Abstract
Installation method of Fiber Optical Cable (FOC) used to telecommunication system is mostly laid in the same trench with the pipeline with regard to oil and gas pipeline project in China. However, the cable will suffer the effect of the external stress due to thaw collapse effect of oil and gas pipelines on permafrost strata in permafrost zone. Based on force analysis of the cable and comparison with the HDPE silicon core tube in the state of thaw collapse effect, it is shown that the resistance of HDPE silicon core tube to thaw collapse effect is greater than optical cable commonly used in engineering. The result of the research shows that the operation of the FOC will more safety and reliable if the cable is to be installed in HDPE tube in the same trench with the pipeline in permafrost region. Therefore, this method is recommended to install FOC in permafrost region.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Zhang X, Feng SG, Chen PC (2013) Thawing settlement risk of running pipeline in permafrost regions. Oil Gas Storage Transp, 365–369
Wu XY (2011) Technical application of laying in one ditch for fiber cable and oil or gas pipeline. Oil Gas Storage Transp, 547–549
Wang G, Gao JZ, Li GC et al (2012) Design and construction code of optical fiber cable (high-density polyethylene silicore duct) laying in the same trench with oil(gas) pipeline. SY/T 4108-2012, National Energy Administration, 3–4
Wei X (2015) Study of technical key point of fiber optical cable construction in optical fiber communication engineering. Inf Commun, 178–179
Wang Z, Shibing, Shuai M et al (2009) Stranded loose tube optical fiber cables for outdoor application for telecommunication. YD/T 901-2009, Ministry of industry and information technology of the People’s Republic of China, 14–16
Wang HJ (2014) The common fault and maintenance of communication fiber optical cable line. China New Telecommun, 17
Tan JD, Zheng J, Ma YB (2012) Displacement monitoring of Mohe-Daqing oil pipeline in the permafrost frozen area. Oil Gas Storage Transp, 737–739
Zhao L (2012) Analysis of tension load in overhead transmission line. Electr Power Constr, 42–45
Zhang J, Qin ZQ (2013) Calculation and analysis of ice non-balance tension in overhead transmission line. Mech Electr Inf, 45–47
Peng XL, Zhang H, Li YL (2014) Simulation study on influencing factors of macro bending loss of optical fiber. Laser Infrared, 1132–1136
Gao P (2010) Construction technical study of communication buried optical cable in plateau permafrost area of QingHai-Tibet railway. Railway Signal Commun, March, 52–53
Zhang T (2005) Study of influence on optical cable from perennial frozen soil. Railway Signal Commun, 49–50
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Liu, G. (2019). Study of the Method Laying Fiber Optic Cable in the Same Trench with Pipeline in Permafrost Region. In: Shemwell, S., Lin, J. (eds) Proceedings of the International Petroleum and Petrochemical Technology Conference 2018. IPPTC 2018. Springer, Singapore. https://doi.org/10.1007/978-981-13-2173-3_14
Download citation
DOI: https://doi.org/10.1007/978-981-13-2173-3_14
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-13-2172-6
Online ISBN: 978-981-13-2173-3
eBook Packages: EnergyEnergy (R0)