Skip to main content
Log in

Single machine scheduling problem with multiple due windows assignment in a group technology

  • Original Research
  • Published:
Journal of Applied Mathematics and Computing Aims and scope Submit manuscript

Abstract

We consider group scheduling problem on a single machine with multiple due windows assignment. Jobs are divided into groups in advance according to their processing similarities, and all jobs of the same group are required to be processed contiguously on the machine in order to achieve production efficiency and save time/money resource. A sequence-independent setup time precedes the processing of each group. The goal is to determine the optimal sequence for both groups and jobs, together with an optimal combination of the due windows assignment strategy so as to minimize the total of earliness, tardiness and due windows related costs. We give an \(O(n\log n)\) time algorithm for the problem.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Chand, S., Chhajed, D.: A single machine model for determination of optimal due dates and sequence. Oper. Res. 40, 596–602 (1992)

    Article  MATH  MathSciNet  Google Scholar 

  2. Chen, D.W., Li, S., Tang, G.C.: Single machine scheduling with common due date assignment in a group technology environment. Math. Comput. Model. 25, 81–90 (1997)

    Article  MATH  MathSciNet  Google Scholar 

  3. Chen, K., Ji, M., Ge, J.: A note on scheduling a maintenance activity and due-window assignment based on common flow allowance. Int. J. Prod. Econ. 145, 645–646 (2013)

    Article  Google Scholar 

  4. Cheng, T.C.E., Yang, S.J., Yang, D.L.: Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. Int. J. Prod. Econ. 135, 154–161 (2012)

    Article  Google Scholar 

  5. Conway, R.W., Maxwell, W.L., Miller, L.W.: Theory of Scheduling. Reading: Addison-Wesley, Boston (1967)

    MATH  Google Scholar 

  6. Fan, Y.P., Zhao, C.L.: Single machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity consideration. J. Appl. Math. Comput. (2013). doi:10.1007/s12190-013-0736-3

    Google Scholar 

  7. Ham, I., Hitomi, K., Yoshida, T.: Group Technology: Applications to Production Management. Kluwer-Nijhoff, Boston (1985)

    Book  Google Scholar 

  8. Hardy, G.H., Littlewood, J.E., Polya, G.: Inequalities. Cambridge University Press, London (1967)

    Google Scholar 

  9. Janiak, A., Janiak, W.A., Marek, M.: Single processor scheduling problems with various models of a due window assignment. Bull. Pol. Acad. Sci. 57, 95–101 (2009)

    Google Scholar 

  10. Ji, M., Chen, K., Ge, J.J., Cheng, T.C.E.: Group scheduling and job-dependent due window assignment based on a common flow allowance. Comput. Ind. Eng. 68, 35–41 (2014)

    Article  Google Scholar 

  11. Ji, M., Ge, J., Chen, K., Cheng, T.C.E.: Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activity. Comput. Ind. Eng. 66, 952–961 (2013)

    Article  Google Scholar 

  12. Kuo, W.H., Yang, D.L.: A note on due-date assignment and single-machine scheduling with deteriorating jobs. J. Oper. Res. Soc. 59, 857–859 (2008)

    Article  MATH  Google Scholar 

  13. Li, S.S., Ng, C.T., Yuan, J.J.: Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine. Int. J. Prod. Econ. 131, 747–751 (2011)

    Article  Google Scholar 

  14. Li, S.S., Ng, C.T., Yuan, J.J.: Group scheduling and due date assignment on a single machine. Int. J. Prod. Econ. 130, 230–235 (2011)

    Article  Google Scholar 

  15. Low, C.Y., Lin, W.Y.: Single machine group scheduling with learning effects and past-sequence-dependent setup times. Int. J. Syst. Sci. 43, 1–8 (2012)

    Article  MATH  MathSciNet  Google Scholar 

  16. Mor, B., Mosheiov, G.: Scheduling a maintenance activity and due-window assignment based on common flow allowance. Int. J. Prod. Econ. 135, 222–230 (2012)

    Article  Google Scholar 

  17. Ng, C.T., Cheng, T.C.E., Janiak, A., Kovalyov, M.Y.: Group scheduling with controllable setup and processing times: minimizing total weighted completion time. Ann. Oper. Res. 133, 163–174 (2005)

    Article  MATH  MathSciNet  Google Scholar 

  18. Shabtay, D., Itskovich, Y., Yedidsion, L., Oron, D.: Optimal due date assignment and resource allocation in a group technology scheduling environment. Comput. Oper. Res. 37, 2218–2228 (2010)

    Article  MATH  MathSciNet  Google Scholar 

  19. Sidney, J.: Optimal single-machine scheduling with earliness and tardiness penalties. Oper. Res. 25, 62–69 (1977)

    Article  MATH  MathSciNet  Google Scholar 

  20. Wang, J.B., Guo, A.X., Shan, F., Jiang, B., Wang, L.Y.: Single machine group scheduling under decreasing linear deterioration. J. Appl. Math. Comput. 24, 283–293 (2007)

    Article  MATH  MathSciNet  Google Scholar 

  21. Wang, J.B., Huang, X., Wu, Y.B., Ji, P.: Group scheduling with independent setup times, ready times, and deteriorating job processing times. Int. J. Adv. Manuf. Technol. 60, 643–649 (2012)

    Article  Google Scholar 

  22. Wang, J.-B., Wang, C.: Single-machine due-window assignment problem with learning effect and deteriorating jobs. Appl. Math. Model. 35, 4017–4022 (2011)

    Article  MATH  MathSciNet  Google Scholar 

  23. Wang, J.B., Wang, M.Z.: Single machine multiple common due dates scheduling with learning effects. Comput. Math. Appl. 60, 2998–3002 (2010)

    Article  MATH  MathSciNet  Google Scholar 

  24. Xu, Y.T., Zhang, Y., Huang, X.: Single-machine ready times scheduling with group technology and proportional linear deterioration. Appl. Math. Model. 38, 384–391 (2014)

    Article  MathSciNet  Google Scholar 

  25. Yang, D.L., Lai, C.J., Yang, S.J.: Scheduling problems with multiple due windows assignment and controllable processing times on a single machine. Int. J. Prod. Econ. 150, 96–103 (2014)

    Article  Google Scholar 

  26. Yang, S.J.: Group scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machine. Appl. Math. Model. 35, 4008–4016 (2011)

    Article  MATH  MathSciNet  Google Scholar 

  27. Yang, S.J., Hsu, C.J., Yang, D.L.: Single-machine scheduling with due-date assignment and aging effect under a deteriorating maintenance activity consideration. Int. J. Inf. Manag. Sci. 21, 177–195 (2010)

    MATH  MathSciNet  Google Scholar 

  28. Yang, S.J., Lee, H.T., Guo, J.Y.: Multiple common due dates assignment and scheduling problems with resource allocation and general position-dependent deterioration effect. Int. J. Adv. Manuf. Technol. 67, 181–188 (2013)

    Article  Google Scholar 

  29. Yang, S.J., Yang, D.L.: Single-machine scheduling simultaneous with position-based and sum-of-processing-times-based learning considerations under group technology assumption. Appl. Math. Model. 35, 2068–2074 (2011)

    Article  MATH  MathSciNet  Google Scholar 

  30. Yin, Y., Cheng, T.C.E., Hsu, C.J., Wu, C.C.: Single-machine batch delivery scheduling with an assignable common due window. Omega. 41, 216–225 (2013)

    Article  Google Scholar 

  31. Yin, Y., Cheng, T.C.E., Wu, C.C., Cheng, R.: Single-machine due window assignment and scheduling with a common allowance and controllable job processing time. J. Oper. Res. Soc. 65, 1–13 (2014)

    Article  Google Scholar 

  32. Zhang, X.G.: Single-machine group scheduling problems with the sum-of-processing- time based on learning effect. Oper. Res. Trans. 17, 98–105 (2013)

    MATH  MathSciNet  Google Scholar 

  33. Zhao, C.L., Yin, Y.Q., Cheng, T.C.E., Wu, C.C.: Single-machine scheduling and due date assignment with rejection and position-dependent processing times. J. Ind. Manag. Optim. 10, 691–700 (2014)

    Article  MATH  MathSciNet  Google Scholar 

  34. Zhu, Z.G., Sun, L.Y., Chu, F., Liu, M.: Single-machine group scheduling with resource allocation and learning effect. Comput. Ind. Eng. 60, 148–157 (2011)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Wei-Xuan Li.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Li, WX., Zhao, CL. Single machine scheduling problem with multiple due windows assignment in a group technology. J. Appl. Math. Comput. 48, 477–494 (2015). https://doi.org/10.1007/s12190-014-0814-1

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12190-014-0814-1

Keywords

Mathematics Subject Classification

Navigation