Abstract

Most commercial project management software packages include planning methods to devise schedules for resource-constrained projects. As it is proprietary information of the software vendors which planning methods are implemented, the question arises how the software packages differ in quality with respect to their resource-allocation capabilities. We experimentally evaluate the resource-allocation capabilities of eight recent software packages by using 1,560 instances with 30, 60, and 120 activities of the well-known PSPLIB library. In some of the analyzed packages, the user may influence the resource allocation by means of multi-level priority rules, whereas in other packages, only few options can be chosen. We study the impact of various complexity parameters and priority rules on the project duration obtained by the software packages. The results indicate that the resource-allocation capabilities of these packages differ significantly. In general, the relative gap between the packages gets larger with increasing resource scarcity and with increasing number of activities. Moreover, the selection of the priority rule has a considerable impact on the project duration. Surprisingly, when selecting a priority rule in the packages where it is possible, both the mean and the variance of the project duration are in general worse than for the packages which do not offer the selection of a priority rule.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Farid F, Manoharan S (1996) Comparative analysis of resource-allocation capabilities of project management software packages. Proj Manag J 27:35–44

    Google Scholar 

  • Herroelen W (2005) Project scheduling–theory and practice. Prod Oper Manag 14:413–432

    Article  Google Scholar 

  • Johnson R (1992) Resource constrained scheduling capabilities of commercial project management software. Proj Manag J 22:39–43

    Google Scholar 

  • Kastor A, Sirakoulis K (2009) The effectiveness of resource levelling tools for resource constraint project scheduling problem. Int J Proj Manag 27:493–500

    Article  Google Scholar 

  • Khattab M, Søyland K (1996) Limited resource-allocation in construction projects. Comput Ind Eng 31:229–232

    Article  Google Scholar 

  • Kolisch R (1999) Resource allocation capabilities of commercial project management software packages. Interfaces 29:19–31

    Article  Google Scholar 

  • Lawler E (1976) Combinatorial optimization: networks and Matroids. Holt, Rinehard, and Winston, New York

    Google Scholar 

  • Liberatore M, Pollack-Johnson B (2003) Factors influencing the usage and selection of project management software. IEEE Trans Eng Manag 50:164–174

    Article  Google Scholar 

  • Lova A, Tormos P (2001) Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Ann Oper Res 102:263–286

    Article  Google Scholar 

  • Maroto C, Tormos P (1994) Project management: an evaluation of software quality. Int Trans Oper Res 1:209–221

    Article  Google Scholar 

  • Mellentien C, Trautmann N (2001) Resource allocation with project management software. OR Spectr 23:383–394

    Article  Google Scholar 

  • Trautmann N, Baumann P (2009) Resource-allocation capabilities of commercial project management software: an experimental analysis. In: Kacem I (ed) Proceedings of the 39th international conference on computers & industrial engineering, Troyes, pp 1155–1160

    Google Scholar 

  • White D, Fortune J (2002) Current practice in project management–anempirical study. Int J Proj Manag 20:1–11

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Philipp Baumann .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Baumann, P., Trautmann, N. (2015). Resource-Constrained Project Scheduling with Project Management Information Systems. In: Schwindt, C., Zimmermann, J. (eds) Handbook on Project Management and Scheduling Vol. 2. International Handbooks on Information Systems. Springer, Cham. https://doi.org/10.1007/978-3-319-05915-0_32

Download citation

Publish with us

Policies and ethics