Abstract
This chapter provides a detailed description of the planning situation within a manufacturer of office furniture. The description provides much insight into the reality of planning and rescheduling, including the dynamic relation between planning and the shop floor. A quasi-experiment is reported in which the planning department has been relocated closer to the shop floor. Expectations before and experiences after the relocation are measured and reported. Although no significant changes in communication behavior are observed, both planners and shop floor foremen perceived positive consequences of the relocation.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Berglund, M., & Karltun, J. (2007). Human, technological and organizational aspects influencing the production scheduling process. International Journal of Production Economics, 110(1–2), 160–174.
Crawford, S., MacCarthy, B. L., Vernon, C., & Wilson, J. R. (1999). Investigating the work of industrial schedulers through field study. Cognition, Technology and Work, 1(2), 63–77.
De Snoo, C., Van Wezel, W., & Wortmann, J. C. (2010a). Integration of scheduling and manufacturing: consequences of relocating the scheduling department. Working report. Groningen: University of Groningen.
De Snoo, C., Van Wezel, W., Wortmann, J. C., & Gaalman, G. J. C. (2010b). Coordination activities of human planners during rescheduling: Case analysis and event handling procedure. International Journal of Production Research, DOI: 10.1080/00207541003639626.
Jackson, S., MacCarthy, B. L., & Wilson, J. R. (2004). A new model of scheduling in manufacturing: tasks, roles, and monitoring. Human Factors, 46(3), 533–550.
MacCarthy, B. L., Wilson, J. R., & Crawford, S. (2001). Human performance in industrial scheduling: a framework for understanding. Human Factors and Ergonomics in Manufacturing, 11(4), 299–320.
McKay, K. N., Safayeni, F. R., & Buzacott, J. A. (1995). ‘Common sense’ realities of planning and scheduling in printed circuit board production. International Journal of Production Research, 33(6), 1587–1604.
McKay, K. N., & Wiers, V. C. S. (2003). Planning, scheduling and dispatching tasks in production control. Cognition, Technology & Work, 5(2), 82–93.
McKay, K. N., & Wiers, V. C. S. (2006). The organizational interconnectivity of planning and scheduling. In W. Van Wezel, R. J. Jorna, & A. M. Meystel (Eds.), Planning in intelligent systems: Aspects, motivations, and methods. New York: Wiley.
Van Wezel, W., Van Donk, D. P., & Gaalman, G. J. C. (2006). The planning flexibility bottleneck in food processing industries. Journal of Operations Management, 24(3), 287–300.
Acknowledgement
The authors thank Desk&Storage for its willingness to participate in this research and Stephan Keuper for contributing to the data collection and analyses.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2010 Springer Berlin Heidelberg
About this chapter
Cite this chapter
De Snoo, C., van Wezel, W. (2010). The Interconnectivity of Planning and Shop Floor: Case Description and Relocation Analysis. In: Fransoo, J., Waefler, T., Wilson, J. (eds) Behavioral Operations in Planning and Scheduling. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-13382-4_3
Download citation
DOI: https://doi.org/10.1007/978-3-642-13382-4_3
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-13381-7
Online ISBN: 978-3-642-13382-4
eBook Packages: Business and EconomicsBusiness and Management (R0)