Managing construction risks of AP1000 nuclear power plants in China

  • Published:
Journal of Systems Science and Systems Engineering Aims and scope Submit manuscript

Abstract

Large and complex construction projects face risk from various sources and the successful completion of such projects depends on effective risk management. This study investigates the risk faced by Chinese firms participating in constructing AP1000 nuclear power plants in China. AP1000 nuclear reactors are new, Generation III+ reactors designed by Westinghouse and to be built first in China. The semi-structured interview approach is used to elicit information from experts involved in the AP1000 projects in China. Based on the interviews, various sources of risk are identified. In addition to general risks that megaprojects normally face, there are unique risks that arise from various sources such as technological, political, organizational, and individual personnel risks. Risk management strategies are proposed to manage general and unique risks identified in the study. The findings of this study would be helpful for Chinese companies involved in the construction of AP1000 nuclear power plants to mitigate the risks associated with the projects.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Barber, R.B. (2005). Understanding internally generated risks in projects. International Journal of Project Management, 23(8): 584–590

    Article  Google Scholar 

  2. Bing, L., Akintoye, A., Edwards, P.J. & Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1): 25–35

    Article  Google Scholar 

  3. Carr, V. & Tah, J.H.M. (2001). A fuzzy approach to construct project risk assessment and analysis: construction project risk management system. Advances in Engineering Software, 32(10–11): 847–857

    Article  MATH  Google Scholar 

  4. Chapman, C. & Ward, S. (1997). Project Risk Management: Processes, Techniques and Insights, First Edition. Wiley, UK

    MATH  Google Scholar 

  5. Chen, D. & Sha, Y. (2007). More market players needed if China is to meet nuclear power target-experts. In: An Industry Conference on Renewable Energy in Beijing, 1: 1–2, Beijing, May 18, 2007, Interfax-China

    MATH  Google Scholar 

  6. Cohen, B.L. (1990). The Nuclear Energy Option. Plenum Press, Pittsburgh, PA, USA

    Google Scholar 

  7. Cooke, N.J. (1994). Varieties of knowledge elicitation techniques. International Journal of Human Computer Studies, 41(6): 801–849

    Article  MATH  MathSciNet  Google Scholar 

  8. Corradini, M.L. (2003). Nuclear power: prospects in the 21st century. In: Rohsenow Symposium on Future Trends in Heat Transfer, Massachusetts Institute of Technology, Cambridge, MA

  9. Cullen, J. & Bryman, A. (1988). The knowledge acquisition bottleneck: a time for reassessment? Expert Systems, 5(3): 216–225

    Article  Google Scholar 

  10. Dixon, H.J., Doores, J.W., Joshi, L. & Sinclair, F.L. (2001). Agroecological Knowledge Toolkit for Windows: Methodological Guidelines, Computer Software and Manual for AKT5. School of Agricultural and Forest Sciences, University of Wales, Bangor, UK

    Google Scholar 

  11. Drury, C.G. (1990). Methods for direct observation of performance. In: Wilson, J.R., Corlett, E.N. (eds.), Evaluation of Human Work: A Practical Ergonomics Methodology, pp. 35–57. Taylor and Francis

  12. Dvir, D., Sadeh, A. & Malach-Pines, A. (2006). Projects and project managers: the relationship between project managers, personality, project types, and project success. Project Management Journal, 37(5): 36–48

    Google Scholar 

  13. Edwards, P.J. & Bowen, P.A. (1998). Risk and risk management in construction: a review and future directions for research. Engineering, Construction and Architectural Management, 5(4): 339–349

    Article  Google Scholar 

  14. Evans, A.W., Jentsch, F., Hitt, J.M., Bowers, C., & Salas, E. (2001). Mental model assessments: is there convergence among different methods? In: Proceedings of the Human Factors and Ergonomics Society 45th Annual Meeting, 293–296

  15. Flyvbjerg, B., Bruzelius, N. & Rothengatter, W. (2003). Megaprojects and Risk: An Anatomy of Ambition. Cambridge University Press, Cambridge, UK

    Google Scholar 

  16. Flyvbjerg, B. (2006). From Nobel Prize to project management: getting risks right. Project Management Journal, 37(3): 5–15

    Google Scholar 

  17. Ghosh, S. & Jintanapakanont, J. (2004). Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach. International Journal of Project Management, 22(8): 633–643

    Article  Google Scholar 

  18. Hoffman, R.R., Shadbolt, N.R., Burton, A.M. & Klein, G. (1995). Eliciting knowledge from experts: a methodological analysis. Organizational Behavior and Human Decision Processes, 62(2): 129–158

    Article  Google Scholar 

  19. Hyvari, I. (2006). Success of projects in different organizational conditions. Project Management Journal, 37(4): 31–41

    Google Scholar 

  20. IAEA. (2003). People’s Republic of China, IAEA Energy and Economic Database and Country Information, 210–230. Available via DIALOG. http://www-pub.iaea.org/MTCD/publications/PDF/cnpp2003/CNPP_Webpage/PDF/2002/Documents/Documents/China%20PR%202002.pdf. Cited September 6, 2010

  21. Kutsch, E. & Hall, M. (2005). Intervening conditions on the management of project risk: dealing with uncertainty in information technology projects. International Journal of Project Management, 23(8): 591–599

    Article  Google Scholar 

  22. Madachy, R.J. (1997). Heuristic risk assessment using cost factors. IEEE Software, 14(3): 51–59

    Article  Google Scholar 

  23. Medda, F. (2007). A game theory approach for the allocation of risks in transport public private partnerships. International Journal of Project Management, 25(3): 213–218

    Article  Google Scholar 

  24. Nogueira, J.C. & Raz, T. (2006). Structure and flexibility of project teams under turbulent environments: an application of agent-based simulation. Project Management Journal, 37(2): 5–10

    Google Scholar 

  25. Ou, Y. (2007). The development tendency of nuclear power technologies in the world and position of the third generation nuclear power technologies. In: Conference on the Third Generation Nuclear Power Technologies, 1: 4–9, Shanghai, China, April 25, 2007

    Google Scholar 

  26. Project Management Institute. (2009). A Guide to the Project Management Body of Knowledge (PMBOK Guide), 4th Edition. Project Management Institute, Newtown Square, PA, USA

    Google Scholar 

  27. Sasse, M.A. (1991). How to t(r)ap users’ mental models. In: Tauber, M.J., Ackermann, D. (eds.), Mental Models and Human-computer Interaction 2, pp. 59–79. Elsevier

  28. Schulz, T.L. (2006). Westinghouse AP1000 advanced passive plant. Nuclear Engineering and Design, 236(14–16): 1547–1557

    Article  Google Scholar 

  29. Schvaneveldt, R.W. (1990). Pathfinder Associative Networks: Studies in Knowledge Organization. Ablex Publishing, Norwood, NJ, USA

    Google Scholar 

  30. Shadbolt, N. & Burton, M. (1990). Knowledge elicitation. In: Wilson, J.R., Corlett, E.N. (eds.), Evaluation of Human Work: A Practical Ergonomics Methodology, pp. 321–345. Taylor and Francis

  31. Shaw, M.L.G. & Woodward, J.B. (1990). Modeling expert knowledge. Knowledge Acquisition, 2(3): 179–206

    Article  Google Scholar 

  32. Sundstrom, G.A. (1991). Process tracing of decision making: an approach for analysis of human-machine interactions in dynamic environments. International Journal of Man-machine Studies, 35(6): 843–858

    Article  Google Scholar 

  33. Taylor, H. (2006). Risk management and problem resolution strategies for IT projects: prescription and practice. Project Management Journal, 37(5): 49–63

    Google Scholar 

  34. Turner, J.R. (2005). The role of pilot studies in reducing risk on projects and programmes. International Journal of Project Management, 23(1): 1–6

    Article  Google Scholar 

  35. Westinghouse Electric Company. (2007). AP1000 design control document, APP-GW-GL-700, Revision 16. Pittsburgh, PA, USA

  36. World Nuclear Association. (2007). Nuclear power in China. Available via DIALOG. http://www.world-nuclear.org/info/inf63.html. Cited November 2007

  37. Xiaoliang, D. (2007). Program on self-reliance construction of AP1000. In: Conference on the Third Generation Nuclear Power Technologies, 1: 34–38, Shanghai, China, April 25, 2007

    Google Scholar 

  38. Xie, G., Zhang, J. & Lai, K.K. (2006). Risks avoidance in bidding for software project based on life cycle management theory. International Journal of Project Management, 24(6): 516–521

    Article  Google Scholar 

  39. Zhang, H. (2007a). The third generation nuclear power technologies and the development of China’s nuclear energy industry. In: Conference on the Third Generation Nuclear Power Technologies, 1: 19–21, Shanghai, China, April 25, 2007

    Google Scholar 

  40. Zhang, L. (2007b). The role of the third generation nuclear power technology in China’s nuclear power development. In: Conference on the Third Generation Nuclear Power Technologies, 1: 51–54, Shanghai, China, April 25, 2007

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Liping Fang.

Additional information

Shufeng Wang is a Senior Engineer with China Nuclear Fifth Construction Co., Ltd., Shanghai, China. From 1993 to 1996, he worked in the Pakistan Chashma Nuclear Power Project as a pipe engineer. From 1998 to 2003, Mr. Wang worked in the Second Phase of Qinshang Nucler Power Project as a manager of engineering department. He was a visiting scholar in the Department of Mechanical and Industrial Engineering, Ryerson University, Canada, from 2007 to 2008. Currently he works as a general construction manager and containment vessel project manager in the AP1000 Haiyang project. His professional interests are in the areas of project management and project risk management. He has published a number of journal and conference papers. He received the B.Eng degree in Chemical Engineering from Chengdu University of Science and Technology, Chengdu, Sichuan, China, in 1992, and the MBA degree from Ocean University of China, Qingdao, Shandong, China, in 2010. He received the 2002–2007 Excellence Award from China Nuclear Fifth Construction Co., Ltd.

M.I.M. Wahab is an Assistant Professor of Mechanical and Industrial Engineering at Ryerson University, Toronto, Ontario, Canada. His research involves in the areas of supply chain management, service management, manufacturing system, and intersections between operations research and finance. He has published several journal and conference papers and a book chapter. He received the B.Sc.Eng. degree in Mechanical Engineering from the University of Moratuwa, Sri Lanka, in 1995, the M.Eng. degree in Industrial Engineering from Asian Institute of Technology, Bangkok, Thailand, in 1999, and Ph.D. degree in Industrial Engineering from the University of Toronto, Canada, in 2006. Dr. Wahab is a Registered Professional Engineer in the Province of Ontario, Canada.

Liping Fang is a Professor and Chair of Mechanical and Industrial Engineering with Ryerson University, Toronto, Ontario, Canada, and an Adjunct Professor with the Department of Systems Design Engineering, University of Waterloo, Waterloo, Ontario, Canada. He has actively carried out research and consulting activities in the areas of industrial engineering, systems engineering, engineering management, and decision making, particularly in interactive decision making, multiple criteria decision making, and decision support systems. He has published widely, including two books, an edited book, and numerous journal and conference papers. He received the B.Eng. degree in electrical engineering from Tianjin University, Tianjin, China, in 1982, and the M.A.Sc. and Ph.D. degrees in systems design engineering from the University of Waterloo, in 1985 and 1989, respectively. Dr. Fang is a Registered Professional Engineer in the Province of Ontario, Canada, and a Fellow of the Engineering Institute of Canada (EIC) and Canadian Society for Mechanical Engineering (CSME). He was the recipient of the 2008 Ryerson-Sarwan Sahota Distinguished Scholar Award from Ryerson University and the 2006 Research Excellence Award from the Faculty of Engineering, Architecture and Science, Ryerson University. He is an Associate Editor or Member of the Editorial Board of four international journals, including the IEEE Transactions on Systems, Man, and Cybernetics — Part A, Systems and Humans.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Wang, S., Wahab, M.I.M. & Fang, L. Managing construction risks of AP1000 nuclear power plants in China. J. Syst. Sci. Syst. Eng. 20, 43–69 (2011). https://doi.org/10.1007/s11518-011-5157-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11518-011-5157-y

Keywords

Navigation