Abstract
The aim of the paper is to present the way of research project planning. The solution is based on chosen agile algorithm - SCRUM with using type-2 fuzzy numbers. The case study of real research project was taken into account to show an exemplary usage of suggested solution.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Davis, K.: Different stakeholder groups and their perceptions of project success. Int. J. Project Manag. 32(2), 189–201 (2014)
Garibaldi, J.M., Anderson, D.T., Wagner, C., Miller, S., Havens, T.C.: From interval-valued data to general type-2 fuzzy sets. IEEE Trans. Fuzzy Syst. 23(2), 248–269 (2015)
Goetschel Jr., R., Voxman, W.: Topological properties of fuzzy numbers. Fuzzy Sets Syst. 10(1–3), 87–99 (1983)
Goetschel Jr., R., Voxman, W.: Elementary fuzzy calculus. Fuzzy Sets Syst. 18(1), 31–43 (1986)
Gong, Y., Hu, N., Zhang, J., Liu, G., Deng, J.: Multi-attribute group decision making method based on geometric Bonferroni mean operator of trapezoidal interval type-2 fuzzy numbers. Comput. Ind. Eng. 81, 167–176 (2015)
Han, Z., Wang, J., Zhang, H., Luo, X.: Group multi-criteria decision making method with triangular type-2 fuzzy numbers. Int. J. Fuzzy Syst. 18(4), 673–684 (2016)
Holmberg, O.: Six Steps for Implementing Agile across the Organization (2013). https://www.agileconnection.com/article/six-steps-implementing-agile-across-organization?page=0%2C. Accessed 25 May 2017
Ilieva, G.: Group decision analysis with interval type-2 fuzzy numbers. Cybernet. Inf. Technol. 17(1), 31–44 (2017)
Johnson, P.: The importance of academic research (2012). http://www.news.uwa.edu.au/201203194542/vice-chancellor/importance-academic-research. Accessed 1 May 2017
Klaus-Rosińska, A., Kuchta, D.: The success and failure of research projects according to the opinions of various stakeholders. In: Gómez Chova, L., López Martínez, A., Candel Torres, I. (eds.) 9th International Conference of Education, Research and Innovation ICERI2016 Conference Proceedings, IATED Academy, pp. 1947–1956 (2016)
Klaus-Rosińska, A., Skowron, D.: Zastosowanie metodyk zwinnych do zarządzania projektami badawczymi szkół wyższych. In: Nauka i praktyka w zarządzaniu projektami: Project Management Excellence Forum, Tempo, Wrocław (2012)
Montony, A.M.: 3 key steps to build an agile team (2014). https://www.cprime.com/2014/04/3-key-steps-to-building-an-agile-team/. Accessed 25 May 2017
Runkler, T., Coupland, S., John, R.: Interval type-2 fuzzy decision making. Int. J. Approx. Reason. 80, 217–224 (2017)
Spałek, S., Zdonek, D.: Zwinne podejście projektowe a projekty badawcze. Zeszyty Naukowe Politechniki Śląskiej, Seria: Organizacja i Zarządzanie 64(1894), 242–249 (2013)
Wei, C.-C.: R&D Management Body of Knowledge, pp. 11–23. American Project Management Institute, Newtown Township (2012)
Weisbach, R.: How I led 6 R&D groups through an agile transition. https://techbeacon.com/how-i-led-6-rd-groups-through-agile-transition. Accessed 1 June 2017
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Klaus-Rosińska, A., Schneider, J., Bulla, V. (2019). Research Project Planning Based on SCRUM Framework and Type-2 Fuzzy Numbers. In: Wilimowska, Z., Borzemski, L., Świątek, J. (eds) Information Systems Architecture and Technology: Proceedings of 39th International Conference on Information Systems Architecture and Technology – ISAT 2018. ISAT 2018. Advances in Intelligent Systems and Computing, vol 854. Springer, Cham. https://doi.org/10.1007/978-3-319-99993-7_34
Download citation
DOI: https://doi.org/10.1007/978-3-319-99993-7_34
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-99992-0
Online ISBN: 978-3-319-99993-7
eBook Packages: Intelligent Technologies and RoboticsIntelligent Technologies and Robotics (R0)