Methodology to Optimize and Sequence the Semiautomated Ramp Design in Underground Mining

  • Conference paper
  • First Online:
Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection - MPES 2018

Abstract

There are few optimizing methodologies that may guide the process of ramp design in underground mining; they contemplate designing the accesses and then completing the mine exploitation schedule, which does not reflect the development costs in the NPV of the project and relies on the engineer’s knowledge. The methodology presented in this paper focuses on the assisting the ramp design in underground mining using an optimization model that gives the operational costs associated with the accesses, during the development and the operation of the mine. Additionally, a sequence of construction is obtained as a complement of the design with a scheduling software. The methodology aims to obtain a design and sequence of the ramps and crosscuts configuration considering initial parameters that must be entered the optimization model such as production levels, maximum slope, curvature, construction costs, and transportation costs, among others. After applying the optimization model, the result is the identification of the points belonging to the ramp design, the ramp construction, and operation sequence and the total cost associated with the project. This result must be refined using CAD software to obtain the final configuration. When this methodology is applied to a case study, a gold and silver mine exploited using the Bench & Fill method, the results show that the optimization model can replicate the design obtained by the prefeasibility study of the project and provide additional design options that can reduce the total cost. The methodology provides operationally feasible solutions and can be used as a guide for the design of ramps in underground mining while reducing the time allocated to these tasks and delivering more than one design according to the initial parameters.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Brazil, M., Lee, D.H., Rubinstein, J.H., Thomas, D.A., Weng, J.F., Wormald, N.C.: A network model to optimize cost in underground mine design. Trans.-South African Inst. Electr. Eng. 93(2), 97–103 (2002)

    Google Scholar 

  2. Brazil, M., Lee, D.H., Rubinstein, J.H., Thomas, D.A., Weng, J.F., Wormald, N.C.: Optimization in the design of underground mine access. In: Uncertainly and Risk Management in Orebody Modelling and Strategic Mine Planning (2004)

    Google Scholar 

  3. Brazil, M., Thomas, D.A.: Network optimization for the design of underground mines. Networks 49(1), 40–50 (2007)

    Article  Google Scholar 

  4. Brazil, M., Grossman, P.A., Lee, D.H., Rubinstein, J.H., Thomas, D.A., Wormald, N.C.: Constrained path optimization for underground mine layout. In: World Congress on Engineering, pp. 856–861 (2007)

    Google Scholar 

  5. Brazil, M., Grossman, P., Rubinstein, J.H., Thomas, D.: Improving underground mine access layouts using software tools. Interfaces 44(2), 195–203 (2013)

    Article  Google Scholar 

  6. De Smith, M.J.: Determination of gradient and curvature constrained optimal paths. Comput.-Aided Civil Infrastruct. Eng. 21(1), 24–38 (2006)

    Article  Google Scholar 

  7. Ghaffariyan, M.R., Stampfer, K., Sessions, J., Durston, T., Kuehmaier, M., Kanzian, C.: Road network optimization using heuristic and linear programming. J. Forest Sci. 56(3), 137–145 (2010)

    Article  Google Scholar 

  8. Morales, N., Nancel-Penard, P., Parra, A.: An integer linear programming model for optimizing open pit ramp design. In: APCOM 2017 Proceedings, Session 11, pp. 9–16 (2017)

    Google Scholar 

Download references

Acknowledgements

The authors would like to thank the Advanced Mining Technology Center (Basal Grant FB0809) and Eleonora Widzyk-Capehart for supporting this work.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to S. Montané .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Montané, S., Nancel-Penard, P., Morales, N. (2019). Methodology to Optimize and Sequence the Semiautomated Ramp Design in Underground Mining. In: Widzyk-Capehart, E., Hekmat, A., Singhal, R. (eds) Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection - MPES 2018. Springer, Cham. https://doi.org/10.1007/978-3-319-99220-4_11

Download citation

Publish with us

Policies and ethics