Abstract
Usually, the tunneling operation is on a critical path in road or railroad construction projects. For minimizing project duration, this study identifies feasible work scenarios, builds simulation models for each scenario, and then analyzes the average duration per unit length of driving distance and efficiency of tunneling equipment. The tunnel work face is usually advanced as far as the ground condition allows the intention to finish the work earlier. As the rock type changes, however, the length per cycle advances, and the work cycle time varies accordingly. Therefore, workflow variability occurs. Workflow variability in tunnel construction operations brings with it waiting time for each work crew and results in delays in the work process. This study evaluates the effects of workflow variability and suggests an approach for shortening the duration of tunneling work by adjusting the driving length of each excavation in the case of two parallel tunnels, not a single tunnel.
Similar content being viewed by others
References
Ballard, G., Harper, N., and Zabelle, T. (2002). “Application of lean concepts and techniques to precast concrete fabrication.” Proceedings IGLC-10, Gramado, Brazil, Aug. 2002.
Extendsim 7 (2007). Imagine that Inc., San Jose, CA.
Kaplan, H., Elburg, A., and Tommelein, I. D. (2005). “Analysis of variability in precasting and installation of pile foundations.” Proceedings Construction Research Congress 2005, 5-7 April 2005, ASCE, San Diego, California.
Kim, K. J. (2010). Technical report: Road construction based on lean concept, Korea Expressway Corporation.
Kim, K. J. and Gibson, G. E. (2003). “Interactive simulation modeling for heavy construction operations.” Automation in Construction, Vol. 12, No. 1, pp. 97–109.
Lee, S., Diekmann, J. E., Songer, A. D., and Brown, H. (1999). “Identifying waste: Applications of construction process analysis.” Proceedings IGLC-7 1999, 26-28 July, Berkeley, CA.
Tommelein, I. D. (1998). “Pull-driven scheduling for pipe-spool installation: Simulation of a lean construction technique.” ASCE, J. of Constr. Engrg. and Mgmt., Vol. 124, No. 4, pp. 279–288.
Tommelein, I. D., Riley, D., and Howell, G. A. (1998). “Parade game: Impact of work flow variability on succeeding trade performance.” Proceedings IGLC’ 98, IGLC-6, 13-15 August’ 98, Guarujá, Brasil.
Walsh, K. D., Hershauer, J. C., Tommelein, I. D., and Walsh, T. A. (2004). “Strategic positioning of inventory to match demand in a capital projects supply chain.” ASCE, J. of Constr. Engrg. and Mgmt., Vol. 130, No. 6, pp. 818–826.
Wikipedia (2012). http://en.wikipedia.org/wiki/NATM (accessed 2012. 06).
Özdemir, L. (2006). North american tunneling 2006, Taylor & Francis, Washington, DC, p. 246, ISBN 0-415-40128-3.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Kim, K.J., Yun, W.G., Lee, Jh. et al. Schedule compression in tunneling projects by adjusting workflow variability. KSCE J Civ Eng 18, 1625–1631 (2014). https://doi.org/10.1007/s12205-014-1466-2
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-014-1466-2