Skip to main content

Wind Related Codes for the Honshu-Shikoku Project

  • Chapter
Wind Resistant Design of Bridges in Japan

Abstract

As already mentioned in Chap. 1, the preparatory investigation, design and construction of the Honshu-Shikoku Bridges (HSB) had 40 years of history as shown in Table 3.1, and its construction finally came to the end by completing the Akashi-Kaikyo Bridge in 1998 and the Tatara Bridge as well as Kurushima-Kaikyo Bridges in 1999.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yozo Fujino .

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer

About this chapter

Cite this chapter

Fujino, Y., Kimura, K., Tanaka, H. (2012). Wind Related Codes for the Honshu-Shikoku Project. In: Wind Resistant Design of Bridges in Japan. Springer, Tokyo. https://doi.org/10.1007/978-4-431-54046-5_3

Download citation

  • DOI: https://doi.org/10.1007/978-4-431-54046-5_3

  • Publisher Name: Springer, Tokyo

  • Print ISBN: 978-4-431-54045-8

  • Online ISBN: 978-4-431-54046-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics