Skip to main content

Performance Analysis and Optimization of Fang Jiashan DCS Level 2 System

  • Conference paper
  • First Online:
Proceedings of The 20th Pacific Basin Nuclear Conference (PBNC 2016)

Included in the following conference series:

  • 823 Accesses

Abstract

This paper is based on the experience of Fang Jiashan DCS level 2 system optimization project. Level 2 system is the essential part in the whole DCS system as it is responsible for monitoring and controlling the plant operation. Its performance affects the stability and economic efficiency of the plant operation directly. This paper briefly describes the architecture of Fang Jiashan Nuclear Power DCS level 2 system and the way of signal exchanging among the different levels of DCS. It also describes how the signal scanning and processing mechanism affect level 2 system performance, and demonstrates in detail why there were signals delayed during the major test-like disconnection from grid test at the 100 % power level. This paper also proposes optimization methods to enhance the performance for the level 2 system in multiple aspects including hardware upgrade, signal scan rate optimization, internal calculation process mechanism improvement, system task scheduling mechanism improvement and system architecture optimization. The methods for performance optimization discussed in this paper have been applied to DCS level 2 system updating project of Fang Jiashan NPP and Fuqing NPP 1&2 successfully, which have been proved feasible and effective, the schemes are valuable for new plant DCS design and construction or for old plant DCS refurbishment in certain aspects.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Atos world grid, Fang Jiashan KIC hardware and software design, 2011:48–53

    Google Scholar 

  2. Tan ping, Detail design of the Fang Jiashan optimization project. CNNC Nuclear Power Operations Management Co. Ltd. Zhejiang, China, 2015

    Google Scholar 

  3. Atos world grid, DCS V5 Performance Tests Synthesis. 2014.9:18–20

    Google Scholar 

  4. Atos world grid, DCS V6 Performance Tests Synthesis. 2015.10:28–31

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ping Tan .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer Science+Business Media Singapore

About this paper

Cite this paper

Tan, P. (2017). Performance Analysis and Optimization of Fang Jiashan DCS Level 2 System. In: Jiang, H. (eds) Proceedings of The 20th Pacific Basin Nuclear Conference. PBNC 2016. Springer, Singapore. https://doi.org/10.1007/978-981-10-2317-0_16

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-2317-0_16

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-2316-3

  • Online ISBN: 978-981-10-2317-0

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics