Abstract
The aim is to evaluate the time and cost efficiency of constructing concrete runways and find optimal solutions. The analysis was carried out for a design of a 3600 m runway with set location considerations (Katowice-Pyrzowice airport). Reinforced and post-tensioned concrete runways have been compared. National standards were applied while calculating the costs. All cost estimates were obtained from local suppliers/contractors. Time schedules were prepared for the runways using network analysis. They were based on seven days a week, twenty-four hours a day work. It was assumed that work units were optimised. The following results have been obtained: cost calculation for post-tensioned runway was about 6.4 million € lower than for reinforced runway, which is 18 % of the total cost. Duration of construction of post-tensioned runway was estimated to require 10 months whereas reinforced takes with an 8 % more time.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Boeing Commercial Airplanes: 747-400 Airplane Characteristics for Airport Planning. Seattle-Washington (2012)
Nita, P.: Budowa i Utrzymanie Nawierzchni Lotniskowych. WKiŁ, Warszawa (2008)
Sznurawa, A., Zagadnienia Konstrukcyjno-Technologiczne Dotyczące Projektowania Betonowych Nawierzchni Lotniskowych. Master Thesis. Politechnika Krakowska, Kraków (2012)
Website, http://www.marcinnowak.eu
Więckowski, A., Sznurawa, A.: Effectiveness of concrete runways construction on the eve of air transport domination. In: Creative Construction Conference. Technical report, Budapest (2013)
Więckowski, A., Sznurawa, A.: Structural aspects of airfield runways with concrete pavements. Studia Geotechnica et Machanica. Wrocław (2016-in print)
Więckowski, A.: Dobór Urządzeń do Podawania Mieszanki Betonowej. Przegląd Budowlany, vol. 5, pp. 25–29, Warszawa (2003)
Więckowski, A.: Transport Mieszanki Betonowej. Politechnika Krakowska, Kraków (2013)
Katowice Airport Website, http://www.katowice-airport.com
Jaworski, K.M.: Podstawy Organizacji Budowy. PWN, Warszawa (2010)
Martinek, W., Tokarski, Z., Chojnacki, K.: Organizacja Budowy Asfaltowych Nawierzchni Drogowych. PWN, Warszawa (2012)
Ośrodek Wdrożeń Ekonomiczno-Organizacyjnych Budownictwa. Sekocenbud, http://www.sekocenbud.pl/
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing Switzerland
About this paper
Cite this paper
Więckowski, A., Sznurawa, A. (2017). Cost and Implementation Cycle of Concrete Runways. In: Macioszek, E., Sierpiński, G. (eds) Contemporary Challenges of Transport Systems and Traffic Engineering . Lecture Notes in Networks and Systems, vol 2. Springer, Cham. https://doi.org/10.1007/978-3-319-43985-3_9
Download citation
DOI: https://doi.org/10.1007/978-3-319-43985-3_9
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-43984-6
Online ISBN: 978-3-319-43985-3
eBook Packages: EngineeringEngineering (R0)