concentrated phase of the \({^3}\mathrm{He}/{^4}\mathrm{He}\) mixture are \(\gamma _D = 107\,\mathrm{J}/\mathrm{K}^2/\mathrm{mol}\) and \(\gamma _C =23\,\mathrm{J}/\mathrm{K}^2/\mathrm{mol}\) [9], respectively, and f is a dimensionless factor given by

$$\begin{aligned} f = \mathrm{exp} \left( \frac{A / a_k}{\dot{n} \gamma _{D} \gamma _{C}} \left[ (\gamma _{D} - \gamma _{C}) T^2_m - \frac{2 \dot{Q}}{\dot{n}} \right] \right) \end{aligned}$$
(4)

where A is the surface area of the heat exchanger inner tube, \(a_K\) is the Kapitza resistivity and \(T_m\) is the MDR lowest achievable temperature. The area \(A >\,40\,\mathrm{cm}^2\) has been chosen to suit the cooling power requirements, in order to minimize the effect of Kapitza resistance. Furthermore, the resistivity is the same on the concentrated side and the diluted side [20]; therefore, \(a_K\) is taken to be \(0.02\,\mathrm{m}^2\mathrm{K}{^4}/\mathrm{W}\), twice the value of \(a_K\) between diluted \({^3}\mathrm{He}\) and CuNi [7].

5.2 Preliminary Testing and Discussion

The mixing chamber requires precooling to \(<500\, \mathrm{mK}\) in order to induce phase separation and operate the MDR. The dilution unit has been tested in this configuration. However, several improvements to the preliminary design were necessary to activate dilution. In order to precool the mixing chamber to 4 K and then to 500 mK while cycling the IC stage, an active \({^3}\mathrm{He}\) gas-gap switch has been introduced to couple the IC head and the mixing chamber. Since the density ratio between \({^4}\mathrm{He}\) and \({^3}\mathrm{He}\) is \(\rho _4 / \rho _3 =1.7\), the phase separation must be such that the still side of the circuit contains dilute mixture and the condenser side contains concentrate, while the MDR is in operation. To this end, there must be a difference in the column height in the equilibrium condition. Therefore, the original design of the MDR has been modified to include a higher mixing chamber with a total volume \(7\,\mathrm{cm}{^3}\). In order to maintain a fixed 180 mm total height of the MDR unit, the HEX has been further compressed and aligned with the condenser. The still of volume \(1.5\,\mathrm{cm}{^3}\) has been positioned approximately halfway between the mixing chamber and the condenser.

Taking into account the HEX, the total volume of the MDR amounts to \(10\,\mathrm{cm}{^3}\). An external gas bottle connected to the MDR circuit has been charged with 7 L (STP) with a mixture of \({^3}\mathrm{He}\) (4 L STP) and \({^4}\mathrm{He}\) (3 L STP).

Fig. 5
figure 5

Left: MDR dilution runs, showing the temperature in Kelvin of the MDR stages (still and mixing chamber) over time. Right: MDR mixing chamber lowest achievable temperature as a function of the circulation rate for different residual heat leaks (Color figure online)

In order to fully charge the MDR with the overall amount of mixture, the CRC7 was cycled with the precooling switch closed. The precooling unit has been cycled multiple times, and the active switch successfully precooled the MC to 400 mK at which point phase separation occurred, as shown in Fig. 5.

Nonetheless, while trying to artificially load the still, the temperature would not reach the 700 mK expected from a loading \(>144\,\upmu \mathrm{W}\) to allow an efficient performance of the dilutor. In fact, not all of the mixture has been successfully introduced in the dilution unit due to a slow transfer rate, leaving the still and the MC partially empty. Most of the mixture was drawn into the MDR, while the MC was precooled to the CRC7 base temperature, which shows that the mixture was not condensing well at 4 K. Therefore, a condenser at the connection between the MDR and the 4 K stage will be added. Testing of the improved prototype has not yet been completed; however, results with the former prototype demonstrated that the MDR is mechanically and structurally functional. Furthermore, Eq. 4 has been used to estimate \(T_m\) for different heat leaks in Fig. 5, corresponding to the contributions from viscous heating and lateral heat conduction in the heat exchanger. Given the above considerations and the measured load curve in Fig. 3, the system will comfortably support a circulation rate of \(5< \dot{n} < 11\,\upmu \mathrm{mol}\cdot \mathrm{s}^{-1}\), affording a maximum heat load of 10 µW at the mixing chamber (100 mK).

6 Conclusion

A sorption-cooled miniature dilution refrigerator has been developed for a test cryostat to provide rapid cooldown and support preliminary tests of detectors operating at 100 mK. The design, operation and thermodynamic analysis have been described. The proposed design meets the criteria for several low-temperature detector experiments and will offer a considerable advantage over existing three-stage sorption coolers which operate at 250 mK. The sorption cooler in the precooling stage has been operated extensively, and its performance has been reported. A prototype MDR has been manufactured and tested, showing a successful phase separation at the mixing chamber; further experimental tests are currently taking place and the authors look forward to reporting full experimental results in due course.