Uncertainty has been a main topic in mine planning research during the last decade. Several models have been proposed to address and incorporate the uncertainty in the strategic mine planning process, to generate a better, more profitable plan even in adverse conditions such as geological or metal price uncertainty. Among these models, in the general two-stage approach, the extraction is usually the first-stage decision while processing considers the uncertainty as a second-stage decision. Another option is to minimize deviations from production targets (ore, average grade, and contaminants) considering the uncertainty in the grade of the deposit, or the risk averse approaches where some risk measure is introduced to minimize the losses in unfavorable scenarios. However, it is not clear how these models perform comparatively since they often consider the uncertainty in a fundamentally different way, with different objectives functions, constraints and uncertainty modeling. Therefore, there are no general guidelines under which conditions some approach is better than other. For this reason, this works aims to compare two of these proposed models (two-stage and minimization of deviations) under the same conditions, to verify the advantages of each one of them and generate recommendations about the applicability of these approaches. This comparison is performed considering the production plan, the distribution of the net present value, the total deviations from the target, among other indicators.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Dimitrakopoulos, R., Farrelly, C.T., Godoy, M.: Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 111, 82–88 (2002)
Dimitrakopoulos, R.: Stochastic optimization for strategic mine planning: a decade of developments. J. Min. Sci. 47(2), 138–150 (2011)
Newman, A., Rubio, E., Caro, R., Weintraub, A.: A review of operations research in mine planning. Interfaces 40(3), 222–245 (2010)
Espinoza, D., Lagos, G., Moreno, E., Vielma, J.: Risk averse approaches in open-pit production planning under ore grade uncertainty: an ultimate pit study. In: Proceedings of the 36th International Symposium on the Applications of Computers and Operations Research in the Mineral Industry (APCOM), pp. 492–501 (2013)
Espinoza, D., Goycoolea, M., Moreno, E., Muñoz, G., Queyranne, M.: Open pit mine scheduling under uncertainty: a robust approach. In: Proceedings of the 36th International Symposium on the Applications of Computers and Operations Research in the Mineral Industry (APCOM), pp. 433–444 (2013)
Amankwah, H., Larsson, T., Textorius, B.: Open-pit mining with uncertainty: a conditional value-at-risk approach. In: Optimization Theory, Decision Making, and Operations Research Applications, 31, pp. 117–139. Springer Proceedings in Mathematics & Statistics (2013)
Ramazan, S., Dimitrakopoulos, R.: Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation. Australas. Inst. Min. Metall. Spectr. Ser. 14, 359 (2007)
Dimitrakopoulos, R., Ramazan, S.: Stochastic integer programming for optimising long-term production schedules of open pit mines - methods, application and value of stochastic solutions. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 117(4), 155–160 (2008)
Albor Consuegra, F.R., Dimitrakopoulos, R.: Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 119(2), 88–101 (2010)
Albor Consuegra, F.R., Dimitrakopoulos, R.: Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis. Trans. Inst. Min. Metall. Sect. A: Min. Technol. 118(2), 79–90 (2009)
Benndorf, J., Dimitrakopoulos, R.: Stochastic long-term production scheduling of iron ore deposits: integrating joint multi-element geological uncertainty. J. Min. Sci. 49(1), 68–81 (2013)
Goodfellow, R., Dimitrakopoulos, R.: Global optimization of open pit mining complexes with uncertainty. Appl. Soft Comput. 40, 292–304 (2016)
Montiel, L., Dimitrakopoulos, R.: Optimizing mining complexes with multiple processing and transportation alternatives: an uncertainty-based approach. Eur. J. Oper. Res. 247, 166–178 (2015)
Boland, N., Dimitrescu, I., Froyland, G.: A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Optimization Online, http://www.optimization-online.org/DB_FILE/2008/10/2123.pdf. Visited 19 Apr 2018 (2008)
Moreno, E., Emery, X., Goycoolea, M., Morales, N., Nelis, G.: A two-stage stochastic model for open pit mine planning under geological uncertainty. In: Proceedings of the 38th International Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM), pp. 13.27–13.33 (2017)
Bienstock, D., Zuckerberg M.: Solving LP relaxations of large-scale precedence constrained problems. In: Proc. 14th Conf. Integer Programming Combin. Optim. (IPCO). Lecture Notes in Computer Science, 6080, pp. 1–14 (2010)
Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., Rubio, E.: A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60(3), 517–528 (2012)
Nelis, G., Morales, N.: Effect of information on the short-term scheduling in an open pit mine. In: Proceedings of the 5th International Seminar on Mine Planning (2017)
Leite, A., Dimitrakopoulos, R.: Stochastic optimization of mine production scheduling with uncertain ore/metal/waste supply. Int. J. Min. Sci. Technol. 24, 755–762 (2014)
Acknowledgements
The authors would like to acknowledge the support of Conicyt through the Grant “Fondo Basal FB0809” and CONICYT PIA Anillo ACT1407 for the work described in this publication.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Nelis, G., Morales, N., Widzyk-Capehart, E. (2019). Comparison of Different Approaches to Strategic Open-Pit Mine Planning Under Geological Uncertainty. In: Widzyk-Capehart, E., Hekmat, A., Singhal, R. (eds) Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection - MPES 2018. Springer, Cham. https://doi.org/10.1007/978-3-319-99220-4_8
Download citation
DOI: https://doi.org/10.1007/978-3-319-99220-4_8
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-99219-8
Online ISBN: 978-3-319-99220-4
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)