Keywords

1 Introduction

A large amount of radioactive materials was released in the environment as a result of the TEPCO Fukushima Daiichi Nuclear Power Plant (NPP) accident caused by the Great East Japan Earthquake that occurred on March 11, 2011. The spread of the radioactive contamination had become a concern just after the accident. Mt. Fuji, which is 3,776 m above sea level and the highest mountain in Japan, is located approximately 300 km southwest of TEPCO’s Fukushima Daiichi NPP. Because an environmental radiation monitoring level in Shizuoka City, which is approximately 50 km southwest from Mt. Fuji, rose on March 15 and 21–22, 2011, it is estimated that the radioactive plume released by TEPCO’s Fukushima Daiichi Nuclear Power Station arrived around Mt. Fuji at those times [1]. Figure 6.1 shows the locations of TEPCO’s Fukushima Daiichi Nuclear Station, Mt. Fuji, and Shizuoka City.

Fig. 6.1
figure 1

Location of TEPCO’s Fukushima Daiichi Nuclear Plant, Mt. Fuji, and Shizuoka City

Climbing Mt. Fuji is a very popular leisure activity and its trails are crowded with many climbers every summer. Thus, to reveal the radioactive contamination level of Mt. Fuji’s trails before the summer season began, we performed the radiation survey along two main Mt. Fuji trails.

2 Measurements

The measurements were carried out from 04:30 to 18:30 on July 9, 2011. We climbed the Yoshida trail from the Fuji-Subaru Line fifth station 2,300 m above sea level to the top of Yoshida-Subashiri 3,720 m above sea level and descended Subashiri trail from the Yoshida-Subashiri top to the Subashiri-guchi new fifth station at 2,000 m above sea level on foot while measuring gamma-ray dose rate and pulse height spectra. A trace of our measuring trip at Mt. Fuji is shown in Fig. 6.2.

Fig. 6.2
figure 2

A trace of our measuring trip at Mt. Fuji on July 9, 2011. We started from Fuji-Subaru line fifth station at 04:30 and reached Subashiri-guchi new fifth station at 18:30

The dose rate was measured using a NaI(Tl) scintillation survey meter (Aloka, TCS-172B; Hitachi Aloka Medical, Tokyo, Japan). The authors at times stopped moving and read the indicated values of the survey meter at a height of 1 m from the ground on the trail. A NaI(Tl) scintillation spectrometer (EMF211; EMF Japan, Osaka, Japan) with a tablet-size personal computer and an external power supply battery was used for gamma-ray pulse height spectrum measurements. The authors performed the 1-min repetition measurement, putting the spectrometer in a bag pack through the measuring trip. One scene of the measuring trip taken around the Yoshida trail sixth station 2,400 m above sea level is shown in Fig. 6.3.

Fig. 6.3
figure 3

Two of the authors on the measuring trip around Yoshida trail sixth station. The probe of the NaI(Tl) survey meter was set to an altitude of 1 m from the ground for dose rate measurements

3 Results and Discussions

The measured dose rates ranged from 0.03 to 0.05 μSv/h throughout our measuring trip. As a result, it was found that the dose rates of the Yoshida trail and the Subashiri trail in Mt. Fuji were at nominal background levels. These two trails are located on the northeastern side of Mt. Fuji. There are two other major trails in Mt. Fuji. One is Fujinomiya trail, located on the south side of Mt. Fuji, and the other is Gotemba trail, on the southeastern side of Mt. Fuji. Arrival direction to Mt. Fuji and the horizontal expanse of the radioactive plume released from TEPCO’s Fukushima Daiichi NPP have not been investigated yet. However, we assume that the dose rates of the Fujinomiya trail and Gotemba trail were in the same range (nominal background level) as the Yoshida and Subashiri trails because a difference in the degree of radioactive contamination is not seen around the Mt. Fuji area from the result of the airborne monitoring survey at an altitude less than 2,000 m by the Ministry of Education, Culture, Sports, Science and Technology (MEXT) [2].

Figure 6.4a–h shows the gamma-ray pulse height spectra given as the integration of the ten consecutive measurements (corresponding to 10-min collection time) measured at (a) the Fuji-Subaru Line fifth station, 2,300 m above sea level, (b) the Yoshida trail sixth station, 2,400 m above sea level, (c) the middle of the Yoshida trail, 2,500 m above sea level, (d) the middle of the Yoshida trail, 3,000 m above sea level, (e) the middle of the Yoshida trail, 3,400 m above sea level, (f) the Yoshida-Subashiri top, 3,720 m above sea level, (g) the middle of the Subashiri trail, 2,500 m above sea level, and (h) the Subashiri new fifth station at 2,020 m above sea level, respectively. The spectra measured at less than 2,500 m above sea level showed the peaks of two radioactive cesium isotopes (134Cs and 137Cs) and natural radioactive nuclides. The peaks of 134Cs and 137Cs could not be identified in spectra that were measured more than 2,500 m above sea level.

Fig. 6.4
figure 4figure 4figure 4

ah Gamma-ray pulse height spectra measured using a NaI(Tl) scintillation spectrometer on Mt. Fuji’s trails

It was confirmed that a radioactive plume released from TEPCO’s Fukushima Daiichi NPP had arrived at least 2,500 m above sea level at Mt. Fuji. The ground surface is often above rain clouds on a high mountain such as Mt. Fuji. Therefore, we comment that the radioactive materials might hardly be deposited in the soil because it was dry, although the radioactive plume arrived at places more than 2,500 m above sea level. The airborne monitoring survey by MEXT has not provided data in mountain areas greater than 2,000 m in altitude because of difficulty in making flights. Therefore, it is hoped that our data become valuable information for the evaluation of the vertical distribution of the radioactive plume released by the Fukushima nuclear accident.

4 Conclusion

We performed a radiation survey along two main Mt. Fuji trails on July 9, 2011. The measured dose rates were within the range from 0.03 to 0.05 μSv/h throughout our measuring trip, which were nominal background levels. From the results of these gamma-ray pulse height spectrum measurements, it was confirmed that a radioactive plume released from TEPCO’s Fukushima Daiichi NPP had arrived at least 2,500 m above sea level at Mt. Fuji.