Abstract
This chapter analyzes the benefits that can be obtained from a successful JIT implementation. Since data was obtained from subjective assessments, the median values were considered the measure of central tendency, while the measure of dispersion was represented by the interquartile range value and not by the traditional standard deviation used for interval values.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Agus A, Hassan Zf (2011) Enhancing production performance and customer performance through total quality management (TQM): strategies for competitive advantage. Procedia Soc Behav Sci 24:1650–1662. doi:10.1016/j.sbspro.2011.09.019
Ahmed PK, Rafiq M (2002) Total quality management (TQM) and internal marketing (Chap. 6). In: Ahmed PK, Rafiq M (eds) Internal marketing. Butterworth-Heinemann, Oxford, pp 91–124. doi:10.1016/B978-0-7506-4838-7.50011-9
Ahmad S, Schroeder RG, Sinha KK (2003) The role of infrastructure practices in the effectiveness of JIT practices: implications for plant competitiveness. J Eng Tech Manage 20(3):161–191. doi:10.1016/S0923-4748(03)00017-1
Ahmad MF, Zakuan N, Jusoh A, Takala J (2012) Relationship of TQM and business performance with mediators of SPC, lean production and TPM. Procedia Soc Behav Sci 65:186–191. doi:10.1016/j.sbspro.2012.11.109
Aigbedo H (2007) An assessment of the effect of mass customization on suppliers’ inventory levels in a JIT supply chain. Eur J. Oper Res 181(2):704–715. doi:10.1016/j.ejor.2006.06.037
Aksoy A, Öztürk N (2011) Supplier selection and performance evaluation in just-in-time production environments. Expert Syst Appl 38(5):6351–6359. doi:10.1016/j.eswa.2010.11.104
Alcaraz JLG, Maldonado AA, Iniesta AA, Robles GC, Hernández GA (2014) A systematic review/survey for JIT implementation: Mexican maquiladoras as case study. Comput Ind 65(4):761–773. doi:10.1016/j.compind.2014.02.013
Ali J, Kumar S (2011) Information and communication technologies (ICTs) and farmers’ decision-making across the agricultural supply chain. Int J Inf Manage 31(2):149–159. doi:10.1016/j.ijinfomgt.2010.07.008
Almomani MA, Aladeemy M, Abdelhadi A, Mumani A (2013) A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques. Comput Ind Eng 66(2):461–469. doi:10.1016/j.cie.2013.07.011
Amasaka K (2002) “New JIT”: a new management technology principle at Toyota. Int J Prod Econ 80(2):135–144. doi:10.1016/S0925-5273(02)00313-4
Amasaka K (2007) Applying new JIT—Toyota’s global production strategy: epoch-making innovation of the work environment. Robot Comput Integr Manuf 23(3):285–293. doi:10.1016/j.rcim.2006.02.001
Amasaka K (2014) New JIT, new management technology principle: surpassing JIT. Procedia Technol 16:1135–1145. doi:10.1016/j.protcy.2014.10.128
Anderman EM, Gray D (2015) Motivation, learning, and instruction. In: Wright JD (ed) International encyclopedia of the social & behavioral sciences, 2nd edn. Elsevier, Oxford, pp 928–935. doi:10.1016/B978-0-08-097086-8.26041-8
Azadeh A, Bidokhti B, Sakkaki SMR (2005) Design of practical optimum JIT systems by integration of computer simulation and analysis of variance. Comput Ind Eng 49(4):504–519. doi:10.1016/j.cie.2005.03.005
Azadeh A, Motevali Haghighi S, Asadzadeh SM (2014) A novel algorithm for layout optimization of injection process with random demands and sequence dependent setup times. J Manuf Syst 33(2):287–302. doi:10.1016/j.jmsy.2013.12.008
Bayo-Moriones A, Lera-López F (2007) A firm-level analysis of determinants of ICT adoption in Spain. Technovation 27(6–7):352–366. doi:10.1016/j.technovation.2007.01.003
Bennett GF (1984) A guide to the safe handling of hazardous materials accidents: manual STP/825, American Society for testing materials, Philadelphia, PA, 1982, 53 pages. J Hazard Mater 9(3):396. doi:10.1016/0304-3894(84)87022-3
Benton WC, Shin H (1998) Manufacturing planning and control: the evolution of MRP and JIT integration. Eur J Oper Res 110(3):411–440. doi:10.1016/S0377-2217(98)00080-0
Berghman L, Matthyssens P, Vandenbempt K (2012) Value innovation, deliberate learning mechanisms and information from supply chain partners. Ind Mark Manage 41(1):27–39. doi:10.1016/j.indmarman.2011.11.014
Billesbach TJ (1991) A study of the implementation of just-in-time in the United States. Prod Inventory Manage J 32(3):1–4
Blaga P, Jozsef B (2014) Human resources, quality circles and innovation. Procedia Econ Finance 15:1458–1462. doi:10.1016/S2212-5671(14)00611-X
Bowman C, Carter S (1995) Organising for competitive advantage. Eur Manage J 13(4):423–433. doi:10.1016/0263-2373(95)00036-K
Brown JR (2014) A capacity constrained mathematical programming model for cellular manufacturing with exceptional elements. J Manuf Syst. doi:10.1016/j.jmsy.2014.09.005
Brox JA, Fader C (1997) Assessing the impact of JIT using economic theory. J Oper Manage 15(4):371–388. doi:10.1016/S0272-6963(97)00005-3
Chan FTS (2001) Effect of kanban size on just-in-time manufacturing systems. J Mater Process Technol 116(2–3):146–160. doi:10.1016/S0924-0136(01)01022-6
Chen Y, Xiao Q, Tang X (2011) Product layout optimization and simulation model in a multi-level distribution center. Syst Eng Procedia 2:300–307. doi:10.1016/j.sepro.2011.10.042
Cheng C-F, Chang M-L, Li C-S (2013) Configural paths to successful product innovation. J Bus Res 66(12):2561–2573. doi:10.1016/j.jbusres.2012.10.006
Cheung C, Baum T, Wong A (2012) Relocating empowerment as a management concept for Asia. J Bus Res 65(1):36–41. doi:10.1016/j.jbusres.2011.07.012
Chiarini A (2013) The main methods of lean organization: Kanban, Cellular Manufacturing, SMED and TPM. In: Lean organization: from the tools of the Toyota Production System to Lean Office, vol 3. Perspectives in Business Culture. Springer, Milan, pp 81–116. doi:10.1007/978-88-470-2510-3_6
Chu KF (2003) An organizational culture and the empowerment for change in SMEs in the Hong Kong manufacturing industry. J Mater Process Technol 139(1–3):505–509. doi:10.1016/S0924-0136(03)00527-2
Colombo MG, Croce A, Grilli L (2013) ICT services and small businesses’ productivity gains: an analysis of the adoption of broadband internet technology. Inf Econ Policy 25(3):171–189. doi:10.1016/j.infoecopol.2012.11.001
Cua KO, McKone KE, Schroeder RG (2001) Relationships between implementation of TQM, JIT, and TPM and manufacturing performance. J Oper Manage 19(6):675–694. doi:10.1016/S0272-6963(01)00066-3
David I, Eben-Chaime M (2003) How far should JIT vendor–buyer relationships go? Int J Prod Econ 81–82:361–368. doi:10.1016/S0925-5273(02)00274-8
de Macedo-Soares TDLvA, Lucas DC (1995) Empowerment and total quality: comparing research findings in the USA and Brazil. Technovation 15(8):475–495. doi:10.1016/0166-4972(95)96587-J
Deshpande SP, Golhar DY (1996) HRM practices of JIT firms in Canada. Prod Plan Control 7(1):79
Dey O, Giri BC (2014) Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process. Int J Prod Econ 155:222–228. doi:10.1016/j.ijpe.2014.02.004
Diefendorff JM, Seaton GA (2015) Work motivation. In: Wright JD (ed) International encyclopedia of the social & behavioral sciences, 2nd edn. Elsevier, Oxford, pp 680–686. doi:10.1016/B978-0-08-097086-8.22036-9
Dowlatshahi S, Urias C (2004) An empirical study of ISO certification in the maquiladora industry. Int J Prod Econ 88(3):291–306. doi:10.1016/S0925-5273(03)00191-9
Dumond EJ, Newman W (1990) Closing the gap between buyer and vendor. Prod Inventory Manage J 31(4):13–17
Dwivedula R, Bredillet CN (2010) Profiling work motivation of project workers. Int J Project Manage 28(2):158–165. doi:10.1016/j.ijproman.2009.09.001
Evanschitzky H, Eisend M, Calantone RJ, Jiang Y (2012) Success factors of product innovation: an updated meta-analysis. J Prod Innov Manage 29:21–37. doi:10.1111/j.1540-5885.2012.00964.x
Fazel F, Fischer KP, Gilbert EW (1998) JIT purchasing vs. EOQ with a price discount: an analytical comparison of inventory costs. Int J Prod Econ 54(1):101–109. doi:10.1016/S0925-5273(97)00130-8
Ferradás PG, Salonitis K (2013) Improving changeover time: a tailored SMED approach for welding cells. Procedia CIRP 7:598–603. doi:10.1016/j.procir.2013.06.039
Ferretti S, Caputo D, Penza M, D’Addona DM (2013) Monitoring systems for zero defect manufacturing. Procedia CIRP 12:258–263. doi:10.1016/j.procir.2013.09.045
Fiscus JE (1987) Kanban and just-in-time at Toyota: edited by the Japanese management association, translated by David J. Lu. Productivity Press, Cambridge, MA, U.S.A., 1986. 192 pages, 40 figures, hardcover. ISBN 0-915299-08-0. List price: $29.95. Eng Manage Int 4(2):157. doi:10.1016/0167-5419(87)90022-6
Flynn B, Salakibara S, Schroeder R (1995) Relationship between JIT and TQM practices and performance. Acad Manage J 38(5):1325–1360
Fong SF, Ch’ng PE, Por FP (2013) Development of ICT competency standard using the Delphi Technique. Procedia Soc Behav Sci 103:299–314. doi:10.1016/j.sbspro.2013.10.338
Forza C, Filippini R (1998) TQM impact on quality conformance and customer satisfaction: a causal model. Int J Prod Econ 55(1):1–20. doi:10.1016/S0925-5273(98)00007-3
Fullerton RR, McWatters CS (2001) The production performance benefits from JIT implementation. J Oper Manage 19(1):81–96. doi:10.1016/S0272-6963(00)00051-6
Fullerton RR, McWatters CS (2002) The role of performance measures and incentive systems in relation to the degree of JIT implementation. Acc Organ Soc 27(8):711–735. doi:10.1016/S0361-3682(02)00012-0
Fullerton RR, McWatters CS, Fawson C (2003) An examination of the relationships between JIT and financial performance. J Oper Manage 21(4):383–404. doi:10.1016/S0272-6963(03)00002-0
Gélinas R, Jacob R, Drolet J (1996) Just-in-time purchasing and the partnership strategy. Eur J Purchasing Supply Manage 2(1):39–45. doi:10.1016/0969-7012(95)00015-1
Gilbert FW, Young JA, O’Neal CR (1994) Buyer-seller relationships in just-in-time purchasing environments. J Bus Res 29(2):111–120. doi:10.1016/0148-2963(94)90015-9
González-Benito J, Suárez-González I, Spring M (2000) Complementarities between JIT purchasing practices: an economic analysis based on transaction costs. Int J Prod Econ 67(3):279–293. doi:10.1016/S0925-5273(00)00032-3
Green Jr KW, Inman RA, Birou LM, Whitten D (2014) Total JIT (T-JIT) and its impact on supply chain competency and organizational performance. Int J Prod Econ 147(Part A):125–135. doi:10.1016/j.ijpe.2013.08.026
Gupta YP, Heragu S (1991) Implications of implementing just-in-time systems. Technovation 11(3):143–162. doi:10.1016/0166-4972(91)90031-X
Gupta YP, Lonial SC, Glynn Mangold W (1992) Empirical assessment of the strategic orientation of JIT manufacturers versus non-JIT manufacturers. Comput Integr Manuf Syst 5(3):181–189. doi:10.1016/0951-5240(92)90029-C
Hong J-D, Hayya JC, Kim S-L (1992) JIT purchasing and setup reduction in an integrated inventory model. Int J Prod Res 30(2):255–266. doi:10.1080/00207549208942893
Huang C-H, Lin P-Y (2014) Influence of spatial layout on airflow field and particle distribution on the workspace of a factory. Build Environ 71:212–222. doi:10.1016/j.buildenv.2013.09.014
Humphreys P, Shiu WK, Lo VHY (2003) Buyer–supplier relationship: perspectives between Hong Kong and the United Kingdom. J Mater Process Technol 138(1–3):236–242. doi:10.1016/S0924-0136(03)00078-5
Huq Z (1999) Conventional shop control procedures to approximate JIT inventory performance in a job shop. J Manuf Syst 18(3):161–174. doi:10.1016/S0278-6125(99)80029-6
Huq Z, Huq F (1994) Embedding JIT in MRP: the case of job shops. J Manuf Syst 13(3):153–164. doi:10.1016/0278-6125(94)90001-9
Inman RA, Sale RS, Green KW Jr, Whitten D (2011) Agile manufacturing: relation to JIT, operational performance and firm performance. J Oper Manage 29(4):343–355. doi:10.1016/j.jom.2010.06.001
Iwase M, Ohno K (2011) The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities. Eur J Oper Res 214(2):216–222. doi:10.1016/j.ejor.2011.04.014
Iyogun P (1991) Coordination of production and distribution in JIT Systems. In: Eloranta E (ed) Advances in production management systems. Elsevier, Amsterdam, pp 515–522. doi:10.1016/B978-0-444-88919-5.50058-5
Jacobs RL (2010) Training and learning in the workplace. In: McGaw PPB (ed) International encyclopedia of education, 3rd edn. Elsevier, Oxford, pp 328–336. doi:10.1016/B978-0-08-044894-7.00773-9
Jensen JB, Malhotra MK, Philipoom PR (1996) Machine dedication and process flexibility in a group technology environment. J Oper Manage 14(1):19–39. doi:10.1016/0272-6963(95)00030-5
Jones MJ (2001) Just-in-time training. Adv Developing Human Resour 3(4):480
Jun M, Cai S, Shin H (2006) TQM practice in maquiladora: antecedents of employee satisfaction and loyalty. J Oper Manage 24(6):791–812. doi:10.1016/j.jom.2005.09.006
Kemal Karasu M, Cakmakci M, Cakiroglu MB, Ayva E, Demirel-Ortabas N (2014) Improvement of changeover times via Taguchi empowered SMED/case study on injection molding production. Measurement 47:741–748. doi:10.1016/j.measurement.2013.09.035
Kia R, Khaksar-Haghani F, Javadian N, Tavakkoli-Moghaddam R (2014) Solving a multi-floor layout design model of a dynamic cellular manufacturing system by an efficient genetic algorithm. J Manuf Syst 33(1):218–232. doi:10.1016/j.jmsy.2013.12.005
Kim S-L, Ha D (2003) A JIT lot-splitting model for supply chain management: enhancing buyer–supplier linkage. Int J Prod Econ 86(1):1–10. doi:10.1016/S0925-5273(03)00006-9
Knechtges P, Decker MC (2014) Application of Kaizen Methodology to foster departmental engagement in quality improvement. J Am Coll Radiol 11(12, Part A):1126–1130. doi:10.1016/j.jacr.2014.08.027
Kojima M, Nakashima K, Ohno K (2008) Performance evaluation of SCM in JIT environment. Int J Prod Econ 115(2):439–443. doi:10.1016/j.ijpe.2007.11.017
Krause DR, Ellram LM (1997) Success factors in supplier development. Int J Phys Distrib Logistics Manage 27(1):39–52. doi:10.1108/09600039710162277
Lawrence JJ, Hottenstein MP (1995) The relationship between JIT manufacturing and performance in Mexican plants affiliated with U.S. companies. J Oper Manage 13(1):3–18. doi:10.1016/0272-6963(95)00018-N
Li S, Ragu-Nathan B, Ragu-Nathan TS, Subba Rao S (2006) The impact of supply chain management practices on competitive advantage and organizational performance. Omega 34(2):107–124. doi:10.1016/j.omega.2004.08.002
Lim SAH, Antony J, Albliwi S (2014) Statistical process control (SPC) in the food industry—a systematic review and future research agenda. Trends Food Sci Technol 37(2):137–151. doi:10.1016/j.tifs.2014.03.010
Lortie M (2012) Analysis of the circumstances of accidents and impact of transformations on the accidents in a beverage delivery company. Saf Sci 50(9):1792–1800. doi:10.1016/j.ssci.2012.04.008
Lovell MC (2003) Optimal lot size, inventories, prices and JIT under monopolistic competition. Int J Prod Econ 81–82:59–66. doi:10.1016/S0925-5273(02)00349-3
Lyu J Jr (1996) Applying Kaizen and automation to process reengineering. J Manuf Syst 15(2):125–132. doi:10.1016/0278-6125(96)82337-5
Maiga AS, Jacobs FA (2009) JIT performance effects: a research note. Adv Account 25(2):183–189. doi:10.1016/j.adiac.2009.06.003
McCarthy D, Rich DN (2004) 2—Lean TPM. In: McCarthy D, Rich DN (eds) Lean TPM. Butterworth-Heinemann, Oxford, pp 24–48. doi:10.1016/B978-075065857-7/50005-6
McLaughlin P, Durazo-Cardenas I (2013) Cellular manufacturing applications in MRO operations. Procedia CIRP 11:254–259. doi:10.1016/j.procir.2013.07.077
Mensah P, Merkuryev Y, Longo F (2015) Using ICT in developing a resilient supply chain strategy. Procedia Comput Sci 43:101–108. doi:10.1016/j.procs.2014.12.014
Miocevic D, Crnjak-Karanovic B (2012) The mediating role of key supplier relationship management practices on supply chain orientation—the organizational buying effectiveness link. Ind Mark Manage 41(1):115–124. doi:10.1016/j.indmarman.2011.11.015
Moattar Husseini SM, O’Brien C, Hosseini ST (2006) A method to enhance volume flexibility in JIT production control. Int J Prod Econ 104(2):653–665. doi:10.1016/j.ijpe.2005.05.025
Mokhtar SSM, Yusof RZ (2010) The influence of top management commitment, process quality management and quality design on new product performance: a case of Malaysian manufacturers. Total Qual Manage Bus Excellence 21(3):291–300. doi:10.1080/14783360903553198
Monden Y (2002) The relationship between mini profit-center and JIT system. Int J Prod Econ 80(2):145–154. doi:10.1016/S0925-5273(02)00314-6
Nassimbeni G (1996) Factors underlying operational JIT purchasing practices: results of an empirical research. Int J Prod Econ 42(3):275–288. doi:10.1016/0925-5273(95)00190-5
Niskanen T, Lauttalammi J (1989) Accidents in materials handling at building construction sites. J Occup Accidents 11(1):1–17. doi:10.1016/0376-6349(89)90002-3
Orecchini F (2000) The ISO 14001 certification of a machine-process. J Clean Prod 8(1):61–68. doi:10.1016/S0959-6526(99)00315-7
Ortiz C (2010) Kaizen vs. Lean: distinct but related. Met Finish 108(1):50–51. doi:10.1016/S0026-0576(10)80011-X
Ou-Yang C, Utamima A (2013) Hybrid estimation of distribution algorithm for solving single row facility layout problem. Comput Ind Eng 66(1):95–103. doi:10.1016/j.cie.2013.05.018
Paek J (1990) A study of an enlarged JIT and its impact on JIT implementation and performance of the production system. J Oper Manage 9(3):438–439. doi:10.1016/0272-6963(90)90188-J
Pattanaik LN, Sharma BP (2009) Implementing lean manufacturing with cellular layout: a case study. Int J Adv Manuf Technol 42(7–8):772–779. doi:10.1007/s00170-008-1629-8
Pourbabai B (1988) A just-in-time/group technology based scheduling model. In: Radharamanan R (ed) Robotics and factories of the future ’87. Springer, Berlin, pp 105–110. doi:10.1007/978-3-642-73890-6_14
Power D, Sohal AS (2000) Human resource management strategies and practices in just-in-time environments: Australian case study evidence. Technovation 20(7):373–387. doi:10.1016/S0166-4972(99)00151-0
Recht R, Wilderom C (1998) Kaizen and culture: on the transferability of Japanese suggestion systems. Int Bus Rev 7(1):7–22. doi:10.1016/S0969-5931(97)00048-6
Rodrigues M, Hatakeyama K (2006) Analysis of the fall of TPM in companies. J Mater Process Technol 179(1–3):276–279. doi:10.1016/j.jmatprotec.2006.03.102
Rusu G, Avasilcai S (2014) Linking human resources motivation to organizational climate. Procedia Soc Behav Sci 124:51–58. doi:10.1016/j.sbspro.2014.02.459
Sandanayake YG, Oduoza CF, Proverbs DG (2008) A systematic modelling and simulation approach for JIT performance optimisation. Robot Comput Integr Manuf 24(6):735–743. doi:10.1016/j.rcim.2008.03.013
Seifermann S, Böllhoff J, Metternich J, Bellaghnach A (2014) Evaluation of work measurement concepts for a cellular manufacturing reference line to enable low cost automation for lean machining. Procedia CIRP 17:588–593. doi:10.1016/j.procir.2014.01.065
Shi W, Shang J, Liu Z, Zuo X (2014) Optimal design of the auto parts supply chain for JIT operations: sequential bifurcation factor screening and multi-response surface methodology. Eur J Oper Res 236(2):664–676. doi:10.1016/j.ejor.2013.11.015
Silvestre BS (2015) Sustainable supply chain management in emerging economies: environmental turbulence, institutional voids and sustainability trajectories. Int J Prod Econ 167:156–169. doi:10.1016/j.ijpe.2015.05.025
Singh S, Garg D (2011) JIT system: concepts, benefits and motivation in Indian industries. Int J Manage Bus Stud 1(1):26–30
Singh R, Gohil AM, Shah DB, Desai S (2013) Total productive maintenance (TPM) implementation in a machine shop: a case study. Procedia Eng 51:592–599. doi:10.1016/j.proeng.2013.01.084
Singh N, Jain S, Sharma P (2015) Motivations for implementing environmental management practices in Indian industries. Ecol Econ 109:1–8. doi:10.1016/j.ecolecon.2014.11.003
Spencer MS (1998) Group technology at John Deere: production planning and control issues. In: Suresh N, Kay J (eds) Group technology and cellular manufacturing. Springer, US, pp 501–516. doi:10.1007/978-1-4615-5467-7_29
Tabassi AA, Bakar AHA (2009) Training, motivation, and performance: the case of human resource management in construction projects in Mashhad, Iran. Int J Project Manage 27(5):471–480. doi:10.1016/j.ijproman.2008.08.002
Tams S, Grover V, Thatcher J (2014) Modern information technology in an old workforce: toward a strategic research agenda. J Strateg Inf Syst 23(4):284–304. doi:10.1016/j.jsis.2014.10.001
The Value of JIT-Structured On-the-Job Training (2011) SMT: surface mount technology, vol 26(6), pp 50–54
Tong X, Shi J, Zhou Y (2012) Greening of supply chain in developing countries: diffusion of lead (Pb)-free soldering in ICT manufacturers in China. Ecol Econ 83:174–182. doi:10.1016/j.ecolecon.2011.08.022
Vuppalapati K, Ahire SL, Gupta T (1995) JIT and TQM: a case for joint implementation. Int J Oper Prod Manage 15(5):84–94. doi:10.1108/01443579510083686
White RE, Prybutok V (2001) The relationship between JIT practices and type of production system. Omega 29(2):113–124. doi:10.1016/S0305-0483(00)00033-5
Wuttke DA, Blome C, Henke M (2013) Focusing the financial flow of supply chains: an empirical investigation of financial supply chain management. Int J Prod Econ 145(2):773–789. doi:10.1016/j.ijpe.2013.05.031
Xiong G, Nyberg TR (2000) Push/pull production plan and schedule used in modern refinery CIMS. Robot Comput Integr Manuf 16(6):397–410. doi:10.1016/S0736-5845(00)00023-5
Yasin MM, Small MH, Wafa MA (2003) Organizational modifications to support JIT implementation in manufacturing and service operations. Omega 31(3):213–226. doi:10.1016/S0305-0483(03)00024-0
Yu L, Suojapelto K, Hallikas J, Tang O (2008) Chinese ICT industry from supply chain perspective—a case study of the major Chinese ICT players. Int J Prod Econ 115(2):374–387. doi:10.1016/j.ijpe.2008.03.011
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2016 Springer International Publishing Switzerland
About this chapter
Cite this chapter
García-Alcaraz, J.L., Maldonado-Macías, A.A. (2016). Descriptive Analysis of JIT Benefits. In: Just-in-Time Elements and Benefits. Management and Industrial Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-25919-2_8
Download citation
DOI: https://doi.org/10.1007/978-3-319-25919-2_8
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-25917-8
Online ISBN: 978-3-319-25919-2
eBook Packages: EngineeringEngineering (R0)