Abstract
Business development requires technologically reliable products developed through excellence in project management. This excellence is obtained with advanced project control that should include Earned Value Management (EVM) methodology and project objectives accomplishment orientation. In this work, an analytical model to implement the project objectives control with the EVM is presented. The objectives are periodically measured along the project life with their weights and impact at the end of the project, and then, affecting to the earned value. This provides early indications not only of the project progress but also of the project objectives accomplishment, and highlights the possible need for corrective actions. The analytical model also considers the forecasting of the objectives and their limits at project completion. The model is applied to a case study of engineering product development focusing on getting technical objectives. The generality of the model permits to apply it to any type of project, small or large, in any industry and with any kind of objectives either technical, commercial, economic, etc.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
PMBOK (2004) A guide to the Project Management Body of knowledge. Project Management Institute
Fleming Q, Koppelman J (1998) Earned value project management. J Def Softw Eng
American National Standards Institute (1998) Earned value management systems. ANSI/EIA-748-A-1998
DOD Earned Value Management Implementation Guide. U.S. Department of Defense. http://www.acq.osd.mil/evm/resources/guidance-references.shtml. Accessed 10 February 2012
Humphreys and Associates. http://www.humphreys-assoc.com/evms/evms-implementation-ta-a-18.html. Accessed 17 February 2012
National Aeronautics and Space Administration. NASA. http://evm.nasa.gov. Accessed 3 February 2012
Noori S, Bagherpour M, Zorriasatine F (2008) Designing a control mechanism for production planning problems by means of earned value analysis. J Appl Sci 8(18):3221–3227, ISSN 1812-5654
Vanchoucke M, Vandevoorde S (2008) Earned value forecast accuracy and activity critically. Measurable News Summer (3):13–16
Fleming Q, Koppelman J (2009) The two most useful earned value metrics: the CPI and the TCPI. J Def Softw Eng
Lipke W (2003) Shedule is different. The Measurable News, 31–34
Lipke W, Zwikael O, Henderson K, Anbari F (2009) Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int J Project Manag 27(4):400–407
Pajares J, López-Paredes A (2011) An extension of the EVM analysis for project monitoring: the Cost Control Index and the Schedule Control Index. Int J Proj Manag 29(5):615–621
Acebes F, Pajares J. A new approach of project management under uncertainty. Int J Proj Manag. Accepted 13 August 2013
Solomon P (2001) Practical software measurement, performance-based earned value. J Def Softw Eng
Solomon P (2005) Performance-based earned value. J Def Softw Eng
Solomon P (2006) Practical performance-based earned value. J Def Softw Eng
Solomon P (2008) Integrating systems engineering with earned value management. Meas News 4.
Moslemi L, Shadrokh S, Salehipour A (2011) A fuzzy approach for the earned value management. Int J Proj Manag 29(6):764–772
Malcolm DG, Roseboom JH, Clark CE, Fazar W (1958) Application of a technique for research and development program evaluation. Oper Res 7(5):646–669. doi:10.1287/opre.7.5.646. ISSN 0030-364X
Anbari F (2003) Earned value project management method and extensions. Project Manag J 34(4):12–23
Project Management Institute (2005) The practice standard for earned value management. Project Management Institute
Kerzner H (2003) Project management. A systems approach to planning, scheduling and controlling. Wiley: New York
Kwak Y, Anbari F (2012) History, practices, and future of earned value management in government: perspectives from NASA. Proj Manag J 43(1):77–90
Fleming Q, Koppelman J (2006) Start with “Simple” Earned Value…on All Your Projects. Meas News
Xu J (2010) Project integrated management based on quality earned value. In: Proceedings of the 2nd International Conference on Information Science and Engineering, pp 432–435
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer International Publishing Switzerland
About this chapter
Cite this chapter
Muñoz-Hernández, J.I., Otegi-Olaso, J.R., Rubio-Gómez, J. (2015). Analytical Model Implementing Objectives in EVM for Advanced Project Control. In: García Márquez, F., Lev, B. (eds) Advanced Business Analytics. Springer, Cham. https://doi.org/10.1007/978-3-319-11415-6_7
Download citation
DOI: https://doi.org/10.1007/978-3-319-11415-6_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-11414-9
Online ISBN: 978-3-319-11415-6
eBook Packages: Business and EconomicsBusiness and Management (R0)