Abstract
In order to solve the problem of insufficient incentives for the contractor due to the construction of information asymmetry, the use of agency theory, under the ternary structure of owners, contractors and supervisor, based on the information available verifiable and information partial verify, the conditions were established under the supervision of the owners of the side effects of moral hazard model contractor, conducted a quantitative research project management. The results show that: in the BOQ model is based on the condition part of verifiable information will increase the risk of the contractor’s risk aversion, and it will make the owners to obtain a lower expected utility, size and risk of the contractor and the contractor supervisor’s ability to work is negatively correlated with the cost of the contractor’s work is positively correlated.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Arditi D, Yasamis F (1998) Incentive/disincentive contracts: perceptions of owners and contractors. J Constr Eng Manage 124(5):361–373
Berends TC (2000) Cost plus incentive fee contracting-experiences and structuring. Int J Project Manage 18(3):165–171
Ghosh S (2001) Financial stability and public policy: an overview. Library University of Munich, Germany
Green JR, Laffont JJ (1986) Partially verifiable information and mechanism design. Rev Econ Stud 53(3):447–456
Grossman SJ (1981) The informational role of warranties and private disclosure about product quality. J Law Econ 24(3):461–483
Hancher DE, Lambert SE (2002) Quality-based prequalification of contractors. Transp Res Record: J Transp Res Board 1813(1):260–274
Hong S, Qian Z, Zhang D (2007) Analysis of supply chain principal-agent incentive contract. Int J ManageSci Eng Manage 2(2):155–160
Hughes RK, Ahmed SA (1991) Highway construction quality management in oklahoma. Transp Res Record 13(10):20–26
Korn E (2004) Voluntary disclosure of partially verifiable information. Schmalenbach Bus Rev 56(2):139–163
Lipman BL, Seppi DJ (1995) Robust inference in communication games with partial provability. J EconTheory 66(2):370–405
Martimort D, Pouyet J (2008) To build or not to build: normative and positive theories of public-private partnerships. Int J Ind Organ 26(2):393–411
Tang W, Qiang M, Duffield CF (2008) Incentives in the chinese construction industry. J Constr Eng Manage 134(7):457–467
Wagner PA (2011) Unmediated communication with partially verifiable types. J Math Econ 47(1):99–107
Ward SC, Chapman CB (1995) Evaluating fixed price incentive contracts. Omega 23(1):49–62
Yang Q (2009) Principal-agent relationship of owner and construction agent of substitute expressway. China J Highw Transp 5:105–110
Zhu B, Li QM (2005) Analysis of the moral risk model during construction process under asymmetric information. J Chongqing Jianzhu Univ 27(4):102–105
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Zhao, L., Guo, H. (2014). Research of Contractor’s Incentive Problem Under the Ternary Structure. In: Xu, J., Cruz-Machado, V., Lev, B., Nickel, S. (eds) Proceedings of the Eighth International Conference on Management Science and Engineering Management. Advances in Intelligent Systems and Computing, vol 281. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-55122-2_99
Download citation
DOI: https://doi.org/10.1007/978-3-642-55122-2_99
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-55121-5
Online ISBN: 978-3-642-55122-2
eBook Packages: EngineeringEngineering (R0)