Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Murthy, D. N. P., Solem, O., and Roren, T. (2003), “Product warranty logistics: Issues and challenges,” European Journal of Operational Research, 156, 110–126.
Bowersox, D. J., and Closs, D. J. (1996), Logistical Management: The Integrated Supply Chain Process, McGraw-Hill, New York.
Christopher, M. (1998), Logistics and Supply Chain Management, Strategies for Reducing Cost and Improving Service, 2nd edn, Financial Times Professional Ltd., London.
Coyle, J. J., Bardi, E. J. and Langley, C. J., Jr. (1992), The Management of Business Logistics, West Publishing Company, St. Paul, Minnesota.
Loomba, A. P. S. (1996), “Linkages between product distribution and service support functions,” International Journal of Physical Distribution and Logistics Management 26, 4–22.
Lewis, E. H. (1968), Marketing Channels: Structure and Strategy, McGraw Hill, New York.
Daskin, M. S. (1995), Network and Discrete Location: Models, Algorithms, and Applications, John Wiley and Sons, New York.
Dresner, Z. (ed), (1992), Facility Location: A Survey of Applications and Methods, Springer-Verlag, New York.
Handler, G., and Mirchandani. P. (1979), Locations on Network: Theory and Algorithms, The MIT Press, Cambridge, Massachusetts.
Owen, S. H., and Daskin, M. S. (1998), “Strategic facility location,” European Journal of Operational Research 111, 423–447.
Hadley, G., and Whitin, T. M. (1963), Analysis of Inventory Systems, Prenctice Hall, Englewood Cliffs, New Jersey.
Gupta, S. M., and Korugan, A. (1998), “A multi-echelon inventory system with returns,” Computers and Industrial Engineering 35, 145–148.
Nozick, L. A., and Turnquist, M. A. (2001), “Inventory, transportation, service quality and the location of distribution centers,” European Journal of Operational Research 129, 362–371.
Jayaraman, V., and Srivastava, R. (1995), “A service logistics model for simultaneous siting of facilities and multiple levels of equipment,” Computers and Operations Research 22,191–204.
Cohen, M. A., and Lee, H. L. (1990), “Out of touch with customer needs? Spare parts and after sales service,” Sloan Management Review 31, 55–66.
Klimberg, R. K., and Van Bennekom F. C. (1997), “Aggregate planning models for field service delivery,” Location Science 5, 181–195.
Alfredsson, P. (1997), “Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities,” European Journal of Operational Research 99, 584–595.
Barros, L., and Riley, M. (2001), “A combinatorial approach to level of repair analysis,” European Journal of Operational Research 129, 242–251.
Cassady, C. R., Murdock, W. P., and Pohl, E. A. (2001), “Selective maintenance of support equipment involving multiple maintenance actions,” European Journal of Operational Research 129, 252–258.
Candea, D., and Hax, A. C. (1984), Production and Inventory Management, Prentice-Hall International, Englewood Cliffs, New Jersey.
Sherbrooke, C. C. (1992), Optimal Inventory Modeling of Systems: Multi-echelon Techniques, John Wiley and Sons, New York.
Eisenhardt, K. M. (1989), “Agency theory: An assessment and review,” Academy of Management Review 14, 57–74.
Ackere A. van (1993), “The principal/agent paradigm: Its relevance to various fields,” European Journal of Operational Research 70, 88–103.
Truby, M. (2003), “Ford warranty fight brews,” The Detroit News, August 3, 2003.
Tersine, R. J. (1994), Principles of Inventory and Materials Management, Prentice Hall, Englewood Cliffs, NJ.
Nahmias, S. (1997), Production and Operational Analysis, McGraw-Hill, New York.
Qu, W. W., Bookbinder, J. H. and Iyogun, P. (1999), “An integrated inventory-transportation system with modified periodic policy for multiple products,” European Journal of Operational Research 115, 254–269.
Yano, C. A. (1992), “Optimizing transportation contracts to supply just-in-time deliveries: The case of one contracted vehicle per shipment,” IIE Transactions, 24, 177–183.
Evers, P.T. (2001), “Heuristics for assessing emergency transhipments,” European Journal of Operational Research 129, 311–316.
Hajri, S., Liouane, N., Hammadi, S., and Borne, P. (2000), “A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling,” IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics) 30, 812–818.
Jianer, C. and Miranda, A. (2001), “A polynomial time approximation scheme for general multiprocessor job scheduling,” SIAM Journal on Computing 31, 1–17.
Ponnambalam, S. G., Ramkumar, V, and Jawahar, N. (2001), “A multiobjective genetic algorithm for job shop scheduling,” Production Planning and Control 12, 764–774.
Afrati, F., Cosmadakis, S., Papadimitriou, C. H., Papageorgiou, G., and Papakostantinou, N. (1986), “The complexity of the traveling repairman problem,” Informatique-Theorique-et-Applications 20, 79–87.
Yang, C. E. (1989), “A dynamic programming algorithm for the traveling repairman problem,” Asia-Pacific Journal of Operational Research 6, 192–206.
Agnihothri, S. R. (1998), “Mean value analysis of the traveling repairman problem,” IIE Transactions 20, 223–229.
Blischke, W. R., and Murthy, D. N. P. (1994), Warranty Cost Analysis, Marcel Dekker, New York.
Jack, N., and van der Duyn Schouten, F. (2000), “Optimal repair-replace strategies for a warranted product,” International Journal of Production Economics 67, 95–100.
Jack, N., and Murthy, D. N. P. (2001), “Servicing strategies for items sold with warranty,” Journal of Operational Research 52, 1284–1288.
Iskandar, B. P., and Murthy, D. N. P. (2003), “Repair-replace strategies for two-dimensional warranties,” Mathematical and Computer Modeling, 39, 1233–1241.
Iskandar, B. P., Murthy, D. N. P., and Jack, N. (2005), “A new repair-replace strategy for items sold with a two-dimensional warranty”, Computers and Operations Research, 32, 669–682.
Mahon, B. H., and Bailey, R. J. M. (1975), “A proposed improved replacement policy for army vehicles,” Operational Research Quarterly 26, 477–494.
Zuo, M. J., Liu, B., and Murthy, D. N. P. (2000), “Replacement-repair policy for multi-state deteriorating products under warranty,” European Journal of Operational Research 123, 519–530.
Haugen, D. L., and Hill A. V. (1999), “Scheduling to improve field service quality,” Decision Sciences 30, 783–804.
Maxham, J. G., III, and Netemeyer, R. G. (2002), “Modeling customer perceptions of complaint handling over time: the effect of perceived justice on satisfaction and intent,” Journal of Retailing 78, 239–252.
Healey, J. R. (2003), USA Today, September 3.
Healey, J. R. (2002), USA Today, September 20.
Karmakar, U. S., and Kubat, P. (1983), “The value of loaners in product support,” IIE Transactions 15, 5–11.
Rights and permissions
Copyright information
© 2006 Springer-Verlag London
About this chapter
Cite this chapter
(2006). Warranty Logistics. In: Warranty Management and Product Manufacture. Springer Series in Reliability Engineering. Springer, London. https://doi.org/10.1007/1-84628-258-6_11
Download citation
DOI: https://doi.org/10.1007/1-84628-258-6_11
Publisher Name: Springer, London
Print ISBN: 978-1-85233-933-3
Online ISBN: 978-1-84628-258-4
eBook Packages: EngineeringEngineering (R0)