Abstract
This chapter’s objective is to discuss the effect of dispersed capacity on planning in manufacturing organisations. The chapter is based on case study research conducted by the authors in a company with geographically dispersed capacity. This is augmented by a questionnaire survey intended to show that the case study company is not unique. The information collected from the two previously mentioned sources is compared with literature. The questionnaire and literature indicated that there are now substantial numbers of companies with dispersed capacity. The case study research indicates that this leads to greater planning complexity because of increased lead-times due to transhipment. In contrast with single-site companies, this complexity cannot be addressed by Just-in-Time in cases where capacity is dispersed. In-depth research has been conducted in only one company, though the questionnaire survey provides supporting data. The chapter implies that companies employing dispersed capacity need to focus on improving their planning systems to cope with the increased complexity. While the literature on Supply Chain Management (SCM) is extensive, there has been relatively little case-based research on the implications of globalisation for planning. In particular, while it is widely believed that many companies have dispersed their capacity, the evidence for this is largely anecdotal. The survey presented in the chapter provides quantitative data to support this belief.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Argyris, C. and Schön, D. (1989), “Participatory Action Research and Action Science Compared: A Commentary”, American Behavioral Scientist, Vol. 32, No. 5, pp. 612–623.
Azevedo,A.L. and Sousa, J.P. (2000), “Acomponent-based approach to support order planning in a distributed manufacturing enterprise”, Journal of Materials Processing Technology, Vol. 107, No. 1–3, pp. 431–438.
Baker, M. J. (2003), ‘The Marketing Book’, Butterworth Heinemann, Oxford.
Ball, M.O., Ma, M., Raschid, L. and Zhao, Z. (2002), ‘Supply Chain Infrastructures: System Integration and Information Sharing’, Sigmod Record, Vol. 31, No. 1, pp. 61–66.
Brady, J. and Davis, J. (1993), ‘Marketing Mid-life Crisis’, McKinsey Quarterly, No. 2, pp. 17–28.
Buttery, A. and Tamaschke, R. (1996), ‘The use and development of marketing information systems in Queensland, Australia’, Marketing Intelligence & Planning, Vol. 14, No. 3, pp. 29–35.
Christopher, M. (1992), ‘Logistics and Supply Chain Management Strategies for reducing Costs and Improving Services’, Managing the Global Pipeline’, Financial Times Pitman, London.
DTI – Department of Trade and Industry (2002), The Government’s Manufacturing Strategy, Department of Trade and Industry, available at: www.dti.gov.uk/manufacturing.
Duffie, N.A. and Prabhu, V.V. (1996). “Heterarchical control of highly distributed manufacturing systems”, International Journal of Computer Integrated Manufacturing, Vol. 9, No. 4, pp. 270–281.
Frederix, F. (2001). “An extended enterprise planning methodology for the discrete manufacturing industry”, European Journal of Operational Research, Vol. 129, No. 2, pp. 317–325.
Gan, B.P., Liu, L., Jain, S., Turner, S.J., Cai, W. and Hsu, W. (2000), ‘Distributed Supply Chain Simulation Across Enterprise Boundaries’, Proceedings of the 2000 Winter Simulation Conference, pp. 1245–1251.
Gupta, A., Whitman, L. and Agarwal, R.K. (2001), ‘Supply Chain Agent Decision and System (SCADAS)’, Proceedings of the 2001 Winter Simulation Conference.
Harrison, D.K. and Petty, D.J. (2002), “Systems for Planning & Control in Manufacturing”, Newnes Publishing, London.
Jain, S., Workman, R.W., Collins, L.M., Ervin, E.C. and Lathrop, A.P. (2001), ‘Development of a High-Level Supply Chain Simulation Model’, Proceedings of the 2001 Winter Simulation Conference, pp. 1129–1137.
Jones, M.C. andArnet, K.P., (1993), ‘Current Practices in Information Management Systems’, Information and Management, Vol. 24, No. 2, pp. 61–69.
Harland, C.M. (1996). “Supply Chain Management: Relationships, Chains and Networks”, British Journal of Management, Vol. 7, Special Issue, pp. S63–80.
Knight, G.A. andYaprak ,A. (2000), ‘Emerging patterns of international business: Implications for public policy’, Advances in International Marketing, Vol. 10, pp. 385–397
Karlsson, C. (2003). “The development of industrial networks: Challenges to operations management in an extraprise”, International Journal of Operations & Production Management, Vol. 23, No. 1, pp. 44–61.
Kotler, P. (2000), ‘Marketing Management, Millennium Edition, Part II’’, Prentice Hall, Englewood Cliffs, NJ.
Labib,A.W. (2008), Computerised Maintenance Management Systems, in “Complex Systems Maintenance Handbook”, Edited by: K.A.H. Kobbacy and D.N.P. Murthy, Springer, Berlin.
Lambert, D.M. and Cooper M.C. (2000), ‘Issues in Supply Chain Management – Don’t Automate, Obliterate’, Industrial Marketing Management, Vol. 29, No. 1, pp.65–83.
Li, S., Duan, Y. Kinman, R. and Edwards, J.S. (1999), ‘A framework for a hybrid intelligent system in support of marketing strategy development’, Marketing Intelligence & Planning, Vol. 17, No. 2, pp. 70–77.
Locomonitor (2005), Foreign direct investment by country – World economic region, available at: http://www.locomonitor.com/index.cfm.
Mason-Jones, R., Naylor, B. and Towill, D.R. (2000). “Engineering the leagile supply chain”, International Journal of Agile Management Systems, Vol. 2, No. 1, pp. 54–61.
Maturana, F.P. and Norrie, D.H. (1996). “Multi-agent Mediator architecture for distributed manufacturing”, Journal of Intelligent Manufacturing, Vol. 7, No. 4, pp. 257–270.
McDonald, M. (1992), ‘Strategic Marketing Planning; A state-of-the-art review.’, Marketing Intelligence & Planning, Vol. 10, No. 4, pp. 4–22.
O’Neill, H. and Sackett, P. (1994). “The Extended Manufacturing Enterprise Paradigm”, Management Decision, Vol. 32, No. 8, pp. 42–49.
Preston S. (2004), “Lost in migration: offshore need not mean outsourced”, Strategy & Leadership, Vol. 32, No. 4, pp. 32 – 36.
Shen, W. (2002). “Distributed Manufacturing Scheduling Using Intelligent Agents”, IEEE Intelligent Systems, Vol. 17, No. 1, pp. 88–94.
Xu, X. and Kaye, G.R. (1995), ‘Building market intelligence systems for environment scanning’, Logistics Information Management, Vol. 8, No. 1, pp. 22–29.
Young R.R. (2000), ‘Managing Residual Disposition: Achieving economy, environmental responsibility; and competitive advantage using the supply chain framework’, Journal of Supply Chain Management, Vol. 36, No. 1, pp. 57–66.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer London
About this chapter
Cite this chapter
Smith, S., Petty, D., Trustrum, D., Labib, A. (2009). Planning in Companies with Dispersed Capacity. In: Dekkers, R. (eds) Dispersed Manufacturing Networks. Springer, London. https://doi.org/10.1007/978-1-84882-468-3_9
Download citation
DOI: https://doi.org/10.1007/978-1-84882-468-3_9
Publisher Name: Springer, London
Print ISBN: 978-1-84882-467-6
Online ISBN: 978-1-84882-468-3
eBook Packages: EngineeringEngineering (R0)