Resource Buffers in Construction Projects

  • Conference paper
  • First Online:
Recent Trends in Civil Engineering

Part of the book series: Lecture Notes in Civil Engineering ((LNCE,volume 105))

Abstract

Critical Chain Project Management (CCPM) is created on techniques and procedures taken from the Theory of Constraints (TOC). CCPM was presented in late 90s (1997) in a book named Critical Chain from several studies by Standish Group and others for customary project management methods, only half of the projects normally finish on time, projects generally take twice the duration originally planned, twice of the original planned cost, around 70% of projects fall short of their planned scope, and round about 30% of the projects are shut down in midway. CCPM can be used to avoid these customary statistics. Usually, CCPM case studies report greater than 95% on-time and on-budget completion when CCPM is applied in the approved manner. Initially, the CCPM guidelines and prescriptions and discovers its differences with customary project scheduling methods like Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM). Then the Critical Chain Project Management solution has been outlined, which covers all the proposed steps—the elements of the Critical Chain Project Management solution. Thereafter, the methodology used for data collection and analysis has been explained. Further, it explains the application of CCPM in a Transmission Line Project undertaken by Larsen and Toubro Power Transmission and Distribution. Further, the results of the analysis and discussions about the same have been written.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Deming WE (1982) Out of the crisis. MIT

    Google Scholar 

  2. Goldratt E (1997) Critical chain. North River Press, Massachusetts

    Google Scholar 

  3. Herroelen W, Leus R (2001) On the merits and pitfalls of critical chain scheduling. J Oper Manag 19(5):559–577

    Article  Google Scholar 

  4. Leach LP (2005) Lean project management: eight principles for success. Idaho, Advanced Projects, Inc., Boise, Idaho

    Google Scholar 

  5. Lechler TG, Ronen B, Stohr EA (2005) Critical chain: a new project management paradigm or old wine in new bottles? Eng Manag J 17(4):45–58

    Article  Google Scholar 

  6. Parkinson CN, Osborn RC (1957) Parkinson’s law and other studies in administration. Houghton Mifflin, Boston

    Google Scholar 

  7. Cohen O, CCPM—The TOC solution for improving the management of single projects and the use of the “U” shape for structuring TOC knowledge and developing TOC logistical applications

    Google Scholar 

  8. Masterson P (2005) The Advantages and Disadvantages of Critical Chain Project Management (CCPM) versus Traditional Critical Path (CPM) based project management

    Google Scholar 

  9. Sciforma Corporation (2004) Critical chain concepts

    Google Scholar 

  10. Simpson III WP, Lynch W (1999) Critical success factors in critical chain project management. In: Proceedings of the 30th annual project management institute 1999 seminars & symposium, Philadelphia

    Google Scholar 

  11. Leach LP (2000) Critical chain project management. Library of Congress Cataloging-in-Publication Data. ISBN 1-58053-074-5

    Google Scholar 

  12. Dilmaghani F (2008) Critical Chain Project Management (CCPM) at Bosch Security Systems (CCTV) Eindhoven. A Survey to explore improvement opportunities in the scheduling and monitoring of product development projects

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Bibhuti Bhusan Das .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2021 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Hegde, A.L., Jain, A., Das, B.B. (2021). Resource Buffers in Construction Projects. In: Das, B.B., Nanukuttan, S.V., Patnaik, A.K., Panandikar, N.S. (eds) Recent Trends in Civil Engineering. Lecture Notes in Civil Engineering, vol 105. Springer, Singapore. https://doi.org/10.1007/978-981-15-8293-6_37

Download citation

  • DOI: https://doi.org/10.1007/978-981-15-8293-6_37

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-15-8292-9

  • Online ISBN: 978-981-15-8293-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics