Abstract

Uncertainty has been a main topic in mine planning research during the last decade. Several models have been proposed to address and incorporate the uncertainty in the strategic mine planning process, to generate a better, more profitable plan even in adverse conditions such as geological or metal price uncertainty. Among these models, in the general two-stage approach, the extraction is usually the first-stage decision while processing considers the uncertainty as a second-stage decision. Another option is to minimize deviations from production targets (ore, average grade, and contaminants) considering the uncertainty in the grade of the deposit, or the risk averse approaches where some risk measure is introduced to minimize the losses in unfavorable scenarios. However, it is not clear how these models perform comparatively since they often consider the uncertainty in a fundamentally different way, with different objectives functions, constraints and uncertainty modeling. Therefore, there are no general guidelines under which conditions some approach is better than other. For this reason, this works aims to compare two of these proposed models (two-stage and minimization of deviations) under the same conditions, to verify the advantages of each one of them and generate recommendations about the applicability of these approaches. This comparison is performed considering the production plan, the distribution of the net present value, the total deviations from the target, among other indicators.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Dimitrakopoulos, R., Farrelly, C.T., Godoy, M.: Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 111, 82–88 (2002)

    Google Scholar 

  2. Dimitrakopoulos, R.: Stochastic optimization for strategic mine planning: a decade of developments. J. Min. Sci. 47(2), 138–150 (2011)

    Article  Google Scholar 

  3. Newman, A., Rubio, E., Caro, R., Weintraub, A.: A review of operations research in mine planning. Interfaces 40(3), 222–245 (2010)

    Article  Google Scholar 

  4. Espinoza, D., Lagos, G., Moreno, E., Vielma, J.: Risk averse approaches in open-pit production planning under ore grade uncertainty: an ultimate pit study. In: Proceedings of the 36th International Symposium on the Applications of Computers and Operations Research in the Mineral Industry (APCOM), pp. 492–501 (2013)

    Google Scholar 

  5. Espinoza, D., Goycoolea, M., Moreno, E., Muñoz, G., Queyranne, M.: Open pit mine scheduling under uncertainty: a robust approach. In: Proceedings of the 36th International Symposium on the Applications of Computers and Operations Research in the Mineral Industry (APCOM), pp. 433–444 (2013)

    Google Scholar 

  6. Amankwah, H., Larsson, T., Textorius, B.: Open-pit mining with uncertainty: a conditional value-at-risk approach. In: Optimization Theory, Decision Making, and Operations Research Applications, 31, pp. 117–139. Springer Proceedings in Mathematics & Statistics (2013)

    Google Scholar 

  7. Ramazan, S., Dimitrakopoulos, R.: Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation. Australas. Inst. Min. Metall. Spectr. Ser. 14, 359 (2007)

    Google Scholar 

  8. Dimitrakopoulos, R., Ramazan, S.: Stochastic integer programming for optimising long-term production schedules of open pit mines - methods, application and value of stochastic solutions. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 117(4), 155–160 (2008)

    Google Scholar 

  9. Albor Consuegra, F.R., Dimitrakopoulos, R.: Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 119(2), 88–101 (2010)

    Google Scholar 

  10. Albor Consuegra, F.R., Dimitrakopoulos, R.: Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 118(2), 79–90 (2009)

    Google Scholar 

  11. Benndorf, J., Dimitrakopoulos, R.: Stochastic long-term production scheduling of iron ore deposits: integrating joint multi-element geological uncertainty. J. Min. Sci. 49(1), 68–81 (2013)

    Article  Google Scholar 

  12. Goodfellow, R., Dimitrakopoulos, R.: Global optimization of open pit mining complexes with uncertainty. Appl. Soft Comput. 40, 292–304 (2016)

    Article  Google Scholar 

  13. Montiel, L., Dimitrakopoulos, R.: Optimizing mining complexes with multiple processing and transportation alternatives: an uncertainty-based approach. Eur. J. Oper. Res. 247, 166–178 (2015)

    Article  Google Scholar 

  14. Boland, N., Dimitrescu, I., Froyland, G.: A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Optimization Online, http://www.optimization-online.org/DB_FILE/2008/10/2123.pdf. Visited 19 Apr 2018 (2008)

  15. Moreno, E., Emery, X., Goycoolea, M., Morales, N., Nelis, G.: A two-stage stochastic model for open pit mine planning under geological uncertainty. In: Proceedings of the 38th International Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM), pp. 13.27–13.33 (2017)

    Google Scholar 

  16. Bienstock, D., Zuckerberg M.: Solving LP relaxations of large-scale precedence constrained problems. In: Proc. 14th Conf. Integer Programming Combin. Optim. (IPCO). Lecture Notes in Computer Science, 6080, pp. 1–14 (2010)

    Google Scholar 

  17. Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., Rubio, E.: A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60(3), 517–528 (2012)

    Article  Google Scholar 

  18. Nelis, G., Morales, N.: Effect of information on the short-term scheduling in an open pit mine. In: Proceedings of the 5th International Seminar on Mine Planning (2017)

    Google Scholar 

  19. Leite, A., Dimitrakopoulos, R.: Stochastic optimization of mine production scheduling with uncertain ore/metal/waste supply. Int. J. Min. Sci. Technol. 24, 755–762 (2014)

    Article  Google Scholar 

Download references

Acknowledgements

The authors would like to acknowledge the support of Conicyt through the Grant “Fondo Basal FB0809” and CONICYT PIA Anillo ACT1407 for the work described in this publication.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to G. Nelis .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Nelis, G., Morales, N., Widzyk-Capehart, E. (2019). Comparison of Different Approaches to Strategic Open-Pit Mine Planning Under Geological Uncertainty. In: Widzyk-Capehart, E., Hekmat, A., Singhal, R. (eds) Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection - MPES 2018. Springer, Cham. https://doi.org/10.1007/978-3-319-99220-4_8

Download citation

Publish with us

Policies and ethics