Skip to main content

Systematics of Changeability

  • Chapter
  • First Online:
Handbook Factory Planning and Design

Abstract

Our discussion up until now has sufficiently clarified the need for production enterprises to adjust to the plethora of external and internal challenges that arise depending on the situation. Production enterprises have to adjust to the plethora of external and internal challenges by changeability. Changeability is defined here as an umbrella term for five classes of adaptability, namely: change-over ability, flexibility, reconfigurability, transformability and agility. In order to enable the factory objects to change, changeability enablers are necessary which are: universality, mobility, scalability, modularity and compatibility. In this chapter all terms are defined and it is exploited how to evaluate the changability of a factory. The chapter closes with a vision of the changeable factory.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 139.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Bibliography

  1. Abele, E., Versch, A., Wörn, A.: Reconfigurable manufacturing systems (RMS) for machining of case and similar parts in machine building. In: Dashchenko, A.I. (eds) Reconfigurable Manufacturing Systems and Transformable Factories, 1st edn, pp. 327–339. Springer, Berlin (2006)

    Google Scholar 

  2. Aggteleky, B.: Fabrikplanung und Werksentwicklung. Band 2: Betriebsanalyse und Feasibility-Studie (Factory planning and plant development. vol. 2: Operation Analysis and Feasibility Study). Hanser, Munich Vienna (1987)

    Google Scholar 

  3. Eversheim, W., Kettner, P., Merz, K.-P.: Ein Baukastensystem für die Montage konzipieren (To design A modular system for the assembly). Industrie Anzeiger 105(92), 27–30 (1983)

    Google Scholar 

  4. Heger, Ch. L.: Bewertung der Wandlungsfähigkeit von Fabrikobjekten (Review of the changeability of factory objects). Ph.D. Thesis, Leibniz University Hannover 2006. Verlag PZH Produktionstechnisches Zentrum GmbH, Garbsen (2007)

    Google Scholar 

  5. El Maraghy, H., Wiendahl, H.-P.: Changeability—an introduction. In: ElMaraghy, H. (ed.) Changeable and Reconfigurable Manufacturing Systems. Springer, Berlin (2009)

    Google Scholar 

  6. Heragu, S.S.: Facilities Design, 2nd edn. iUniverse, Lincoln (2006)

    Google Scholar 

  7. Hernández Morales, R.: Systematik der Wandlungsfähigkeit in der Fabrikplanung (Systematics of changeability in factory planning). Ph.D. Thesis, University Hannover 2002. Fortschrittberichte VDI, Series 16, No. 149, Düsseldorf (2003)

    Google Scholar 

  8. Kaluza, B.: Erzeugniswechsel als unternehmenspolitische Aufgabe. Integrative Lösungen aus betriebswissenschaftlicher und ingenieurwissenschaftlicher Sicht (Product change as a company policy task. Integrated solutions from a business and engineering point of view). Berlin (1989)

    Google Scholar 

  9. Kaluza, B.: Flexibilität der Industrieunternehmen. Diskussionsbeiträge des Fachbereichs Wirtschaftswissenschaften der Gerhard-Mercator-Universität Gesamthochschule Duisburg (Flexibility of industrial companies. Discussion Papers of the Department of Economics of the Gerhard-Mercator University Duisburg, No. 208, Duisburg (1995)

    Google Scholar 

  10. Kaluza, B., Blecker, Th.: Flexibilität—State of the Art und Entwicklungstrends (Flexibilty—State of the Art and development trends). In: Kaluza, B., Blecker, Th. (eds.) Erfolgsfaktor Flexibilität. Strategien und Konzepte für wandlungsfähige Unternehmen (Flexibility as a Success Factor. Strategies and Concepts for Changeable Enterprises). Erich Schmidt Verlag, Berlin (2005)

    Google Scholar 

  11. Kettner, H., Schmidt, J., Greim, H.-R.: Leitfaden der systematischen Fabrikplanung (Guideline of Systematic Factory Planning). Hanser, Munich Vienna (1984)

    Google Scholar 

  12. Klemke, T.: Planung der systemischen Wandlungsfähigkeit von Fabri-ken (Planning of systemic changeability of factories). Ph.D. Thesis, Leibniz Universität Hannover. Publ. PZH Verlag, Garbsen (2013)

    Google Scholar 

  13. Koren, Y.: Reconfigurable manufacturing systems. In: Proceedings of the CIRP 1st International Conference on Agile, Reconfigurable Manufacturing. 20/21 May 2001. University of Ann Arbor Michigan, USA

    Google Scholar 

  14. Lotter, B., Wiendahl, H.-P. (eds.): Montage in der industriellen Produktion - Ein Handbuch für die Praxis (Assembly in industrial production—A Practical Guide), 2nd edn. Springer, Berlin (2012)

    Google Scholar 

  15. Muther, R., Hales, L.: Planning of Industrial Facilities. R. Muther and L. Hales Management Ind. Res. Publ, Kansas City (1979)

    Google Scholar 

  16. Nyhuis, P., Elscher, A., Kolakowski, M.: Prozessmodell der Synergetischen Fabrikplanung - Ganzheitliche Integration von Prozess- und Raumsicht (Process model of the synergetic factory planning. Holistic process and spatial view). wt Werkstattstechnik online 94 (2004) Issue 4, pp. 95–99

    Google Scholar 

  17. Nyhuis, P., Reinhart, G., Abele, E. (eds.): Wandlungsfähige Produktionssysteme. Heute die Industrie von morgen gestalten (Changeable production systems. Today, Shaping Tomorrow’’ Industry). Verlag Produktionstechnisches Zentrum GmbH. Garbsen (2008)

    Google Scholar 

  18. Nyhuis, P., Klemke, T., Wagner, C.: Wandlungsfähigkeit - ein systemi-scher Ansatz (Changeabilty - a systemic approach). In: Nyhuis, P. (Hrsg.) Wandlungsfähige Produktionssysteme. Schriftreihe der Hochschulgruppe für die Arbeits- und Betriebsorganisation (Changeable Production Systems. Series of the scientific group for the working and operational organization e.V. (HAB)), pp. 3–21. GITO-Verlag, Berlin (2010)

    Google Scholar 

  19. Nyhuis, P., Deuse, J., Rehwald, J.: Wandlungsfähige Produktion. Heute für morgen gestalten (Changeable Production. Today designed for tomorrow). PZH Verlag, Garbsen (2013)

    Google Scholar 

  20. Narain, R., Yadav, R.C., Sarkis, J., Cordeiro, J.J.: The strategic implications of flexibility in manufacturing systems. Int. J. Agil. Manag. Syst. 2/3, 202–213 (2000)

    Google Scholar 

  21. Reichardt, J., Pfeifer, I.: Phasenmodell der Synergetischen Fabrikplanung. Stand der Forschung und Praxisbeispiele (Phase model of the synergetic factory planning. State of research and practical examples). wt Werkstattstechnik online 97(4), pp. 218–225 (1997)

    Google Scholar 

  22. Reinhart, G.: Innovative Prozesse und Systeme – Der Weg zu Flexibilität und Wandlungsfähigkeit (Innovative processes and systems—the way to flexibility and adaptability). In: Milberg, J., Reinhart, G. (eds.): Mit Schwung zum Aufschwung (With verve on recovery). Münchener Koll. ‘97. Landsberg/Lech (1997)

    Google Scholar 

  23. Reinhart, G.: Im Denken und Handeln wandeln (Change in thinking and acting). In: Reinhart, G. (Hrsg.) Proceedings of Münchener Kolloquium 2000. Munich Vienna (2000)

    Google Scholar 

  24. Reinhart, G., Kerbs, P., Schellmann, H.: Flexibilität und Wandlungsfähigkeit - das richtige Maß finden (Flexibility and adaptability—finding the right balance). In: Hoffmann, H., Reinhart, R., Zäh, M.F. (eds.) Münchener kolloquium. Innovationen für die Produktion (Innovations for production). Proceedings of Production Congress 9, pp. 45–55 (2008)

    Google Scholar 

  25. Schenk, M., et al.: Factory Planning Manual. Situation-Driven Production Facility Planning. Springer, Berlin (2010)

    Book  Google Scholar 

  26. Stephens, M.P., Meyers, F.E.: Manufacturing Facilities. Design and Material Handling, 4th edn. Prentice Hall, New Jersey (2009)

    Google Scholar 

  27. Tompkins, J.A., et al.: Facilities Planning, 4th edn. Wiley, Hoboken (2012)

    Google Scholar 

  28. De Toni, A., Tonchia, S.: Manufacturing flexibility: a literature review. Int. J. Prod. Res. 36(36), 1587–1617 (1998)

    Article  MATH  Google Scholar 

  29. Ulrich, H., Probst. G.J.B.: Anleitung zum ganzheitlichen Denken und Handeln: Ein Brevier für Führungskräfte (Instructions for holistic thinking and action: A Breviary for executives), 3rd edn. Haupt, Bern Stuttgart (1995)

    Google Scholar 

  30. ElMaraghy, W., et al: Complexity in Engineering Design and Manufacturing, vol. 2, issue 61, pp. 793– 814. International Academy for Production Engineering, CIRP Annals—Manufacturing Technology (2012)

    Google Scholar 

  31. Westkämper, E.: Die Wandlungsfähigkeit von Unternehmen (Changeablity of enterprises). wt Werkstattstechnik 89(4), 131–139 (1999)

    Google Scholar 

  32. Westkämper, E., Zahn, E., Balve, P., Tilebein, M.: Ansätze zur Wandlungsfähigkeit von Produktionsunternehmen (Approaches to the changeability of manufacturing enterprises). wt Werkstattstechnik 90(1½), 22–26 (2000)

    Google Scholar 

  33. Westkämper, Engelbert; Zahn, Erich (Hrsg.): Wandlungsfähige Produktionsunternehmen. Das Stuttgarter Unternehmensmodell (Changeable Manufacturing Companies The Stuttgart Enterprise Model). Springer, Berlin (2009)

    Google Scholar 

  34. Wiendahl, H.-P., Mende, R.: Produkt- und Produktionsflexibilität – Wettbewerbsfaktoren für die Zukunft (Product and production flexibility - competitive factors for the future). wt Zeitschr. f. industrielle Fertigung 71, 295–296 (1981)

    Google Scholar 

  35. Wiendahl, H.-P., Hernandez, R.: Wandlungsfähigkeit – neues Zielfeld in der Fabrikplanung (Changeablity—a new target field in factory planning). Industrie-Management 16(5), 37–41 (2000)

    Google Scholar 

  36. Wiendahl, H.-P., Reichhardt, J., Hernandez, R.: Kooperative Fabrikplanung – Wandlungsfähigkeit durch zielorientierte Integration von Prozeß- und Bauplanung (Cooperative factory planning—changeability through targeted integration of process and construction planning). wt Werkstattstechnik 91(4), 186–191 (2001)

    Google Scholar 

  37. Wiendahl, H.-P., Nofen, D., Klußmann, J.H., Breitenbach, F. (Hrsg.): Planung modularer Fabriken. Vorgehen und Beispiele aus der Praxis (Planning modular factories. Approach and practical examples). Hanser, Munich Vienna (2005)

    Google Scholar 

  38. Wiendahl, H.-P., et al.: Changeable manufacturing—classification, design and operation. Annal. CIRP 56(2), 783–809 (2007)

    Article  Google Scholar 

  39. Wirth, S. (eds.): Flexible, temporäre Fabriken - Arbeitsschritte auf dem Weg zu wandlungsfähigen Fabrikstrukturen (Flexible temporary factory - steps on the way to transformable factory structures). Wiss. Berichte FZKA-PFT 203 Forschungszentrum Karlsruhe, ISSN 0948–142 (2000)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hans-Peter Wiendahl .

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Wiendahl, HP. (2015). Systematics of Changeability. In: Handbook Factory Planning and Design. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-46391-8_5

Download citation

  • DOI: https://doi.org/10.1007/978-3-662-46391-8_5

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-662-46390-1

  • Online ISBN: 978-3-662-46391-8

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics